Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹1.4 LAdmitted-Fee/PreQual/Technical/Finance | -33.20% | ₹1.4 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L2₹1.7 L+₹25,992.28 (18.3%)Admitted-Fee/PreQual/Technical/Finance | -21.00% | ₹1.7 L+₹25,992.28 (18.3%) | L2 | Admitted-Fee/PreQual/Technical/Finance |
| 3 | L3₹1.7 L+₹28,122.79 (19.8%)Admitted-Fee/PreQual/Technical/Finance | -20.00% | ₹1.7 L+₹28,122.79 (19.8%) | L3 | Admitted-Fee/PreQual/Technical/Finance |
| 4 | L4₹1.7 L+₹32,170.77 (22.6%)Admitted-Fee/PreQual/Technical/Finance | -18.10% | ₹1.7 L+₹32,170.77 (22.6%) | L4 | Admitted-Fee/PreQual/Technical/Finance |
| 5 | L5₹1.8 L+₹38,775.36 (27.2%)Admitted-Fee/PreQual/Technical/Finance | -15.00% | ₹1.8 L+₹38,775.36 (27.2%) | L5 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹2.1 L
EMD Value
₹4,260
Closing Date
14 Sept 2026, 6:00 pmClosed
XEN REW UDHAMPUR
XEN REW UDHAMPUR
BOQ
2026_RDPR_323666_16
3rd Call e-NIT No. 167 REW UDHAMPUR of 2026-27 Dated 05-09-2026
Open Tender
Civil Works
Percentage
30 days
UDHAMPUR
NIT
2 documents required · 2 mandatory
₹600
XEN REW UDHAMPUR
₹4,260
16 Sept 2026
7 Sept 2026
15 Sept 2026
7 Sept 2026
14 Sept 2026
7 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Cost of Sign Board | 1 | no | 3,000 | ₹3,000 |
| 2 | Providing and laying in position cement concrete 1 cement:3 fine sand:6 graded crushed stone aggregates 20mm size excluding the cost of centring and shuttering- all works upto plinth level. | 2.4 | cum | 5,733.6 | ₹13,760.64 |
| 3 | Cetring and shuttering including strutting, propping etc and removal of the formwork. Foundation, footing | 46.8 | Sqm | 286.35 | ₹13,401.18 |
| 4 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level | 848.94 | Sqm | 123.2 | ₹1,04,589.41 |
| 5 | Providing and laying in position cement concrete 1 cement:3 fine sand:6 graded crushed stone aggregates 20mm size excluding the cost of centring and shuttering- all works upto plinth level. | 84.24 | Sqm | 809.9 | ₹68,225.98 |
| 6 | Providing and laying damp-proof Course 50 mm thick with cement concrete 1:2:4 (1 cement:2 coarse sand: 4 graded stone aggregate 20 mm nominal size) and curing complete | 84.24 | Sqm | 86.75 | ₹7,307.82 |
| 7 | Carriage of Sand | 1.06 | cum | 1,237.94 | ₹1,312.22 |
| 8 | Carriage of Stone Aggregates | 2.12 | cum | 685.94 | ₹1,454.19 |
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.90 MB
BOQ_1090224.xls
BOQ • 0.23 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .