Tender Value
₹8.9 Cr
EMD Value
₹6.0 L
Closing Date
26 May 2026, 3:30 pmClosed
Yes (up to 2 members)
No
Single Packet System
Normal Tender
No
Not Applicable
Lowest to Highest
120 days
Expenditure
Capital (Works)
S AND T
2 conditions · 2 needing a document upload
as per tender document all supporting document need to be uploaded
as per tender document all supporting document need to be uploaded
6 conditions · 1 needing a document upload
as per tender document, all supporting document need to be uploaded
Please enter the percentage of local content in the material being offered. Please enter 0 for fully imported items, and 100 for fully indigenous items. The definition and calculation of local content shall be in accordance with the Make in India policy as incorporated in the tender conditions.
Repairing, Refixing/Replacement, Maintenance of S&T Gears/ Equipment for New Bhaupur-New Boraki section including IR connecting lines of EDFC under CGM/Tundla unit for two (02) years
DFC-TDLN-SnT-Maint-2026
DFC-TDLN-SnT-Maint-2026
Open
Works - General
24 Months
Prayagraj, Uttar Pradesh
₹11,800
₹6.0 L
26 May 2026
12 May 2026
12 May 2026
100 items across 3 schedules
| # | Description | Unit | Qty | Rate | Amount |
|---|---|---|---|---|---|
| — | — | — | 95,46,342.36 | ||
| — | 11000.00 | — | — | ||
| Excavation of cable trench as per cable route plan, 1.2 Mtr. deep and of 0.3 Mtr. to 0.6 Mtr. wide at bottom as per RDSO sketches No. SDO/CABLE LAYING/003, issued vide RDSO document no. RDSO/SI/G/2010 Version 1.1 dated 04.02.2014 or latest, alongside the track in normal soil/strata (including soft rock), conforming to distances as per cable route plan and refilling and ramming of loose soil. This work includes clearing of route from bushes etc, covering of cable laid in trench by loose soil for a layer of 50mm thickness approximately before covering by bricks. The work shall be done as per the extant practice on DFCCIL and instructions of DFCCIL Engineer at site. In case the full depth is not available, there shall be proportionate payment but only after the approval of minimum APM/ DyPM officer | — | — | — | 8,24,340 | |
| — | 6.00 | — | — | ||
| Lying of HDPE duct as per the approved cable route plan in the exavated trenches/other protected works/RCC channel etc. including all accessories like end caps, collars, bends, couplers etc. The ends of the duct to be sealed with end plugs till OFC blowing is done. Important: The laying of OFC cable independently or along with Quad cable/PIJF cable in the same trench shall be governed by the RDSO drawings no. RDSO/TCDO/COP-6(a) and RDSO/TCDO/COP-8(a) respectively, issued vide Chapter-XIII of the Telecomm Manual. Note: There are 2 HDPE in each Trenche- T1 & T3. Laying of 2 HDPE ducts in same trench will be considered as one unit of the work | — | — | — | 56,322.06 | |
| — | 45000.00 | — | — | ||
| Laying of S&T Cables of various cores/ pairs/ quads in trenches/ GI pipes/ RCC pipes/ DWC pipes etc. as per the site requirement and as per approved cable route plan. This also includes laying of cables in track crossings & road crossings.(Cables will be meggered before and after its laying by contractor under supervision of DFCCIL Representative and he will submit the meggering report of each testing). Length of the cable laid includes the length of the cable coiled for termination purposes | — | — | — | 3,56,850 | |
| — | 6.00 | — | — | ||
| Blowing/drawing of OFC cable in the HDPE pipe duct already provided in the trench and protective work. The cable shall be laid only after the successful completion of the DIT (Duct Integrity test). The DIT should be certified by the DFCCIL engineer at site. All the equipments/machinery required shall be arranged by the contractor | — | — | — | 1,18,967.64 | |
| — | 50000.00 | — | — | ||
| Supplying and placing of one layer of quality bricks of standard size and of B grade of the local make and spreading on cables laid.(minimum size of brick 200mm X 100mm X 70mm) | — | — | — | 2,50,500 | |
| — | 1000.00 | — | — | ||
| Cutting of all types of platforms/road crossing and trenching and excavation to a width and depth of 300 mm x 300 mm, laying of DWC/HDPE/GI pipe in the trench and refilling and concreting it afterwards as per original condition. In hard rocky ground area, cables will be laid normally on layer of soft earth of 0.05 mtrs thickness previously deposited at bottom of the trench. The cutting to be filled and finished with cement/concrete, as per the RDSO drawing no.SDO/Cable laying/008, issued vide RDSO document no. RDSO/SI/G/2010 Version 1.1 dated 04.02.2014 or latest | — | — | — | 1,84,300 | |
| — | 3000.00 | — | — | ||
| Horizontal direction drilling (HDD)/Trenchless digging/machine drilling without damage to surface road /track for laying/insertion of HDPE/GI/DWC pipe. The bore shall be done at the depth of minimum 1400 mm from the ground level. The ground level shall be considered ignoring the bank height of the bank of the road. Note:- DWC/HDPE/GI Pipe Supply is not covered under this item. Contactor shall provide all material required for work and adequate nos. of labours for proper laying of cables into the bore. Cable shall be laid cautiously so that it should not get damage due to rough handling & pressure on cable. Payment of boring shall be madeonly after DWC/HDPE/GI pipe is laid in the bore | — | — | — | 21,44,910 | |
| — | 500.00 | — | — | ||
| Laying and fixing of Medium class GI pipes 100 mm dia (4.5 mm thickness) as per IS 1239 ( Part 1) 2004 or latest with coupling on culverts/bridges, perforated at a distance of 20 cm or less with 10 mm dia hole, or at any other locations as decided by Site Engineer. The GI pipe is to be filled with chattered compound. It includes supply of all material required for fixing arrangement. Contractor will also supply flexible/corrugated HDPE pipe at the end of GI pipe to protect the cables from sharp edges and sudden bends. The laying and fixing to be done as per RDSO drawings no. SDO/cable laying/011 and SDO/cable laying/012, issued vide RDSO document no. RDSO/SI/G/2010 Version 1.1 dated 04.02.2014, or latest | — | — | — | 2,05,495 | |
| — | 1000.00 | — | — | ||
| Horizontal Boring/Manual moling without damage to surface road /track for laying/insertion of DWC/GI/HDPE pipe. The bore shall be done at the depth of minimum 1400 mm from the ground level. The ground level shall be considered ignoring the bank height of the bank of the road. Note:- DWC/HDPE/GI Pipe Supply is not covered under this item. Contactor shall provide all material required for work and adequate nos. of labours for proper laying of cables into the bore. Cable shall be laid cautiously so that it should not get damage due to rough handling & pressure on cable. Payment of boring shall be made only after DWC/HDPE/GI pipe is laid in the bore | — | — | — | 12,56,620 | |
| — | 60.00 | — | — | ||
| Providing brick masonry in ratio 1:6 cement and mortar including plastering with 1:4 cement and sand mixture both sides of bricks with thickness 20 mm each end with contractor's own 'B' Class bricks. It also includes excavation, grouting, bolting etc. wherever required. 'B' Class bricks, sand and cement (ISI mark) will be supplied by the Contractor | — | — | — | 1,22,605.8 | |
| — | 60.00 | — | — | ||
| Splicing of 24 core optic fibre cable and making the splicing joint with contractor's own machine and tools. Joint should be prepared in such a way that the top of the enclosure shopuld be at a depth of minimum 1.2 mtr and the enclosure should be covered with soft soil and bricks. Splice loss of each fibre should be within acceptable limits, preferably 0.05 dB | — | — | — | 8,36,017.8 | |
| — | 50.00 | — | — | ||
| Installation of thermo shrinks jointing kit as per RDSO Specn.No. IRS: TC 77-2012 (Rev.3.0) with (Amdt.-1 to 3) or latest, suitable for 6 Quad/jelly filled cables for straight through/derivation joints. It includes supply of all the accessories, without transformer | — | — | — | 97,606.5 | |
| — | 20.00 | — | — | ||
| Repairing of half case foundation by excavation and casting it with contractor's cement, brick and other materials as per Drawing No. 1/SG/0005 Rev. B, and as per scope of work. Contractor has to completely break the entire foundation retaining the existing MS frame. The entire work shall be executed by the contractor to the Satisfaction of Site Engineer | — | — | — | 53,035.4 | |
| — | 10.00 | — | — | ||
| Strengthening of foundation of signals, Full/Half location boxes, by carrying out earth work around the foundation, ramming of refilled earth, carrying out masonry work from bottom of earth work using country stones & cement masonry to prevent the earth from slipping down the bank. This also includes supply of required masonry materials | — | — | — | 15,999.9 | |
| — | 20.00 | — | — | ||
| Excavation, casting, curing of foundation and Installation and Erection of Apparatus case Half (App. Case as per RDSO drg. no. RDSO/S-11507 or latest) with contractor's own frame, cement and other material in the ratio 1:3:6.'E' type lock to be supplied and installed with App. case. This includes filling of location foundations with river bed sand and plastering on top with a mixture of 1:4 of cement and sand, ramming of refilled earth. It covers fixing of lamp holder, switch and lamp etc. in Apparatus Case | — | — | — | 2,39,707.6 | |
| — | 10.00 | — | — | ||
| Fabrication and fixing of phenolic laminated sheet/Hylem sheet of grade P3, minimum 10 mm thick, as per Apparatus case diagram/plan, in location box by providing all fixtures like Wago/Disconnect terminals, fuse blocks, fuses, relays on square bars etc. including fixing of PVC coated string rods at the back side for cable support with contractor's own material like iron angle, nuts, bolts etc. The iron angle for fixing shall be minimum 3 mm thick. This also includes fixing of teak wood shelf minimum 25 mm thick for holding track circuit equipment's. The work shall be done as per instructions of Rly engineer at site. (Apparatus case Half) | — | — | — | 28,179.8 | |
| — | 10000.00 | — | — | ||
| Termination of Outdoor Cables (Main Cables /tail cables, through Wago/Disconnect type terminals) at both ends in location boxes, cable termination rack in relay room, station building, generator room etc. The item includes dressing of cables and wires with dressing threads as per standard practice. All material (except terminals) required for this item will be supplied by contractor. The outdoor cable shall be terminated in Relay Room, DG Room, ASM Room etc under supervision and instructions issued by Engineer/incharge of the work | — | — | — | 1,71,300 | |
| — | 10000.00 | — | — | ||
| Fixing of Wago Terminals /Screw less connectors / modular disconnect terminal blocks and fuse blocks on phenolic laminated sheets and fixing by stainless steel/brass nuts & bolts. This includes provision of two additional holes on the board on either side for cable conductor entry. The work shall be carried out as per instructions of Engineer/ Incharge of work | — | — | — | 2,10,100 | |
| — | 10.00 | — | — | ||
| Casting, concreting and curing of foundation for Main Signal Post in the ratio of 1:3:6 as per DFCCIL drwaing no. 1/SG/0003 Rev. B or as per instructions of Engineer/Incharge of the work, using standard size of foundation/galvanized anchor bolts complete, required for erection of colour light signal post. Anchor bolts complete should comply with the RDSO drg. no. SA 116 A/M. Item includes excavation, ramming of CC using vibrator, curing and plastering with 1:4 cement-sand mixture (aggregate will not exceed 3.8 cm). Aggregate, cement, sand and holding down bolts will be supplied by contractor. Any machines & tools, if required for execution of this item, will be arranged/provided by contractor | — | — | — | 1,56,744.2 | |
| — | 10.00 | — | — | ||
| Replacement of old signal unit of shunt signal. This would include releasing of old unit from top of signal post, erection and mounting of new signal unit over the post including wiring of Shunt Signal LED of shunt signal as per Technical Specification | — | — | — | 3,254 | |
| — | 10.00 | — | — | ||
| Replacement of old signal unit /signal route of main signal. This would include releasing of old unit from top of signal post, erection and mounting of new signal unit over the post including wiring of Main Signal LED/Signal route of main signal as per Technical Specification. | — | — | — | 11,234.6 | |
| — | 10.00 | — | — | ||
| Dismantling and Releasing of existing Signals (both electrical and Mechanical) and other associated S&T fittings like wheel, pulleys, wires, stakes etc. | — | — | — | 17,744.5 | |
| — | 10.00 | — | — | ||
| Casting, concreting and curing of foundation for Position Light Shunt Signal as per as per DFCCIL drwaing no. 1/SG/0004 Rev. B or as per instructions of Engineer/Incharge of the work using standard size of foundation/galvanized anchor bolts complete, required for erection of shunt signal post. Anchor bolts complete should comply with RDSO drg. no. SA 110 A/M.. Item includes excavation, ramming of CC using vibrator, curing and plastering with 1:4 cement sand mixture. Aggregate cement, sand and holding down bolts, will be supplied by contractor. Any machines and tools, if required for execution of this item, will be arranged/provided by contractor. | — | — | — | 42,575.8 | |
| — | 10.00 | — | — | ||
| Erection of CLS Post with base and signal unit on top or on Offset Bracket including erection of auxiliary signals like calling on, shunt signal if any. It includes fixing of all LEDs and wiring of complete signal including route and auxilliary signals, if any. It includes fixing of front and back staging, ladder and guards, signal name plates / boards, with contractor's own brackets and fixing materials. The work shall be done as per instructions of DFCCIL engineer at site. It also includes provision & fixing of maintenance platform as per design given by Engineer -In-Charge at site. The Item includes cutting of Signal post if required by Site In charge | — | — | — | 68,224.5 | |
| — | 10.00 | — | — | ||
| Erection of Position Light Shunt signal with Base, Post, Signal unit, complete fixing of LEDs and wiring of full signal. It includes fixing of Number Plates. The work shall be done as per instructions of DFCCIL engineer/Incharge of the work at site | — | — | — | 11,037.2 | |
| — | 5.00 | — | — | ||
| Fixing of junction type Route Indicator on top of signal post and complete wiring .1- Way/2-Way/3-Way/4-Way/5-way/6-Way/theatre type. | — | — | — | 6,452.55 | |
| — | 12.00 | — | — | ||
| Supply , Fabicration and Fixing of Retro-Reflective marker/boards/Plates as per following :'P' Marker -Non illuminated,'AG' marker -Non illuminated ,'A' marker -Non -illuminated and 'G' marker-Non-illuminated as per DFCCIL approved Drawing.All material required for the job such as MS angle, nuts&bolts, Paint & painting materials etc. will be supplied by contractor. | — | — | — | 12,357.72 | |
| — | 6.00 | — | — | ||
| Supply , Fabicration and Fixing of Calling On Board/BSLB Board as per DFCCIL approved Drawing ,on concrete foundation and painting with Retro-Reflective paint.All work to be carried out with contractor own materials and as per DFCCIL site Engineer instructions. | — | — | — | 56,462.88 | |
| — | 6.00 | — | — | ||
| Supply , Fabicration and Fixing of Retro-Reflective Signal Number Plates as per DFCCIL approved Drawing. On Signal Post with Contractor's Own Material like clamp.U bolts Nuts etc. | — | — | — | 5,184.06 | |
| — | 20.00 | — | — | ||
| Supply and installation of earth electrode as per standard practice and as per DFCCIL Drg no. W1/SG/413 Rev D based on DFCCIL Drawing no. S&T/CONST/6.4/97. It includes supply of GI pipe of 3m length. It includes connecting the earth electrode to the equipments which are required to be earthed including digging of earth pit 3 mtr deep and fixing earth electrode pipe, casting of cement concrete enclosure with cover (cover as per drawing no. S&T/CONST/6.3/97. It includes installation of 7 strand GI wires as earth lead wires, supported on MS flat size 5mm x 40 mm, soldering and nut bolt both, one end of both earth lead wire and MS flat to earth electrode and other end to Location boxes, block equipments, power equipments, cable sheath, signals etc. as per site requirement and as per instructions given by engineer incharge | — | — | — | 80,062.2 | |
| — | 5.00 | — | — | ||
| Refixing of electrical point machine, ground connection during phase working (Non interlocked working) after removing the existing fitting if any, adjustment if necessary, cable termination, wiring , testing and commissioning of electrically operated point, fixing and connecting point indicator on derail switch if necessary. The work shall be done as per extant practice in DFCCIL and the instruction of DFCCIL Engineer at site | — | — | — | 20,697.65 | |
| — | 50.00 | — | — | ||
| Lettering / Numbering Termination particulars, equipment names etc., legibly and neatly inside location boxes. Half Case | — | — | — | 6,852.5 | |
| — | 50.00 | — | — | ||
