Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹17.0 LAccepted-AOC | L1 | Accepted-AOC ACCEPTED | |
| 2 | L2₹17.1 L+₹10,018.20 (0.59%)Rejected-AOC | L2 | Rejected-AOC REJECTED |
| Sl No | Description | Qty | Unit | K MANIKANNAN L2 | SAGUNTHALA V L1 |
|---|---|---|---|---|---|
| 1.00 | Boring, providing and installing Bored cast-in-situ reinforced cement Concrete pile of specified diametre and length below the pile cap in M20 cement concrete to carry a safe working load not less than specified, excluding the cost of steel reinforcement but including Bentonite solution machinery charges labour chargres etc., all complete. 300mm Dia | 8 | Rm | 1,653 ₹13,224 | 1,650 ₹13,200 Lowest |
| 2.00 | Earth work excavation for foundation in Hard stiff clay, stiff black cotton, hard red earth, shales murram, gravel, stoney earth and earth mixed with small size boulders SS 20B and Sand, silt or other loose soil, wet sand, silt not under water, light black cotton soil, sandy loam ordinary soil and to full depth as may be directed except in hardrock requiring blasting inclusive of shoring shuttering and baling out water wherever necessary refilling the sides of foundation with excavated soil other than sand in layers of 15cm thick well rammed and completed, cleaning and levelling the site etc., complete - Footings - First Depth Upto 2.00M | 50.5 | M3 | 262 ₹13,231 | 259.25 ₹13,092.12 Lowest |
| 3.00 | Earth work excavation for foundation in Hard stiff clay, stiff black cotton, hard red earth, shales murram, gravel, stoney earth and earth mixed with small size boulders SS 20B and Sand, silt or other loose soil, wet sand, silt not under water, light black cotton soil, sandy loam ordinary soil and to full depth as may be directed except in hardrock requiring blasting inclusive of shoring shuttering and baling out water wherever necessary refilling the sides of foundation with excavated soil other than sand in layers of 15cm thick well rammed and completed, cleaning and levelling the site etc., complete - Plinth Beam | 7.58 | M3 | 200 ₹1,516 | 197.5 ₹1,497.05 Lowest |
| 4.00 | Supplying and filling in foundation and basement with Crushed Stone Sand (M- Sand) in layers of not more than 15cm thick well rammed watered and compacted etc., complete complying with standard specification. | 9.5 | M3 | 2,431 ₹23,094.5 | 2,428 ₹23,066 Lowest |
| 5.00 | Cement Concrete 1:4:8 (One Cement, Four crushed stone sand and Eight hard broken stone jelly) using 40 mm gauge hard broken granite stone jelly for foundation including dewatering wherever necessary and laid in layers of not more than 15 cm thick well rammed, consolidated and including curing etc. complete complying with standard specification and as directed by the departmental officers -Mixing by mechanical means | 9.5 | M3 | 6,402 ₹60,819 | 6,394 ₹60,743 Lowest |
| 6.00 | Supplying and erecting steel centering including necessary supports for plane surfaces for Reinforced Cement Concrete works such as column footings, column pedestals, plinth beams, grade beams, staircase steps, etc. which require only nominal strutting using mild steel sheets of size 90cm x 60cm and 10 BG stiffened with welded mild steel angles of size 25mm x 25mm x 3 mm for boarding, laid over silver oak joists of size 10cm x 6.5cm spaced at about 75cm centre to centre or at suitable intervals etc. complete in all floors complying with standard specifcation - Plinth Beam | 194.25 | M2 | 712 ₹1,38,306 | 710.8 ₹1,38,072.9 Lowest |
| 7.00Providing and laying in position Standardised Concrete Mix M-20 Grade in accordance with IS 456 - 2000 using 20mm and down graded hard broken granite stone jelly for all RCC items of works with minimum cement contenet of 325Kg/ cum and maximum water cement ratio of 0.55 including admixture (Plasticiser / super plasticiser) in recommended proportions as per IS 9103 to accelerate, related setting of concrete, improve workability without imparing strength and durability with about (5.0cum), 7730Kg of 20mm machine crushed stone jelly and with about (3.3 cum), 5156kg of 10 - 12mm machine crushed stone jelly and with about (4.79cum) 7670 kg of Crushed Stone Sand (M- Sand), but excluding cost of reinforcement grill and fabricating charges centering and shuttering but including laying, vibrating with mechanical vibrators, finishing, curing, etc and providing fixtures like fan clamps in the RCC floor / roof slabs wherever necessary without claiming extra cost etc., complete complying with standard specification and as directed by the departmental officers - The Coarse and Fine aggregates to be used should comply with the requirements of IS standards. | |||||
| 7.01 | Upto Basement | 12.5 | M3 | 8,855 ₹1,10,687.5 | 8,847 ₹1,10,587.5 Lowest |
| 7.02 | Ground floor | 13 | M3 | 9,000 ₹1,17,000 | 8,988 ₹1,16,844 Lowest |
| 8.00 | Supply and fabrication of steel required for all RCC items of works involved in the schedule, cost of steel at site fabrication, labour charges for cleaning the rods straightening, cutting, bending, tying grills, including overlapping to the required length whenever necessary and placing the reinforcement in position as as per design given and specified in the drawings, including cost of binding wire, provision of spacer bars, cover blocks and all other incidental charges etc complete as per standard specification | 2,580 | kg | 95 ₹2,45,100 | 92.96 ₹2,39,836.8 Lowest |
Tender Value
₹18 L
EMD Value
₹18,000
Closing Date
17 Feb 2026, 3:00 pmClosed
Commissioner kumbakonam city Municipal Corporation
Commissioner kumbakonam city Municipal Corporation
Construction of Two Number of shops at ward No 22 Sekkanganni
2026_MAWS_655719_1
1280/2026/E2
Open Tender
Civil Works
Item Rate
180 days
kumbakonam
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹18,000
Yes
1 Oct 2026
12 Feb 2026
17 Feb 2026
12 Feb 2026
17 Feb 2026
12 Feb 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Boring, providing and installing Bored cast-in-situ reinforced cement Concrete pile of specified diametre and length below the pile cap in M20 cement concrete to carry a safe working load not less than specified, excluding the cost of steel reinforcement but including Bentonite solution machinery charges labour chargres etc., all complete. 300mm Dia | 8 | Rm | - | - |
| 2 | Earth work excavation for foundation in Hard stiff clay, stiff black cotton, hard red earth, shales murram, gravel, stoney earth and earth mixed with small size boulders SS 20B and Sand, silt or other loose soil, wet sand, silt not under water, light black cotton soil, sandy loam ordinary soil and to full depth as may be directed except in hardrock requiring blasting inclusive of shoring shuttering and baling out water wherever necessary refilling the sides of foundation with excavated soil other than sand in layers of 15cm thick well rammed and completed, cleaning and levelling the site etc., complete - Footings - First Depth Upto 2.00M | 50.5 | M3 | - | - |
| 3 | Earth work excavation for foundation in Hard stiff clay, stiff black cotton, hard red earth, shales murram, gravel, stoney earth and earth mixed with small size boulders SS 20B and Sand, silt or other loose soil, wet sand, silt not under water, light black cotton soil, sandy loam ordinary soil and to full depth as may be directed except in hardrock requiring blasting inclusive of shoring shuttering and baling out water wherever necessary refilling the sides of foundation with excavated soil other than sand in layers of 15cm thick well rammed and completed, cleaning and levelling the site etc., complete - Plinth Beam | 7.58 | M3 | - | - |
| 4 | Supplying and filling in foundation and basement with Crushed Stone Sand (M- Sand) in layers of not more than 15cm thick well rammed watered and compacted etc., complete complying with standard specification. | 9.5 | M3 | - | - |
| 5 | Cement Concrete 1:4:8 (One Cement, Four crushed stone sand and Eight hard broken stone jelly) using 40 mm gauge hard broken granite stone jelly for foundation including dewatering wherever necessary and laid in layers of not more than 15 cm thick well rammed, consolidated and including curing etc. complete complying with standard specification and as directed by the departmental officers -Mixing by mechanical means | 9.5 | M3 | - | - |
| 6 | Supplying and erecting steel centering including necessary supports for plane surfaces for Reinforced Cement Concrete works such as column footings, column pedestals, plinth beams, grade beams, staircase steps, etc. which require only nominal strutting using mild steel sheets of size 90cm x 60cm and 10 BG stiffened with welded mild steel angles of size 25mm x 25mm x 3 mm for boarding, laid over silver oak joists of size 10cm x 6.5cm spaced at about 75cm centre to centre or at suitable intervals etc. complete in all floors complying with standard specifcation - Plinth Beam | 194.25 | M2 | - | - |
| 7Providing and laying in position Standardised Concrete Mix M-20 Grade in accordance with IS 456 - 2000 using 20mm and down graded hard broken granite stone jelly for all RCC items of works with minimum cement contenet of 325Kg/ cum and maximum water cement ratio of 0.55 including admixture (Plasticiser / super plasticiser) in recommended proportions as per IS 9103 to accelerate, related setting of concrete, improve workability without imparing strength and durability with about (5.0cum), 7730Kg of 20mm machine crushed stone jelly and with about (3.3 cum), 5156kg of 10 - 12mm machine crushed stone jelly and with about (4.79cum) 7670 kg of Crushed Stone Sand (M- Sand), but excluding cost of reinforcement grill and fabricating charges centering and shuttering but including laying, vibrating with mechanical vibrators, finishing, curing, etc and providing fixtures like fan clamps in the RCC floor / roof slabs wherever necessary without claiming extra cost etc., complete complying with standard specification and as directed by the departmental officers - The Coarse and Fine aggregates to be used should comply with the requirements of IS standards. | |||||
| 7.01 | Upto Basement | 12.5 | M3 | - | - |
| 7.02 | Ground floor | 13 | M3 | - | - |
| 8 | Supply and fabrication of steel required for all RCC items of works involved in the schedule, cost of steel at site fabrication, labour charges for cleaning the rods straightening, cutting, bending, tying grills, including overlapping to the required length whenever necessary and placing the reinforcement in position as as per design given and specified in the drawings, including cost of binding wire, provision of spacer bars, cover blocks and all other incidental charges etc complete as per standard specification | 2,580 | kg | - | - |
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_786318.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.65 MB
BOQ_786318.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .