Public Works Department
Bharath
Construction of a cross-culvert within the Kunaghattahalli village limits on the road from Jodimallapura via Taluru Koppalu connecting to the Honnenahalli-Kellangere-Tumakuru-Honnavar road, completion of remaining development works within the Kadaiyanakoppalu village limits on the road connecting T.D Road to M.C.F. Road and road shoulder widening works at Km 6.00 and 6.90 on the Kallanayakanahalli to Arekere road, Km 3.50 and 4.15 on the Yadapura-Muddanahalli-Murundi route connecting to the Harnahalli-Sakharayapatna road, and Km 12.00 and 12.50 on the road from Tumakuru-Honnavar road via Harnahalli-Boranakoppalu connecting to the Huliyar-Keralapura road In Arsikere Taluk
PWD/2025-26/RD/WORK_INDENT23630
PWD/2025-26/RD/WORK_INDENT23630
Open
Roads
Two Tender Document System(Two Cover)
PWD Division Office Hassan
6 documents required · 6 mandatory
Tenderer or his identified Sub Contractor should possess valid Electrical License for executing building electrificatio works and should have executed similar electrical works totallng Rs. xxxxxx (not less than 50% of electrical works) n any one year
Tenderer or his identified Sub Contractor should possess valid license for executing water supply / sanitary engineering works and should have executed similar works totallng Rs. xxxxxx (not less than 50% of electrical works) n any one year
Owning the following key and critical equipment for this work (xxxx, xxxx, xxxx)
Total value of civl engineering works executed and payments received in the last five years (year-wise)
List of existing commitments and ongoing works
List of works for which tenders already submitted
Banker Details for reference
Construction equipment owned by the tenderer and equipment proposed to be deployed on this contract, if awarded
Reports on the financial standing of the tenderer, such as profit and loss statements and auditor’s reports for the last five years
Qualification and experience of the key technical and management personnel in permanent employment with the tenderer and those that are proposed to be deployed on this contract, if awarded
List of Financial Resources with Certificates
ITT Clause 3.2 To qualify for award of this contract, each Tenderer in his name should have in the last five years period i.e.,2020-21 to 2024-25 (b) Mandating Satisfactorily completion as prime contractor, for atleast one similar work to an extent of value not less than Rs. 45.83 lakhs (Updated to 2025-26 Price Level) (usually not less than 50percent cost of the work))
ITT Clause 3.2 (c) Executed in any one year i.e 2020-21 to 2024-25 the following minimum quantities of work1. Earth work-3484.00 Cum, 2.GSB 274.45Cum 3.WMM 288.86Cum 4.Concrete507.16Cum 5.Steel 4.15Tonnes usually 80percent of peak annual rate of construction.
ITT Clause 3.6 Tenderers who meet the above specified minimum qualifying criteria, will only be qualified, if their available tender capacity is more than the total tender value. The available tender capacity will be calculated as under : Assessed available tender capacity:(AxNx2.5 -B ) should be greater than or equal to Rs91.65 lakhs where A-Maximum value of works executed in any one year during the last five years taking into account the completed as well as works in progress. (Updated to 2025-26 Price level) N-Number of years prescribed for completion of the works for which tenders are invited-3 Months. B-Value, at 2025-26 price level, of existing commitments and on-going works to be completed during the next 3 Months. (Period of completion of the works for which tenders are invited)
ITT Clause 3.2 To qualify for award of this contract, each Tenderer in his name should have in the last five years period i.e.,2020-21 to 2024-25 (a) Achieved in atleast two financial years an average financial turnover of Rs. 91.65 Lakhs Updated to 2025-26 Price Level, Usually not less than the estimated cost
ITT Clause 3.3 Each Tenderer should further demonstrate (b) Liquid assets and /or availability of credit facilities of not less than Rs27.50Lakhs (credit lines / letter of credit/ certificates from Nationalized banks) for meeting the fund requirement etc (usually 30percent of the amount of contract) (The fomat should be as per KW-3 Bid document Section-3 Para 1.10)
KPWD Class-III and above Registration Certificate
Contractors has to upload the EPF Registration
₹2,300
₹1.8 L
20 Feb 2026
11 Feb 2026
21 Feb 2026
18 Feb 2026
Construction of a culvert at Kunaghattahalli limits from Jodimallapura to Tumakuru-Honnavar road, Remaining work in Kadaiyanakoppalu limits to T.D Road to M.C.F. Road and road shoulder widening works at Km 6.00 and 6.90 on the Kallanayakanahalli to Arekere road, Km 3.50 and 4.15 on the Yadapura-Murundi connecting to Harnahalli road and Km 12.00 and 12.50 km road from Tumakuru-Honnavar road Harnahalli-Boranakoppalu connecting to the Huliyar-Keralapura road In Arsikere Tq.
