Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 2 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 3 | Not Admitted-Fee/PreQual/Technical/Finance | Not Admitted-Fee/PreQual/Technical/Finance Not qualified for AOC |
Tender Value
Refer Docs
EMD Value
₹1.9 L
Closing Date
25 Mar 2026, 4:00 pmClosed
EE, PWD, Pakke Kessang Division
Office of the Executive Engineer, Pakke Kessang Division, PWD
C/o Approach road from NH-13 to HortiCulture Garden Mae Taroyar
2026_PWDAP_3200_1
PKD/PSD/NIT/BE/2025-26/11
Open Tender
Civil Works
Item Rate
730 days
Pakke Kessang
Please refer Tender documents.
3 documents required · 3 mandatory
₹2,000
Executive Engineer, Pakke Kessang Division, PWD
₹1.9 L
Executive Engineer, Pakke Kessang Division, PWD
25 Mar 2026
18 Mar 2026
26 Mar 2026
18 Mar 2026
25 Mar 2026
18 Mar 2026
20 Mar 2026
SH: SITE CLEARANCE
Clearing and Grubbing Road Land . (Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned up to a lead of 1000 metres including removal and disposal of top organic soil not exceeding 150 mm in thickness. (i) By Manual Means:- In area of light jungle
SH: EARTH WORK
Excavation in Hill Area in Soil by Mechanical Means (Excavation in soil in hilly area by mechanical means including cutting and trimming of side slopes and disposing of excavated earth with all lifts and lead upto 1000 metres)
Excavation in Hilly Area in Ordinary Rock by Mechanical Means not Requiring Blasting. (Excavation in hilly area in ordinary rock not requiring ballasting by mechanical means including cutting and trimming of slopes and disposal of cut material with all lift and lead upto 1000 metres )
SH: KUTCHA DRAIN
Excavation in Soil by Manual Means. (Excavation for roadway in soil using manual means including loading in truck for carrying of cut earth to embankment site with all lifts and lead upto1000 metres.)
Excavation in ordinary rock by manual means (Excavation in ordinary rock using manual means including loading in a truck and carrying of excavated material to embankment site with in all lifts and leads upto 1000 metres )
SH: RCC Slab Culvert 2.00 Mtr. Span
Excavation for Structures (Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling the excavated earth to the extent required and utilised the remaining earth locally for road work.) I. Ordinary Soil a) Manual Means upto 3m Depth
Ordinary Rock (not requiring blasting) a) Manual Means upto 3m Depth
PCC 1:3:6 in Foundation (Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days.)
Plain/Reinforced cement concrete in sub-structure complete as per drawing and technical specifications a) PCC Grade M15 Height upto 5m
Furnishing and Placing Reinforced/Prestressed cement concrete in super-structure as per drawing and Technical Specification a) RCC Grade M20
a) Supplying, fitting and placing HYSD bar reinforcement in super-structure complete as per drawing and technical specifications
Stone masonry work in cement mortar 1:3 in Sub-structure complete as per drawing and Technical Specification a) Square Rubble Coursed rubble masonry( first sort )
b) Random Rubble Masonry
Providing weep holes in Brick masonry/Plain/Reinforced concrete abutment, wing wall/return wall with 100 mm dia AC pipe, extending through the full width of the structure with slope of 1V :20H towards drawing foce. Complete as per drawing and Technical specifications
12 mm cement plaster 1 : 3 (1 cement : 3 fine sand).
Back filling behind abutment, wing wall and return wall complete as per drawing and Technical specification Granular Material
SH: GSB
Preparation of sub grade (Preparation of sub grade by excavating earth to an average depth of 22.50 cm, dressing to camber and consolidating with road roller, making good the undulations etc. and disposal of surplus earth, lead upto 50 m.)
Consolidation of sub-grade with road roller of 8 to 12 tonne capacity including making good the undulations etc. with earth or quarry spoils etc and rerolling the sub grade.
Granular Sub-Base with Coarse Graded Material ( Table:- 400- 2) (Construction of granular sub-base by providing coarse graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with vibratory roller to achieve the desired density, complete as per clause 401) 401 )(i) for grading- I Material
Centring and shuttering including strutting proping etc. and removal of form work for: a) Walls including attached buttresses, pilasters and their caps and bases and string courses etc. up to floor two level.
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.29 MB
SBD_MAE_TAROYAR.pdf
Tender Documents • 3.68 MB
BOQ_3397.xls
BOQ • 0.28 MB
DOC-20260324-WA0095.pdf
PDF • 0.70 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .