Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹1.9 CrAdmitted-Finance | -6.29% | ₹1.9 Cr | L1 | Admitted-Finance |
| 2 | L2₹2.0 Cr+₹4.0 L (2.07%)Admitted-Finance | -4.35% | ₹2.0 Cr+₹4.0 L (2.07%) | L2 | Admitted-Finance |
| 3 | L3₹2.0 Cr+₹6.8 L (3.54%)Admitted-Finance | -2.97% | ₹2.0 Cr+₹6.8 L (3.54%) | L3 | Admitted-Finance |
| 4 | L4₹2.0 Cr+₹8.0 L (4.15%)Admitted-Finance | -2.40% | ₹2.0 Cr+₹8.0 L (4.15%) | L4 | Admitted-Finance |
| 5 | L5₹2.0 Cr+₹11.9 L (6.17%)Admitted-Finance | -0.51% | ₹2.0 Cr+₹11.9 L (6.17%) | L5 | Admitted-Finance |
Tender Value
₹2.0 Cr
EMD Value
₹4.1 L
Closing Date
9 Mar 2026, 6:00 pmClosed
EE PWD DIVISION SANCHORE
EE PWD Dn Sanchore
Construction of BT Road work under Pkg. No. RJ-18-15A/ML/NP/2025-26
2026_CEPWD_538971_1
EE/SCR/19 OF 2025-26
Open Tender
Civil Works
Percentage
120 days
EE PWD Dn Sanchore
As per Tender Docuement
3 documents required · 3 mandatory
₹2,000
EE PWD Dn Sanchore
₹4.1 L
Yes
11 Mar 2026
16 Feb 2026
10 Mar 2026
16 Feb 2026
9 Mar 2026
16 Feb 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1.01 | (A) Galifa to Bhatwas km 0/00 to 06/00 :- Clearing and grubbing road land including uprooting wild vegetation, grass, bushes, shrubs, saplings and trees of girth upto 300 mm, removal of stumps of such trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, upto a lead of 1000 m including removal and disposal of top organic soil not exceeding 150 mm in thickness as per MoRTH Specification Clause 201.By Mechanical Means In area of thorny jungle | 3 | Hect | 15,386 | ₹46,158 |
| 2.01 | Construction of subgrade and earthen shoulders with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of Table 300-2 with lead upto 50 m as per MoRTH Specification Clause 305.3 | 1,440 | cum | 59 | ₹84,960 |
| 3.01 | Providing laying spreading and compacting specified graded sand, gravel (crushed stone) as per Table 400-1,400-2 or any other course material as per design mix, as per CBR in sub base course including premixing the material at OMC in wet mix plant, carriage of mixed material spreading in uniform layers with motor grader F.E loader on a prepared base and compacting with vibratory roller to achieve desired density (as per I.S.2720) including all material, labor, machinery, lighting guarding, barricading and maintenance of diversion complete.[MoRTH specification : Clause 401]. By mechanical means. For Grading-III Material | 2,697.75 | cum | 845 | ₹22,79,598.75 |
| 4.01 | Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with smooth wheel roller 80-100 kN in stages to proper grade and camber, applying and brooming, stone screening & binding materials to fill-up the interstices of coarse aggregate, watering and compacting to the required density grading 1 as per MoRTH Specification Clause 404. Using Crusher Broken Aggregate By Mechanical Means | 506.25 | cum | 1,016 | ₹5,14,350 |
| 5.01 | Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with smooth wheel roller 80-100 kN in stages to proper grade and camber, applying and brooming, stone screening to fill-up the interstices of coarse aggregate, watering and compacting to the required density Grading 2 as per MoRTH Specification Clause 404. using Crusher borken aggregate By Mechanical Means | 1,518.75 | cum | 1,093 | ₹16,59,993.75 |
| 6.01 | Providing and applying primer coat with bitumen emulsion (SS-1) on prepared surface of granular base(WBM/WMM) including cleaning of road surface and spraying primer at the rate of 0.70-1.0 kg/sqm using mechanical means as per MoRTH Specification Clause 502 | 20,250 | Sqm. | 31 | ₹6,27,750 |
| 7.01 | Providing and applying tack coat with Bitumen emulsion (RS-1) using emulsion distributor at the rate of 0.25 to 0.30 kg per sqm on the prepared granular surfaces treated with primer & cleaned with Hydraulic broom as per MoRTH Specification Clause 503. | 22,500 | Sqm. | 11 | ₹2,47,500 |
| 8.01 | Providing, laying and rolling of open-graded premix carpet of 20 mm thickness composed of 13.2 mm to 5.6 mm aggregates either using Viscosity grade bitumen or emulsion to required line, grade and level to serve as wearing course on a previously prepared base, including mixing in a suitable plant, laying and rolling with a three wheel 80-100 kN static roller capacity, finished to required level and grades to be followed by seal coat of either Type A or Type B or Type C as per MoRTH Specification Clause 510. Case - II By Mechanical Means Bitumen (VG-30) | 22,500 | Sqm. | 135 | ₹30,37,500 |
| 9.01 | Providing and laying seal coat sealing the voids in a bituminous surface laid to the specified levels, grade and cross fall using Type A, Type B and Type C as per MoRTH Specification Clause 511 By Mechanical Means Case - II : Type B Bitumen (VG-30) | 22,500 | Sqm. | 44 | ₹9,90,000 |
| 10.01 | Earthwork in excavation for structures as per drawing and MoRTH specifications Clause 304.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material. Upto 3 m depth | 130 | Cum | 178 | ₹23,140 |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 4.06 MB
Tendernotice_2.pdf
PDF • 1.47 MB
BOQ_961023.xls
BOQ • 0.35 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .