| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹17.7 LAccepted-AOC | ₹17.7 L | L1 | Accepted-AOC accepted |
| 2 | L2₹17.8 LRejected-AOC | ₹17.8 L | L2 | Rejected-AOC more |
| Sl No | Description | Qty | Unit | ARIKRISHNAN L2 | Veeravel contractor L1 |
|---|---|---|---|---|---|
| 1.00 | Earthwork excavation and depositing on bank with an initial lead of 10m and lift of 2m in the following classification of soils as directed by Deparment officers. Hard stiff clay, block cotton, hard red earth shales, murram, ordinary gravel, stoney eart First depth of 2m | 58.32 | Cum | 263.8 ₹15,384.82 | 263.7 ₹15,378.98 |
| 2.00 | 2 nd Depth | 8.75 | Cum | 263.8 ₹2,308.25 | 263.7 ₹2,307.38 |
| 3.00 | Sand filling for foundation with clear river sand including cost of sand watering, ramming and consolidation etc complete as directed by Department officers. | 4.37 | Cum | 2,363.7 ₹10,329.37 | 2,363.5 ₹10,328.50 |
| 4.00 | Cement concrete 1:4:8 (one cement four sand and eight aggregates) using 40mm HBGS for levelling course for foundation including the cost of mixing concrete, ramming, curing etc., complete as directed by Department officers. | 4.37 | Cum | 6,197.9 ₹27,084.82 | 6,197.5 ₹27,083.08 |
| 5.00 | RCC in M30 GRADE using graded aggregtes of HBGs excluding cost of reinforcement, centering, shuttering strutting, but including cost of mixing concrete, placing, vibrating with mechanical vibrator, finishing, curing etc., complete as directed by Department For footing below G.L. ( 1,50 to 4,50 below GL ) | 13.52 | Cum | 9,544.07 ₹1.3 L | 9,544 ₹1.3 L |
| 6.00 | For Column and Brace upto G.L ( 0 to1,50 below GL ) | 1.75 | Sqm | 9,405.3 ₹16,459.28 | 9,405 ₹16,458.75 |
| 7.00 | For column and brace I 0 to 4.50m from GL | 2.83 | Cum | 9,546.37 ₹27,016.23 | 9,546 ₹27,015.18 |
| 8.00 | For column and brace II 4.50m to 7.32m from GL | 2.22 | Sqm | 9,824.26 ₹21,809.86 | 9,824 ₹21,809.28 |
| 9.00 | For column and brace III 7.32 to 10.98m from GL | 2.53 | Sqm | 10,102.15 ₹25,558.44 | 10,102 ₹25,558.06 |
| 10.00 | For column beam floor slab side wall from 10.98m to 14.64 m from GL | 11.38 | Sqm | 10,380.04 ₹1.2 L | 10,380 ₹1.2 L |
Tender Value
₹18 L
EMD Value
₹18,000
Closing Date
11 Nov 2025, 3:00 pmClosed
BDO BP SRIMUSHNAM
Panchayat Union Srimushnam
Construction of New OHT 30000Litre capacity (12m stage) at Ambujavallipettai in Sriputhur Panchayat
2025_RDTN_616735_4
A3/698/2023 PMKKKY 2025-26
Open Tender
Civil Works
180 days
Srimushnam
as per tender
4 documents required · 4 mandatory
₹0
₹18,000
23 Dec 2025
10 Nov 2025
11 Nov 2025
10 Nov 2025
11 Nov 2025
11 Nov 2025
Amount
Earthwork excavation and depositing on bank with an initial lead of 10m and lift of 2m in the following classification of soils as directed by Deparment officers. Hard stiff clay, block cotton, hard red earth shales, murram, ordinary gravel, stoney eart First depth of 2m
2 nd Depth
Sand filling for foundation with clear river sand including cost of sand watering, ramming and consolidation etc complete as directed by Department officers.
Cement concrete 1:4:8 (one cement four sand and eight aggregates) using 40mm HBGS for levelling course for foundation including the cost of mixing concrete, ramming, curing etc., complete as directed by Department officers.
RCC in M30 GRADE using graded aggregtes of HBGs excluding cost of reinforcement, centering, shuttering strutting, but including cost of mixing concrete, placing, vibrating with mechanical vibrator, finishing, curing etc., complete as directed by Department For footing below G.L. ( 1,50 to 4,50 below GL )
For Column and Brace upto G.L ( 0 to1,50 below GL )
For column and brace I 0 to 4.50m from GL
For column and brace II 4.50m to 7.32m from GL
For column and brace III 7.32 to 10.98m from GL
For column beam floor slab side wall from 10.98m to 14.64 m from GL
For side wall, hance and Roof slab from 14.64 m to 18.30 m from GL
Supplying and erecting steel centering for sides and soffits I including necessary supports' and shuttering to the required height for RCC items using MS sheets of suitable size of BG.10 stiffeneq with welded MS angles of size 25mm x 25mm x3mm of boarding Plane Surface,Below GL,For column footing and GL Brace
GL 0m to 3.30 m , For Brace I
5.30m to 6.30 m , For Brace II
8.3. to 9.30 m , For Brace III
11.30 to 12.30m , For Floor Beam and Bottm of Floor slab
14.30m to 15.30 m , For Roof Slab
SQUARE COLUMN For column Below GL
For column GL 0 to 3.30M
For column ( 3.31m to 4.30m ).
For column ( 4.31m to 5.30m).
For Column (5.31m to 6.30m )
For Column (6.31m to 7.30m )
For Column (7.31m to 8.30m )
For Column (8.31m to 9.30m )
For Column (9.31m to 10.30m )
For Column (10.31m to 11.30m )
For Column (11.31m to 11.40m )
CURVED SURFACE 11.30m to 15.30m For Side Wall, & Floor & Roof slab sides and Haunch
Supplying, fabricating and placing in position of HSD steel rods for Reinforcement including the cost of steel and binding wire etc., complete and as directed by Deparment officers.
Painting two coats with approved cement paint over one coat of priming coat over cement plastered exposed surface of the Reservoir including cleaning, preparing the surface and curing etc., complete and as directed by Deparment officers
Providing MS Ladder & Hand rails arrangements in 30,000 Lits. Capacity OHT With 12.00m Staging Height.SOR PG no 90
Providing and fixing of RCC inner access ladder in RCC 1:1.5:3 (one cement, one and half sane! and three aggregates) using 20mm HBG stone for OHT including cost of reinforcement, placing grill in position, centering shuttering charges, mixing concrete cur
Providing GI ventilating arrangements mosquito proof nylon net with 50 mm GI pipes and cowl and as directed by Deparment officers
Supply & Delivery of following Pipes and specials for OHT connection Supply of GI Pipes for OHT Connections 65 mm dia SOR Pg no 40
Supply and Delivery of G.M.Gate valve 65mm size SOR Pg no 45
Supply & Delivery of 65 mm G.I Tee SOR Pg no 44
Supply & Delivery of 65 mm G.I Coupling SOR Pg no 44
Supply & Delivery of 65 mm G.I bend SOR Pg no 44
Supply & Delivery of 90mm T.Coupler PVC SOR Pg no 27
Supply & Delivery of 80mm x 65mm G.I.Reducer SOR Pg no 41
3ply R.I Sheet
Labour charges for fixing of G.I. Pipes & Specials for OHT pipe connections as directed by the Deparment Officers,
Refilling of the foundation with execavated soil in layers of thick including ramming watering etc., complete as directed by the Department officers
Provision for Chloriner set,Ladder Lockset
Earthwork excavation and depositing on bank with an intial lesd & lift in hard stiff clay, gravelly soil, shales, murrams earth mixed soil as per SS 20 B for foundation
Sand filling with good river sand including cost & conveyance of all materials to site and all labour charges for curing, compacting etc., complete.
Cement concrete in 1:4:8 mix using 40 mm metal used for foundation including cost & conveyance of all materials to site and all labour charges for curing, compacting etc., complete.
Cement concrete in 1:3:6 mix using 20 mm metal used for foundation including cost & conveyance of all materials to site and all labour charges for curing, compacting etc., complete.
Plain Cement Concrete 1:2:4 (one cement, two M.Sand and four hard broken stone jelly) using 20mm jelly for wearing coat including laying, compacting, finishing and curing, etc., complete as per standard specificatins and as directed by the departmental officers.
Supplying and erecting centering for sides and soffits including necessary supports and strutting upto 3.29 M height for plane surfaces as detailed below in all floors with all cross bracings using Mild Steel sheets of size 90 x 60 cm and 10 BG stiffened with welded Mild Steel angle of size 25mm x 25mm x 3 mm for boarding laid over silver oak joists of size 10cm x 6.50 cm spaced at abote 90 cm centre to centre and supported by casurina props of 10cm to 13 cm dia spaced at not more than 75 cm centre to centre etc. complete complying with the standard specificaiton. (Payment for centering shall be given after the concrete is laid)
Filling the stones in soakpit incluiding the cost and conveyance of materials 40mm
20mm Metal
Rcc Precast rings
Ring and RCC Cover Slab
Provision for Name Board
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
ARIKRISHNAN (BID ID -1509082)
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Document
0.23 MB
BOQ
BOQ • 0.28 MB
Download all tender documents and submit your bid