| Lettering and Numbering of all S&T gears like Signals, Loc. Boxes, Pt. Machines, TLJBs, Block joints etc. Each item to be taken as one unit.This work will be carried out as per the standard practice or as per site in charge instructions.Supply of Material required for execution of work are inclusive.Supply of Material required for execution of work are inclusive. | — | — | — | 4,963.5 | |
| — | 650.00 | — | — | ||
| Painting of two coats of Enamel paint over one coat of Red Oxide primer after scrapping and cleaning of the surface. Paint to be of reputed make Asian/Dulux/Berger or similar.App. Cases inside and outside to be done by Silver colour. (Apparatus Case Half) Supply of Material required for execution of work is inclusive | — | — | — | 4,67,616.5 | |
| — | 450.00 | — | — | ||
| Painting of two coats of Enamel paint over one coat of Red Oxide primer after scrapping and cleaning of the surface. Paint to be of reputed make Asian/Dulux/Berger or similar. (Main Signal post, base, unit and complete fittings) Supply of Material required for execution of work is inclusive | — | — | — | 4,77,346.5 | |
| — | 150.00 | — | — | ||
| Painting of two coats of Enamel paint over one coat of Red Oxide primer after scrapping and cleaning of the surface. Paint to be of reputed make Asian/Dulux/Berger or similar. (Shunt Signal post, base, unit and complete fittings) Supply of Material required for execution of work is inclusive | — | — | — | 67,851 | |
| — | 250.00 | — | — | ||
| Painting of two coats of Enamel paint over one coat of Red Oxide primer after scrapping and cleaning of the surface. Paint to be of reputed make Asian/Dulux/Berger or similar. (Point machine and ground connections, Point machine by Black enamel and ground connection by Red oxide) Supply of Material required for execution of work is inclusive | — | — | — | 83,667.5 | |
| — | 200.00 | — | — | ||
| Supply of 25mm x 2mm bare copper strips in the equipment room. Including all accessories & installation | — | — | — | 2,49,562 | |
| — | 50.00 | — | — | ||
| — | 600.00 | — | — | ||
| — | 2000.00 | — | — | ||
| — | — | — | 2,95,560 | ||
| — | 1000.00 | — | — | ||
| — | — | — | 63,390 | ||
| — | — | — | 7,33,12,627.92 | ||
| — | Per | Station per Month | — | ||
| — | 120.00 | — | — | ||
| Execution of Maintenance activities of Electrically Operated Points & KLCR as per Maintenance Schedule (Annexure-D) and attending the S&T failures, non corrosive all temperature Grease (IS-507/508) , Greasing Gun, SAE-30/SHELL 100 oil and other consumables & tools used during maintenance will be supplied by contractor's own cost. Staff deployed should be available 24X7 nearby base station. Deployment of Manpower shall be as per Annexure-E defined in tender document. (CROSSING STATION) | — | — | — | 57,45,504 | |
| — | Per | Station 139070.66 per Month | — | ||
| — | 144.00 | — | — | ||
| Execution of Maintenance activities of Electrically Operated Points & KLCR as per Maintenance Schedule (Annexure-D) and attending the S&T failures, non corrosive all temperature Grease (IS-507/508) , Greasing Gun, SAE-30/SHELL 100 oil and other consumables & tools used during maintenance will be supplied by contractor's own cost. Staff deployed should be available 24X7 nearby base station. Deployment of Manpower shall be as per Annexure-E defined in tender document. (JUNCTION STATION) | — | — | — | 2,00,26,175.04 | |
| — | Per | Station per Month | — | ||
| — | 120.00 | — | — | ||
| Execution of Maintenance activities/Assisting in inspection of LED Signals including Signal Post & CLS unit, Signaling cable & Quad Cable Meggering, Jointing, LC Gates (as and when required), Location Boxes, Junction boxes, Axle Counter Reset boxes, OFC testing, Replacement/ Repairing of S&T assets (Other than covered under CAMC) as per requirement, Maintenance of S&T installations (Auto Location Hut, Telecommunication Hut, Relay Hut, GSM-R Hut & Tower), Restoration works at time of accident/ derailment/Natural Calamity, Earth Testing and repairing of pits/connections etc. as per Maintenance Schedule (Annexure-D) and attending S&T failures. Officials deployed should be available 24X7 nearby base station. Deployment of Manpower shall be as per Annexure-E defined in tender document (CROSSING STATION) | — | — | — | 43,48,904.4 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
HTML
nit.pdf
NIT
Tender_Document22.04.2026.pdf Tender document
ATTACHMENT
Tender_Document22.04.2026.pdf
ATTACHMENT
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .