| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.1 LAccepted-Finance | ₹1.1 L | L1 | Accepted-Finance Accepted |
| Sl No | Description | Qty | Unit | Parvathi Engineering Construction L1 |
|---|---|---|---|---|
| 1.01 | Normal ground- Excavation of Pole pits (1.25m * 0.5m*1.5m) for 7.32m, 7.5m, 8m, 8.23m poles | 1 | Loc | 450 ₹450 Lowest |
| 1.02 | Normal ground- Erection of 7.32m, 7.5m, 8m, 8.23m poles | 1 | Loc | 500 ₹500 Lowest |
| 1.03 | Rocky ground (Medium)- Excavation of Pole pits (1.25m * 0.5m*1.5m) for 7.32m, 7.5m, 8m, 8.23m poles | 1 | Loc | 700 ₹700 Lowest |
| 1.04 | Rocky ground- Erection of 7.32m, 7.5m, 8m, 8.23m poles | 1 | Loc | 500 ₹500 Lowest |
| 1.05 | Hard rock requiring Blasting and chisseling- Excavation of pole pit (1.25m * 0.5m*1.5m) for 7.32m, 7.5m, 8m, 8.23m poles | 1 | Loc | 10 ₹10 Lowest |
| 1.06 | Hard rock requiring Blasting and chisseling- Erection of 7.32m, 7.5m, 8m, 8.23m poles | 1 | Loc | 10 ₹10 Lowest |
| 2.01 | Normal ground- Excavation of Pole pits (1.25m * 0.6m*1.83m) for 9M & 9.14M poles | 1 | Loc | 530 ₹530 Lowest |
| 2.02 | Normal ground- Erection of 9M & 9.14M poles | 1 | Loc | 600 ₹600 Lowest |
| 2.03 | Rocky ground- Excavation of Pole pits (1.25m * 0.6m*1.83m) for 9M & 9.14M poles | 1 | Loc | 700 ₹700 Lowest |
| 2.04 | Rocky ground- Erection of 9M & 9.14M poles | 1 | Loc | 600 ₹600 Lowest |
Tender Value
₹2.5 L
EMD Value
₹2,460
Closing Date
14 Sept 2026, 2:00 pmClosed
EE/D/U/Tin
The EE/D/U/Tin
Execution of Capital, Improvement and DCW Works in Perumalpuram, Samadhanapuram and Reddiyarpatti in Urban Tirunelveli Division in respect of Tirunelveli EDC
2026_EB_700555_1
EE D U TIN ETWO 22 26 27 Dt 10.08.2026
Open Tender
Electrical Works
Works
Tirunelveli
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹2,460
Yes
19 Sept 2026
2 Sept 2026
15 Sept 2026
2 Sept 2026
14 Sept 2026
2 Sept 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1.01 | Normal ground- Excavation of Pole pits (1.25m * 0.5m*1.5m) for 7.32m, 7.5m, 8m, 8.23m poles | 1 | Loc | 100 | ₹100 |
| 1.02 | Normal ground- Erection of 7.32m, 7.5m, 8m, 8.23m poles | 1 | Loc | - | - |
| 1.03 | Rocky ground (Medium)- Excavation of Pole pits (1.25m * 0.5m*1.5m) for 7.32m, 7.5m, 8m, 8.23m poles | 1 | Loc | - | - |
| 1.04 | Rocky ground- Erection of 7.32m, 7.5m, 8m, 8.23m poles | 1 | Loc | - | - |
| 1.05 | Hard rock requiring Blasting and chisseling- Excavation of pole pit (1.25m * 0.5m*1.5m) for 7.32m, 7.5m, 8m, 8.23m poles | 1 | Loc | - | - |
| 1.06 | Hard rock requiring Blasting and chisseling- Erection of 7.32m, 7.5m, 8m, 8.23m poles | 1 | Loc | - | - |
| 2.01 | Normal ground- Excavation of Pole pits (1.25m * 0.6m*1.83m) for 9M & 9.14M poles | 1 | Loc | - | - |
| 2.02 | Normal ground- Erection of 9M & 9.14M poles | 1 | Loc | - | - |
| 2.03 | Rocky ground- Excavation of Pole pits (1.25m * 0.6m*1.83m) for 9M & 9.14M poles | 1 | Loc | - | - |
| 2.04 | Rocky ground- Erection of 9M & 9.14M poles | 1 | Loc | - | - |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.10 MB
TECH.pdf
Tender Documents • 0.57 MB
BOQ_842071.xls
BOQ • 0.41 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .