Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹1.5 LAdmitted-Finance 19 B T ROAD BELGHORIA KOLKATA 700056 | 24 PARAGANAS NORTH | WEST BENGAL | 700056 | +0.00% | ₹1.5 L | L1 | Admitted-Finance |
| 2 | L2₹1.5 LAdmitted-Finance 38 JOY GOPAL ROYCHOWDHURY ROAD PANIHATI KOLKATA KOLKATA KOLKATA 700114 | 24 PARAGANAS NORTH | WEST BENGAL | 700114 | +1.37% | ₹1.5 L | L2 | Admitted-Finance |
| 3 | L3₹1.6 LAdmitted-Finance 337 C INDIRA GANDHI ROAD KONNAGAR HOOGHLY 712235 | KONNAGAR | HOOGHLY | WEST BENGAL | 712235 | +4.00% | ₹1.6 L | L3 | Admitted-Finance |
Tender Value
₹1.5 L
EMD Value
₹3,010
Closing Date
27 Mar 2026, 2:00 pmClosed
EE WS BPS
S.P.MUKHERJEE ROAD KOLKATA-700026
CONSTRUCTION OF GAURD WALL AND I.P PASSAGE AT THE BACK SIDE OF CAMPUS AT SIRITY BPS
2026_KMC_1021017_1
KMC/WS/SBPS/2025-26/12
Open Tender
CIVIL WORKS
21 days
SIRITY BOOSTER PUMPING STATION
Please refer Tender documents.
4 documents required · 4 mandatory
₹0
₹3,010
16 May 2026
13 Mar 2026
30 Mar 2026
13 Mar 2026
27 Mar 2026
13 Mar 2026
BUILDING WORKS (A) EARTH WORK,ANTITERMITE TREATMENT 2. Earth work in excavation of foundation trenches or drains, in all sorts of soil (including mixed soil but excluding laterite or sandstone) including removing, spreading or stacking the spoils within a lead of 75 m. as directed. The item includes necessary trimming the sides of trenches levelling, dressing and ramming the bottom, bailing out water as required complete. (a) Depth of excavation not exceeding 1,500 mm.
BUILDING WORKS (A) EARTH WORK,ANTITERMITE TREATMENT 4. (A) Filling in foundation or plinth by silver sand in layers not exceeding 150 mm as directed and consolidating the same by thorough saturation with water, ramming complete including the cost of supply of sand. (payment to be made on measurement of finished quantity)
BUILDING WORKS ( C ) BRICKWORKS, CONCRETE WORKS Etc. A. BRICK WORKS 1. Single Brick Flat Soling of picked jhama bricks including ramming and dressing bed to proper level and filling joints with local sand.
BUILDING WORKS ( C ) Brickworks,Concrete Works etc B. CONCRETE WORKS 1. Cement concrete with graded jhama khoa (30 mm size) excluding shuttering In ground floor and foundation (a) 1:3:6 proportion
BUILDING WORKS (B) DISMANTLING, CUTTING CHASE, HOLES ETC 13. Removal of rubbish,earth etc. from the working site and disposal of the same beyond the compound, in conformity with the Municipal / Corporation Rules for such disposal, loading into truck and cleaning the site in all respect as per direction of Engineer in charge
BUILDING WORKS ( C ) Brickworks,Concrete Works etc A. BRICK WORKS 7. Brick work with 1st class bricks in cement mortar (1:4) (a) In foundation and plinth
SECTION 1. ------------BUILDING WORKS (I) PLASTERING, POINTING ETC. A. ORIGINAL WORKS 1.Plaster (to wall, floor, ceiling etc.) with sand and cement mortar including rounding off or chamfering corners as directed and raking out joints including throating, nosing and drip course, scaffolding/staging where necessary (Ground floor).[Excluding cost of chipping over concrete surface](ii) With 1:4 cement mortar (a) 20 mm thick plaster
SECTION 1. ------------BUILDING WORKS (K) PAINTING, VERNISHING ETC A. ORIGINAL WORKS 1 (b) Priming one coat on timber or plastered surface with synthetic oil bound primer of approved quality including smoothening surfaces by sand papering etc. (This item is applicable to new work or old work when the original surface has been exposed by removal of old paint.)
SECTION 1. ------------BUILDING WORKS (K) PAINTING, VERNISHING ETC A. ORIGINAL WORKS 2 (A) Painting with best quality synthetic enamel paint of approved make and brand including smoothening surface by sand papering etc. including using of approved putty etc. on the surface, if necessary : (a) On timber or plastered surface :With super gloss (hi-gloss) -(ii) Two coats (white in shade)
MATERIALS AND LABOUR 1. Building (B) Labour Rates Per Diem : 3)Mazdoor (Male). Note: (I)The above rates of labour are exclusive of 10% contractors profit and 1% Labour welfare cess which would be admissible to the Contractors, but contractual percentage will not be applicable. (II) The workersemployed on high rise building or any structure over 30 ft in height and also workers engaged in Tunnel shall be paid 20% extra wages.
Sub Total
Please Enable Macros to View BoQ information
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.07 MB
BOQ_2509587.xls
BOQ • 0.25 MB
techbid.pdf
Tender Documents • 0.51 MB
Download all tender documents and submit your bid