Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹23.7 CrAdmitted-Finance | ₹23.7 Cr | L1 | Admitted-Finance |
| Sl No | Description | Qty | Unit | Elliott Ebara Turbomachinery India Pvt Ltd L1 |
|---|---|---|---|---|
| 1.00Design, engineering, manufacture, procurement of materials and bought outcomponents, assembly at shop, inspection, testing at manufacturer's works, packing and delivery of the New Bypass Trim Valve (Item No. PDV-2120(N)) and modification of Power Recovery Expander Generator Package control logic system which includes logics development and implementation of logic in existing PRE control system for the following PRE Generator Package, including supply of all mandatory spares (Note-1 of MR Top Sheet), commissioning spares (Note-2 of MR Top Sheet) & special tools and tackles (Note-3 of MR Top Sheet) & documentation as per the enclosed Scope of work, job specifications, EIL standard specifications, data sheets etc. and other codes and standards attached or referred. | ||||
| 1.10 | TOTAL SUPPLY PRICE ON FOT DESPACTH POINT BASIS.
Item Description: Power Recovery Expander Generator Package
Tag. No.: IF-LZ-006 [ As per MR Item No.: 01.001 ]
(INCLUDING ALL TAXES & DUTIES BUT EXCLUDING GST) | 1 | No. | 22,13,80,312 ₹22.1 Cr |
| 2.00Site Works related to SRR#5 and MCR for the following (Refer Note-4 of MR Top Sheet), as per the enclosed EIL standard specifications, instructions to vendors, job specification, data sheets etc. | ||||
| 2.10 | SITE WORK [ For MR Item No.: 1.001]
[Tag No./Item Code:{02}IF-LZ-006; Item No.: 02.001]
(INCLUDING ALL TAXES & DUTIES BUT EXCLUDING GST) | 1 | lumpsum | 1,52,37,160 ₹1.5 Cr |
| 3.00Transportation from Vendors work/ shop to site for the following as per the commercial section of the NIT/IFB | ||||
| 3.10 | TRANSPORTATION CHARGES [ For MR Item No.: 1.001]
[Tag No./Item Code:{03}IF-LZ-006; Item No.:03.001]
(INCLUDING ALL TAXES & DUTIES BUT EXCLUDING GST) | 1 | No. | - |
| 4.00Supervision of Revamp work at site, testing and commissioning of items specified at item1.00 above, as per enclosed instructions to vendor | ||||
| 4.10 | SUPERVISION CHARGES [ For MR Item No.: 1.001]
[Tag No./Item Code:{08}IF-LZ-006; Item No.:08.001]
(INCLUDING ALL TAXES & DUTIES BUT EXCLUDING GST) | 1 | per diem | 2,73,716 ₹2.7 L |
Updated dates
Tender Value
Refer Docs
EMD Value
₹25 L
Closing Date
19 Dec 2025, 12:00 pmClosed
Mr. L. Thavurya, GM SCM)
EIL GURUGRAM
REVAMP WORK OF POWER RECOVERY EXPANDER GENERATOR PACKAGE (As per API 612) FOR POLYPROPYLENE PROJECT-KOCHI REFINERY OF M/S BHARAT PETROLEUM CORPORATION LIMITED (BPCL)
2025_EIL_883254_1
SS/B895-0IF-KA-MR-5290/48
Open Tender
Miscellaneous Goods
504 days
AS PER BIDDING DOCUMENT
Please refer Tender documents.
16 documents required · 16 mandatory
₹0
₹25 L
Yes
AS PER BIDDING DOCUMENT
21 Apr 2026
29 Oct 2025
22 Dec 2025
29 Oct 2025
19 Dec 2025
13 Nov 2025
29 Oct 2025 - 6 Nov 2025
7 Nov 2025
stage.html
html • 0.02 MB
techsummary_928344.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 26.62 MB
Tendernotice_1 (1).pdf
PDF • 26.62 MB
Download all tender documents and submit your bid