Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | H2₹1.8 LAccepted-AOC | ₹1.8 L | H2 | Accepted-AOC AOC |
| 2 | H1₹2.0 LRejected-Finance | ₹2.0 L | H1 | Rejected-Finance Highest |
| Sl No | Description | Qty | Unit | Kavinder Singh Govt. Contractor H1 | HUKAM CHAND H2 |
|---|---|---|---|---|---|
| 1.10Description | |||||
| 2.00 | Excavation in foundations, trenches etc. in earth work, lift up to 1.50 mtrs. stacking the excavated soil not more than 3 mtrs. clear from the edge of excavation and then returning the excavated soil in 15 cm. layers when required into plinths sides of foundations etc., consolidating each deposited layer by ramming and watering and then disposing of all surplus excavated earth as directed with in a lead of 20 mtrs & 50% Pick work & Jumper work 50 % | 5.04 | Cum | 380 ₹1,915.2 Lowest | 400 ₹2,016 |
| 3.00 | Demolishing cement concrete work manually/ by mechanical means including disposal of material within 50 metres lead as per direction of Engineer-in-charge. Nominal concrete 1:3:6 or richer mix (i/c equivalent mix) | 3.15 | Cum | 960 ₹3,024 Lowest | 1,100 ₹3,465 |
| 4.00 | Providing and laying cement concrete 1:3:6( 1cement:3 sand: 6 graded stone aggregate 20 mm nominal size) and curing complete excluding the cost of form work in foundation and plinth with in all leads and lifts as per the direction of Engineer-in-Charge. | 1.35 | Cum | 7,800 ₹10,530 | 5,500 ₹7,425 Lowest |
| 5.00 | Providing and laying cement concrete 1:5:10 (1Cement:5Sand:10 graded stone aggregate, 40 mm nominal size) with 15% plum and curing complete excluding cost of form in retaining wall / breast wall ,the size of plums shall be 150mm to 300 mm as per HP.PWD specifications. | 14.4 | Cum | 5,500 ₹79,200 | 4,700 ₹67,680 Lowest |
| 6.00Providing form work with steel plates 3.15 mm thick welded with angle iron in frames 30x30x5 mm so as to give a fair finish i/c centring ,shuttering, strutting and propping etc. with wooden battens & ballies, ht. of propping & centring below supporting floor to ceiling not exceeding 4 mtrs. & removal of the same for insitu-reinforced concrete work in : | |||||
| 6.10 | Vertical surfaces such as walls ( any thickness ) partitions and the like including attached pilasters , buttresses, plinth and string courses and the like . | 20.4 | Sqm | 340 ₹6,936 | 300 ₹6,120 Lowest |
| 7.00 | Providing and laying cement concrete 1:1.5:3 ( 1 cement : 1.5 sand : 3 graded stone aggregate 20mm nominal size) and curing complete excluding cost of form work in foundtion and plinth. | 2.7 | Cum | 8,500 ₹22,950 Lowest | 9,500 ₹25,650 |
| 7.10 | Providing tor steel reinforcement for RCC work including bending,binding and placing in position compete upto floor two levels. | 121.5 | Kg | 82 ₹9,963 Lowest | 90 ₹10,935 |
| 8.00 | Steel Work in single section including cutting, hoisting,fixing in position and applying a priming coat of lead paint | 0.88 | Otl | 9,200 ₹8,096 Lowest | 9,500 ₹8,360 |
Tender Value
₹2.9 L
EMD Value
₹6,000
Closing Date
10 Nov 2025, 11:00 amClosed
EE JAl Shakti Shimla Rural Division at Sunni
EE JAl Shakti Shimla Rural Division at Sunni
C.O Foundation Block ,P/ Wall P/F of Panel Board,Cable
2025_HPIPH_119075_1
SNN-SML-003-740-Tdr-25-33-43 dt 24.10.25
Open Tender
Civil Works - Water Works
Item Rate
90 days
EE Sunni
Please refer Tender documents.
7 documents required · 7 mandatory
₹500
EESuni
₹6,000
13 Jul 2026
29 Oct 2025
10 Nov 2025
29 Oct 2025
10 Nov 2025
29 Oct 2025
29 Oct 2025 - 10 Nov 2025
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.16 MB
FORM6.pdf
Tender Documents • 0.16 MB
FORM-8.pdf
Tender Documents • 0.67 MB
terms.pdf
Tender Documents • 0.10 MB
BOQ_174305.xls
BOQ • 0.34 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].