2.5.ii.a Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut ... 2.89 100 m2
16.8.b Surface Drains in Soil - Construction of unlined surface drains of average cross- sectional area 0.40 m2 in soil to specified lines, grades, levels and dimensions. Excavated mate... 200.00 m
3.5 Scarifying the existing bituminous road surface to a depth of 50 mm and disposal of scarified material by Mechanical Means using Hydraulic excavator with in all lifts and lead. Ref to MoRT&H : IRC - 3... 1611.00 m²
3.4.ii Scarifying Existing Granular Surface to a Depth of 50 mm by Mechanical Means using Hydraulic excavator. Ref to MoRT&H : IRC - 305.4.3 ---- With all lead and lift including cost and conveyanc... 1698.75 m²
3.11 Preparation and Surface Treatment of Formation. - Preparation and surface treatment of formation by removing mud and slurry, watering to the extent needed to maintain the desired moisture content, t... 3575.20 m²
1.8 Manual Means -
Construction of Embankment by excavating the available approved Gravel/ Murrum deposited at a place or borrow pits during or prior excavation with all lifts and lead, transporta... 50.00 m³
4.2.B.v Granular Sub-Base - By Mix in Place Method - Construction of Granular Sub-Base of required grading as per design spreading in uniform layers with motor grader on prepared sur... 343.06 m³
4.17 Wet Mix Macadam (Plant Mix Method) - Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC ... 361.08 m³
16.28 Providing and constructing un-reinforced plain cement concrete pavement, thickness as per design, over a prepared sub base, with 43 grade cement or any other type as per Clause 150... 567.84 m³
3.6 Construction of Subgrade and Earthen Shoulders - Construction of sub-grade and earthen shoulders with approved material obtained from borrow pits with all lifts & leads, transporting... 435.47 m³
1.14.1 Mechanical Means -
Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, stru... 134.64 m³
2.1.3 Providing and laying in position Cement Concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates ... 14.19 m³
2.4.2 Providing and laying in position Cement Concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works fro... 51.92 m³
2.11.h Steel Fabrication
Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting,... 5.19 t
1.10 Manual Means -
Refilling available earth around trenches/pipelines, cables in layers not exceeding 20 cms in depth, compacting Each deposited layer by ramming after watering with a lea... 15.05 m³
8.5.iii Retro-Reflectorised Traffic Signs - Providing and fixing of retro- reflectorised cautionary, mandatory and informatory sign as per IRC:67:2022 made of Class B Type IV ret... 7.00 each
8.7 Direction and Place Identification Signs upto 0.9 m2 Size Board. - Providing and erecting direction and place identification retro- reflectorised sign as per IRC:67:2022 made of high intensity... 5.40 m²
8.54 Providing and fixing board displaying information, such as Name of work, Tender cost, Name of Contractor, Work completion and liability period etc, having rectangular shape of 1.2... 2.00 No.
1.14.1 Mechanical Means -
Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, stru... 634.20 m³
1.8 Manual Means -
Construction of Embankment by excavating the available approved Gravel/ Murrum deposited at a place or borrow pits during or prior excavation with all lifts and lead, transporta... 2846.99 m³
1.7 Manual Means -
Construction of Embankment with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded with desired compaction. (R... 253.69 m³
14.4.A Providing and laying Pitching on slopes laid over prepared filter media including boulder apron laid dry in front of toe of embankment complete as per drawing and ... 495.72 m³
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
I No 23630 kw-3 others.docx
Tender Document • 0.95 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .