| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹16.5 LAccepted-AOC | L1 | Accepted-AOC Karthikeyan construction quoted 1.50 percentage less then the estimate rate | |
| 2 | Not Admitted-Fee/PreQual/Technical | - | Not Admitted-Fee/PreQual/Technical Others-Bidder not willing to join the Tenders they withdraw the tenders Hence, Price Bid may be Not Approved. | |
| 3 | Not Admitted-Fee/PreQual/Technical | - | Not Admitted-Fee/PreQual/Technical Others-Bidder not willing to join the Tenders they withdraw the tenders Hence, Price Bid may be Not Approved. | |
| 4 | Not Admitted-Fee/PreQual/Technical | - | Not Admitted-Fee/PreQual/Technical Others-Bidder Not submitted Proper Pre - Qualification documents and responsive. Hence, Price Bid may be Rejected |
| Sl No | Description | Qty | Unit | Karthikeyan Construction L1 |
|---|---|---|---|---|
| 1.00Construction of Anganwadi Centre Building at Veppilaipatti H/o Kethureddipatti | ||||
| 2.00 | 1. EARTHWORK EXCAVATION for foundation in all soils and sub soils and to full depth as may be directed except in rock requiring blasting but inclusive of shoring, strutting and baling out water wherever necessary and refilling the sides of foundation with excavated earth in layers of not more than 15cm thick, well rammed and consolidated and depositing the surplus earth within the compound in places shown by the departmental officers with initial lead and lift etc.,including levelling the sites complete complying with standard specifications and as directed. (Hard Soil )
i) Column | 37.74 | cum | 258.2 ₹9,744.47 Lowest |
| 3.00 | 2. Supplying and Filling foundation and basement with filling sand in layers not more than 15cm . Thick well ramed, watered and compacted Complete complying with stanard specification. | 4.24 | Cum | 1,640.05 ₹6,953.81 Lowest |
| 4.00 | 3. Filling in Basement with excavated Earth in layers of not more than 15cm. Thick well rammed, watered and consolidated complying with standard specifications etc., complete. | 21.65 | Cum | 38.76 ₹839.15 Lowest |
| 5.00 | 4. Cement concrete 1 : 4 : 8 mix using 40mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed | 12.44 | Cum | 5,041.29 ₹62,713.65 Lowest |
| 6.00 | 5. Cement concrete 1:2:4 mix using 20mm metal including cost and Conveyance of all site etc. Complete. | 1.13 | Cum | 6,421.39 ₹7,256.17 Lowest |
| 7.00 | 6. Brick work in CM 1:5 mix using country bricks ground moulded of size 22 x 11 x 7cm for the following including curing etc., complete complying with standard specifications. | 31.47 | Cum | 5,808.15 ₹1,82,782.48 Lowest |
| 8.00 | 7. Supplying & Erecting centering for sides & soffiots including necessary supports & strutting upto 3.29m height for plane surfaces in all floors with all cross bracings using mild steel sheets of size 90 x 60cm & 10 gauge stiffened, welded with steel angle
Column | 33.8 | Sqm | 474.12 ₹16,025.26 Lowest |
| 9.00 | Basement to Top of Parapet | 31.91 | Sqm | 849.89 ₹27,119.99 Lowest |
| 10.00 | Lintel | 91.36 | Cum | 1,043.06 ₹95,293.96 Lowest |
Tender Value
₹16.8 L
EMD Value
₹16,800
Closing Date
26 Aug 2025, 3:00 pmClosed
Block Development Officer(BP), Kadathur
Block Development Officer(BP), Kadathur
Construction of Anganwadi Centre Building at Veppilaipatti H/o Kethureddipatti
2025_RDTN_592758_1
Roc.No.2309/2025/A3 P01-MLACDS-2025-26
Open Tender
Civil Works
Item Rate
90 days
Block Development Office, Kadathur
Can be seen in the Tender Documents
3 documents required · 3 mandatory
₹0
₹16,800
7 Oct 2025
14 Aug 2025
26 Aug 2025
14 Aug 2025
26 Aug 2025
14 Aug 2025
Amount
Construction of Anganwadi Centre Building at Veppilaipatti H/o Kethureddipatti
1. EARTHWORK EXCAVATION for foundation in all soils and sub soils and to full depth as may be directed except in rock requiring blasting but inclusive of shoring, strutting and baling out water wherever necessary and refilling the sides of foundation with excavated earth in layers of not more than 15cm thick, well rammed and consolidated and depositing the surplus earth within the compound in places shown by the departmental officers with initial lead and lift etc.,including levelling the sites complete complying with standard specifications and as directed. (Hard Soil ) i) Column
2. Supplying and Filling foundation and basement with filling sand in layers not more than 15cm . Thick well ramed, watered and compacted Complete complying with stanard specification.
3. Filling in Basement with excavated Earth in layers of not more than 15cm. Thick well rammed, watered and consolidated complying with standard specifications etc., complete.
4. Cement concrete 1 : 4 : 8 mix using 40mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed
5. Cement concrete 1:2:4 mix using 20mm metal including cost and Conveyance of all site etc. Complete.
6. Brick work in CM 1:5 mix using country bricks ground moulded of size 22 x 11 x 7cm for the following including curing etc., complete complying with standard specifications.
7. Supplying & Erecting centering for sides & soffiots including necessary supports & strutting upto 3.29m height for plane surfaces in all floors with all cross bracings using mild steel sheets of size 90 x 60cm & 10 gauge stiffened, welded with steel angle Column
Basement to Top of Parapet
Lintel
Sunshade
8. Cement concrete 1:1.5:3 using 20mm ISS HBG metal for all RCC item of works excluding cost of Rein forcement and fabricating charges, centering and shuttering but including curing and providing fixtures like fan clamps in the RCC floor or roof slabs
9. Supplying and Fabricating and placing in position MS steel or Ribbed Tor Steel for all Reinforced Cement Concrete works as per the design given including cost of steel and binding wire in all floors etc, Complete complying with stanard specification.
10. Finishing the exposed surface of RCC item of work such as slabs beams, sunshade, facia, canopy slab, staircase waist slab etc., with CM 1:3, 10mm thick. etc., complete complying with standard specifications and as directed by the departmental officers.
11. Plastering with CM 1:4, 20mm thick.over the cement concrete for floor finish including curing etc., complete complying with standard specifications and as directed by the departmental officers. Rate for 10m2.
12. Plastering with CM 1:5, 12mm thick.in all floors including curing etc., complete complying with standard specifications and as directed by the departmental officers.
13. Supplying and applying of two coats of putty of 3mm thick over the exposed RCC surface of ceiling including finishing the joints smoothy with grinding machine including cost and conveyance of all charges etc., complete
14. Finishing the top of roof with one course of machine pressed tiles of size 20 x 20 x 2cm of approved quality laid in CM 1:3, 12mm thick. With water proofing compound confirming to IS by 2% by weight of cement used & the joint pointed neatly to full depth
15. Paving the floor with scratch proof design ceramic tiles of any colour and any size laid in CM 1:3, 20mm thick. And pointing with white cement 0.4 Kg per sqm mixed with colouring pigment to siut the colour of the tiles including finishing the joints neatly completed.
16. Paving the flooring with special type of flooring tiles (Cement based Hydraulically pressed Anti skid tiles (20mm thick) in CM 1:3, 20mm thick including finishing the joints neatly completed.
17. Dadooing walls with Colour Glazed tiles of any colour and any size laid in CM 1:2, 10mm thick. and pointing with white cement 0.4 Kg per sqm mixed with colouring pigment to siut the colour of the tiles including finishing the joints neatly complying with the standard.
18. Providing the following thickness of Granolithic pattern floor finish with Plain Cement concrete 1 : 2 : 4 mix using 10-12mm ISS HBG metal and the top rubed smooth etc., complete complying with standard specification as directed. i. 20mm thick for Resid
19. Distembering two coats using best approved Interiar oil destember with one coat primer over New plastered Surface including cost and conveyance of materials and labour charges etc complete
20. Painting Two Coats Approved Plastic Emultion Paint with one coat primer over New Cement Plastered surface including cost and conveyance of materials and labour charges etc complete.Schedule ItemNo.359 – B)
21. Black Board Paint Two Coats with Approved Cement Paint over Cement Plastered surface including cost and conveyance of materials and labour charges etc complete.
22. Painting two Coats over New iron Works using best quality of enamel paint including cost and conveyance of materials and labour charges etc complete.
23. Supply and Cost of Steel door , Window, Ventilator a) Door D (1.10x 2.40m)
b) Door D1 (0.75 x 1.50m)
c) Door D2 (0.90 x 2.40m)
d) Windows (1.20 x 1.60m)
e) Ventilator (0.90x0.45m)
f) Jolly (0.60x0.45m)
24) Fixing Charges of Steel doors, windows and ventilators Door D (0.90x 2.40m) to Door D2 (0.75 x 2.40m)
Windows (1.20 x 1.60m), Ventilator (0.90x0.45m)
25) Supply and fixing of Cuddappa Slab 25mm Thick including cost and Conveyance of all site etc. Complete.
26) Provision for Electrification arrangements a) Light & Fan Point SD.no.23
b) Supply&Fixing of Tube Light SD.no.88
c) CFL SD.no.80
d) BHF with CFL SD.no.83
e) Supply&Fixing of Street light SD No.94
f) Supply & Fixing of Fan SD.no.110
g) Plug Point SD.no.36
h) S & Fixing DP Main switch SD.no.142
I) S & FixingTNEB Meter board SD.no.125
J) Service pipe SD.no.73
K) Service Connection SD.no.68
L) Service Charge to EB
M) Supply & Fixing of Exhaust Fan SD 114
27) Provision of Water Supply arangment a)1000 Ltr Tank
50mm PVC Pipe
50mm PVC Bend
25mm PVC Pipe
25mm PVC Elbow
25mm PVC Tee
28) Supplying and fixing P.V.C rainwater down fall pipe of 100mm dia with necessary shoes, bends,& clamps etc.,
29) Provision for RWHS including pipes & specials etc., all complete
30) Provision of wash basin
31) Provision of EWC,
32) Provision of Baby IWC
33) Provision towards Drawings
34. Provision for Name Board etc., complete.
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .