Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹2.4 LAdmitted-Finance 7 JASWANT NIWAS NAGBANI MACHHLIAN NAGBANI NAGABANI JAMMU JAMMU KASHMIR 181206 | JAMMU | JAMMU AND KASHMIR | 181206 | L1 | Admitted-Finance | ||
| 2 | L2₹3.2 L+₹80,235 (33.6%)Admitted-Finance | L2 | Admitted-Finance | ||
| 3 | L3₹3.5 L+₹1.1 L (45.3%)Admitted-Finance | L3 | Admitted-Finance | ||
| 4 | L4₹4.2 L+₹1.8 L (76.1%)Admitted-Finance | L4 | Admitted-Finance |
Tender Value
₹4.5 L
EMD Value
₹9,000
Closing Date
5 Nov 2026, 6:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
office of the Executive Engineer Jal Shakti (M) GW
office of the Executive Engineer Jal Shakti (M) GW
Re-development of tubewell No. 04 at Udhaywala in District Jammu under UT Capex 2026-27
2026_PHE_329580_1
e-NIT No. GWD/218 of 2026-27
Open Tender
Drilling Works
Percentage
10 days
as per BOQ
as per tender Documents
5 documents required · 5 mandatory
₹500
office of the Executive Engineer Jal Shakti (M) GW
₹9,000
office of the Executive Engineer Jal Shakti (M) GW
10 Nov 2026
28 Oct 2026
6 Nov 2026
28 Oct 2026
5 Nov 2026
30 Oct 2026
29 Oct 2026
240 days
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Re-development of Tube well No. 04 at Udhaywala in District Jammu. The job includes shifting of Air compressor to the site of work along with all requisite accessories. Clearance of site as per requirement in and around of the complex, cutting, leveling and dressing of grounds for erecting of tents and stacking of material after unloading it. Deployment of air compressor at site & lowering of air line along with column pipes & redevelopment of the Tube Well by cleaning all the strainers starting from bail plug to top and again from top to bail plug as per starta chart till the availability of sand free water. The job also includes cost of material such as jointing material nuts and bolts, POL, Pea Shaped Gravel etc.(Complete job in all respects) | 1 | Job | 3,70,000 | ₹3,70,000 |
| 2 | Stabilization & yield testing of Tube well by using V.T/Submersible Pump set of adequate capacity as per specifications till yield of Tube Well and draw down of the Tube Well is ascertained and till the clearance of the sand free water and its discharge at appropriate head. Complete job in all respects i.e. clearance of site, leveling and dressing of ground, providing of POL, tool and tackles, flange jointing material, loading/ unloading of materials, tool and tackles and other allied material with V.T./Submersible Pump Set and stacking properly at Tube Well site.The job includes cost of material and labour charges.(Complete job in all respects) | 1 | Job | 80,000 | ₹80,000 |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.14 MB
tenderdocuments218.pdf
Tender Documents • 0.39 MB
BOQ_1116982.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart shows the information on this page on a best-effort basis and does not guarantee that it is accurate, complete or current. Check it against the buyer's official notice and documents before you act on it; the official record prevails. TenderKart is not liable for any loss or claim arising from the use of this information. If you notice any error or omission, please let us know at .