Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Accepted-Technical | Accepted-Technical Accepted |
| 2 | Accepted-Technical | Accepted-Technical Accepted |
| 3 | Accepted-Technical | Accepted-Technical Accepted |
| 4 | Accepted-Technical | Accepted-Technical Accepted |
Tender Value
Refer Docs
Closing Date
9 Feb 2026, 3:00 pmClosed
Er Rakesh kumar tewatia
Sr Executive Engineer Operation and maintenance division BBMB Bhiwani at 400kV substation BBMB Bhiwani
Maintenance and Renovation of Various Parks at 400 KV Sub Station BBMB, Bhiwani
2026_BBMB_261911_1
ENIT08/O M BWN/2025-26
Open Tender
Civil Works
Item Rate
30 days
400 kV Sub station BBMB Bhiwani
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,180
Sr. Account Officer BBMB Delhi
Exempted
11 Feb 2026
8 Jan 2026
10 Feb 2026
8 Jan 2026
9 Feb 2026
8 Jan 2026
Supplying at site of work good quality top soil, free from debris and weeds, from approved site of work with 5 km lead.
Removal of weeds from lawn grass (b) Weeding out of lawn, where weeds are up to 25%, by removal of all weeds and other wild growth with roots by forking including disposal of garden rubbish with all loads and lifts complete
Edging of paths/ beds with bricks/tiles laid dry, including required excavation, refilling, consolidating with hand and spreading surplus (c) Vertical bricks, half brick projecting above ground.
Planting specimen plants in prepared pits and watering.
10mm thick Cement Plaster 1:4
Painting two or more coats excluding priming coat with synthetic enamel paint in all shades on wood work, metallic or plastered, concrete surface to give an even shade.
Compaction of Earth work (c) Compaction of earth work & Preparation of sub grade including loosening, leveling of earth 225mm thick top layer, rough dressing of soil, final dressing of earth to give level, camber, watering, rolling with road roller, compacting the bed to achieve minimum dry density as given in the Table 300-2 as per Technical clause 305 of MORT&H specifications. (In case of link roads earth work to be done by villagers).
Centering and shuttering for sides and soffits of beam, beams, launching girders, bressumers, lintels.
Laying of Dry Brick Ballast 40 mm gauge for flooring.
Cement concrete 1:5:10 With stone aggregate 40mm gauge mixing by mechanical means using concrete mixer volumetric type
tech_bid_open.pdf
tech_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.57 MB
tenderdoc.pdf
Tender Documents • 0.56 MB
BOQ_303627.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .