Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹60.8 LAdmitted-Finance | +23.00% | ₹60.8 L | L1 | Admitted-Finance |
| 2 | L2₹61.8 LAdmitted-Finance PLOT NO 4 A SHOP NO 03 SECTOR 12 A KOPARKHAIRNE NAVI MUMBAI 400 709 | THANE | MAHARASHTRA | 400709 | +25.00% | ₹61.8 L | L2 | Admitted-Finance |
Tender Value
₹50.0 L
EMD Value
₹50,000
Closing Date
4 May 2026, 4:00 pmClosed
Dy.Commisnor, BNCMC.
Bhiwandi Nizampur City Municipal Corporation,Kaap Ali,Bhiwandi
REPAIRING OF ROAD USING MASTIC IN THE AREA OF WARD OFFICE NO 05 BNCMC
2026_BNMC_1298358_1
BNCMC/PWD 10/2026_3
Open Tender
Civil Works
240 days
Bhiwandi Nizampur City Municipal Corporation, Kaap
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,180
₹50,000
12 May 2026
27 Apr 2026
5 May 2026
27 Apr 2026
4 May 2026
27 Apr 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount | Item Code |
|---|---|---|---|---|---|---|
| 1 | REPAIRING OF ROAD USING MASTIC IN THE AREA OF WARD OFFICE NO, 05, BNCMC yearly tender (2026-27) | - | - | - | - | BI01010001010000000000000515BI0100001112 |
| 2 | Excavation for foundation in earth, soil of all types, sand, gravel and soft murum, including removing the excavated material up to a distance of 50 m. beyond the building area and stacking and spreading as directed, dewatering, preparing the bed for the foundation and necessary back filling, ramming, watering including shoring and strutting etc. complete. (Lift upto 1.5 m.) By Mechanical Means | 450 | Smt | 207 | ₹93,150 | BI01010001010000000000000515BI0100001113 |
| 3 | Removing the excavated stuff including all loading, unloading and transportation lead up to 5km. Etc.complete. | 450 | Smt | 252.22 | ₹1,13,499 | BI01010001010000000000000515BI0100001114 |
| 4 | Provinding and supplying Excavator (JCB JS 80 ) | 48 | Cmt | 1,272 | ₹61,056 | BI01010001010000000000000515BI0100001115 |
| 5 | Providing and applying tack coat on the prepared surface heating by fames in Boiler and spraying bitumen with sprayer on Dry / Hungry B.T. surface 3 kg/10 sqm. (VG-30 bulk bitumen rates are considered to arrive at rates) 141/3.31 | 1,774.17 | Cmt | 21 | ₹37,257.57 | BI01010001010000000000000515BI0100001116 |
| 6 | DENSE BITUMINOUS MACADAM: Proving and laying dense bituminous macadam using crushed aggregates of Grading 1, premixed with bituminous binder of specified grade of Bitumen @ 4.50 per cent by weight of total mix and filler, transported to site with VTS , laid over a previously prepared surface, finished to the required grade, level,alignment, and rolling to achieve the desired density for 76-100 mm compacted thickness .USING Batch mix type hot mix plant with SCADA, Sensor Paver, Vibratory roller with Stone Dust filler.(VG-30 bulk bitumen rates are considered to arrive at rates) | 82.5 | Cmt | 9,664 | ₹7,97,280 | BI01010001010000000000000515BI0100001117 |
| 7 | Providing and laying 12 mm thick mastic asphalt wearing course on top of deck slab excluding prime coat with paving grade bitumen meeting the requirements given in table 500-29, prepared by using mastic cooker and laid to required level and slope after cleaning the surface including providing antiskid surface with bitumen precoated fine grained hard stone chipping of 4.75 mm nominal size at the rate of 0.005 cum per 10 One Square Metre and at an approximate spacing of 10 cm center to center in both directions, pressed into surface when the temperature of surfaces not less than 100 deg C, protruding 1 mm to 4mm over mastic surface as per clause 515 etc. complete. 484/14.55a | 5,168.4 | Cmt | 496 | ₹25,63,526.4 | BI01010001010000000000000515BI0100001118 |
| 8 | BITUMINOUS CONCRETE:- Providing and laying bituminous concrete using crushed aggregates of grading 1, premixed with bituminous binder @ 5.20 per cent by weight of total mix and filler, transported to site with VTS , laid over a previously prepared surface, finished to the required grade, level, alignment, and rolling to achieve the desired compaction for 50 mm compacted thickness with specified grade of Bitumen,Excluding prime / tack coat. For Bitumen of specified grade -- USING Batch mix type hot mix plant with SCADA, Sensor Paver, Vibratory roller with Stone Dust filler. (VG-30 bulk bitumen rates are considered to arrive at rates) | 30.45 | Cmt | 10,599 | ₹3,22,739.55 | BI01010001010000000000000515BI0100001119 |
| 9 | add 5% corporation charges | - | Nos | 1,99,425.43 | - | BI01010001010000000000000515BI0100001120 |
| 10 | add 18 gst | - | Nos | 7,53,828.11 | - | BI01010001010000000000000515BI0100001121 |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.25 MB
BOQ_2230001.xls
BOQ • 0.29 MB
3-B1mastic.pdf
Tender Documents • 2.12 MB
Download all tender documents and submit your bid