Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹9.0 LAccepted-AOC | ₹9.0 L | L1 | Accepted-AOC LER |
| 2 | L2₹9.0 LRejected-Finance | ₹9.0 L | L2 | Rejected-Finance AER |
| Sl No | Description | Qty | Unit | JJA INFRA L1 | Sivagurunathan L2 |
|---|---|---|---|---|---|
| 1.00Construction of Retaining Wall @ Adhi dravidar theru in Kollangarai panchayat. | |||||
| 2.00 | Earth work excavation in hard stiff clay soil and all classess of soil and depositing on bank with initial lead and lift as per SS20B. | 37.2 | Cum | 262.8 ₹9,776.16 | 265 ₹9,858 |
| 3.00 | Sand filling with good M.Sand including cost and conveyance of all materials to site including watering and compacting etc complete. | 4.65 | Cum | 2,262.2 ₹10,519.23 | 2,264 ₹10,527.60 |
| 4.00 | Cement concrete with (1:4:8) mix using 40mm ISS HBG metal including cost and conveyance of all materials and labour charges etc complete. | 4.65 | Cum | 6,054.2 ₹28,152.03 | 6,056 ₹28,160.40 |
| 5.00 | Centring charges including strutting including cost and conveyance of casurina props and wood for planks for all RCC items (Below Basement) | 124.92 | Sqm | 546.5 ₹68,268.78 | 549 ₹68,581.08 |
| 6.00 | Centring charges including strutting including cost and conveyance of casurina props and wood for planks for all RCC items (Above Basement) | 3.07 | Sqm | 1,094 ₹3,358.58 | 1,096 ₹3,364.72 |
| 7.00 | Cement concrete with (1:2:4) mix using 20mm ISS HBG metal including cost and conveyance of all materials and labour charges etc complete. | 50.11 | Cum | 7,345.3 ₹3.7 L | 7,347 ₹3.7 L |
| 8.00 | R.C.C (1:1 1/2:3) using 20mm HBG metal including cost and conveyance of all labour charges etc. | 0.44 | Cum | 9,775.9 ₹4,301.40 | 9,778 ₹4,302.32 |
| 9.00 | Supply in cost of Fabrication steel centering including and labour chargesfor etc complete. | 0.03 | Mt | 91,857.5 ₹2,847.58 | 91,860 ₹2,847.66 |
| 10.00Provision for Black topping road | |||||
Tender Value
₹9.1 L
EMD Value
₹9,120
Closing Date
18 Feb 2026, 3:00 pmClosed
Block Development Officer (BP), Thanjavur
Block Development Office, Thanjavur
Thanjavur District - Thanjavur Block - Construction of Retaining Wall at Adhi dravidar theru in Kollangarai panchayat under GF 2025-2026
2026_RDTN_655896_1
Rc.No. 3401/2025/A2 Dated 10.02.2026
Open Tender
Civil Works - Others
90 days
Thanjavur
As per Tender bid document
2 documents required · 2 mandatory
₹0
₹9,120
28 Mar 2026
12 Feb 2026
18 Feb 2026
12 Feb 2026
18 Feb 2026
12 Feb 2026
Construction of Retaining Wall @ Adhi dravidar theru in Kollangarai panchayat.
Earth work excavation in hard stiff clay soil and all classess of soil and depositing on bank with initial lead and lift as per SS20B.
Sand filling with good M.Sand including cost and conveyance of all materials to site including watering and compacting etc complete.
Cement concrete with (1:4:8) mix using 40mm ISS HBG metal including cost and conveyance of all materials and labour charges etc complete.
Centring charges including strutting including cost and conveyance of casurina props and wood for planks for all RCC items (Below Basement)
Centring charges including strutting including cost and conveyance of casurina props and wood for planks for all RCC items (Above Basement)
Cement concrete with (1:2:4) mix using 20mm ISS HBG metal including cost and conveyance of all materials and labour charges etc complete.
R.C.C (1:1 1/2:3) using 20mm HBG metal including cost and conveyance of all labour charges etc.
Supply in cost of Fabrication steel centering including and labour chargesfor etc complete.
Provision for Black topping road
Construction of Granular Sub base by providing well graded material (25 mm to 4.75 mm IRC HBG metal @ 65 %,4.75 to 2.36mm IRC HBG metal @20%&2.36 mm below IRC HBG metal @15%)& (the material passing 425 microns sieve shall have liquid limit and plasticity index not more than 25 & 6% repectively) spreading in uniform layers with motor grader on prepared surface mixing by mix in place method with rotovator at OMC and compacting with three wheel 80-100 KN capacity and finished in accordance with the requirements of the specification and thickness as per approved plans or as directed by the Engineer (Mix -in - place method)
Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete.
Applying PRIMECOAT over WMB/ WMM surface at 7.00Kg of SS-1 Bitumen Emulsion / 10 sq.m including labour for spraying, hire charges for bitumen sprayer etc. Comp.
Applying TACK COAT over Primed WMM surface at 2.5Kg of RS-1 Bitumen Emulsion / 10 sq.m including labour for spraying, hire charges for bitumen sprayer etc. Comp.
Providing and laying Bituminous Concrete to 30mm thick using 0.13 cum of 19.00- 9.50mm, 0.17 cum of 9.50-2.36mm and 0.26 cum of 2.36 and below with 46.28kgs of VG30 bitumen and 4.02Kgs of Waste Plastic for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonne Vibratory to the required density etc., including labour for attending to paver to site etc., including hire charges and fuel charges for 20-30 t CMP with bitumen boiler, tipper trucks, Paver Finisher, Vibratory roller and all other tools and plant required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clause 507 of MORTH Rev-5
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.08 MB
BOQ_786514.xls
BOQ • 0.32 MB
Download all tender documents and submit your bid