Loading…
India Infra Updates on WhatsApp
Join the Tenderkart WhatsApp channel for India Tender Updates
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹77.9 LAccepted-AOC | L1 | Accepted-AOC L1 | |
| 2 | L2₹83.4 L+₹5.4 L (6.99%)Rejected-AOC | L2 | Rejected-AOC L2 |
Tender Value
₹83.3 L
EMD Value
₹84,000
Closing Date
19 Jul 2023, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
The Addl Collector / Project Director, DRDA, Dhar
DRDA, Dharmapuri
Dharmapuri District - Strengtherning of road 1 Nos. in Package No. TN04-83 MGSMT/2022-23 Harur P83
2023_RDTN_342567_1
Roc.No.1231/2023/R2 Dt.15.06.2023 MGSMT P83
Open Tender
Civil Works
Item Rate
180 days
DRDA
Can be seen in the tender documents
2 documents required · 2 mandatory
₹0
₹84,000
2 Aug 2023
13 Jul 2023
19 Jul 2023
13 Jul 2023
19 Jul 2023
13 Jul 2023
Amount
Strengtherning of road from Kelaparai to Erukkampatti Road Km.0/0-1/900
Clearing the scrub jungles including cutting the scrubs and removing away from site etc complete
Picking up existing BT surface upto 5 to 10 cm of old metalled surface, cambering, sectioning of carriage way etc., complete
collection and supply of carted earth from approved quarry an average lead 1km including cost and conveyance of all materials to site anf labour charges etc.
Collection and supply of Girrty gravel for side berms and labour charges for filling etc complete
Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc..
Providing and laying of prime coat using Emulsion at the rate of 7 Kg per ten square meter over the WMM surface preparatory to another bituminous construction over it.
Providing and laying TACK COAT over the WMM surface (treated with primer) using 2.5Kg of Bituminous Emulsion RS I for 10 sqm. Including cost of bituminous emulsion which will be supplied by the department at section stores and its cost will be recovered as per special condition appended including labour charges for preparing the surface for laying tack coat and for applying required quantity of bituminous emulsion by mechanical sprayer including hire and fuel charges for all tools and plants employed etc., complete as per clause 503 of MOST specification.
Providing and laying Bituminious concrete to 40mm thick using 0.13cum of 19.00-9.50mm. 0.17cum of 9.5-2.36 and below with 50.3kgs of VG30/VG40 heating the bitumen and aggregates to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, carrying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonnes vibratory/phenumatic roller to the required density etc., including labour for attending to paver to site etc.including hire charges and fuel charges foe 20-30t CMP with bitumen boiler, tipper finisher/9m trucks,paver paver finisher,vibratory/phenumatic roller and all other tools and plants required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clauses 507 of MORTH .
Road marking with hot applied thermoplastic compound with Reflectorising glass beads on bituminous surface etc.,
Providing Rumble Strips
Culvert 1.5m Span @ Ch.430m
Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material.
Cement concrete in CC 1:4:8 mix using 40mm ISS HBG metal for foundation including watering whenever necessary and laid in layers not more than 15cm thick compacting ect... completed with standard specification and directed by the departmental officers.
Cement concrete 1:3:6 using 40mm H.B.G.Metal. including watering wherever necessary sand laid in layers compacting etc. complete complying with standard specification and directed by the departmental officers.
Centering below Ground
Do Deck Slab
Fabrication and places in positing mild steel on rubbed for steel and all ream forced cement concrete work as per type designed given including cost of steel binding wire in all floors etc., complete with standard specification,
Cement conerete 1:2:4 using 20mm H.B.G.Metal including watering wherever necessary sand laid in layers compacting etc. complete complying with standard specification and directed by the departmental officers.
Reinforcement Concrete 1: 1 1/5: 3 Mix using 20mm ISS HG metal including cost and conveyance of all materials and Labours charges ect, completed.
Collection and supply of gritty gravel from appd quarry including cost and conveyance of all materials to site including all labour charges for filling etc.complete,
Providing 100 m dia AC Pipe for Wheepholer
Provision for Expansion Joints (Bituman Pad)
Supply and Fixing of HM Stone
Supply and Fixing of KM Stone
Supply and Fixing of Guard Stone
Provision for Sign Board
Reflector
Provision for Name Board
Routine Maintenance** after completion of construction works (Lump-sum Amount for each year Per Km.)
For 1st year maintenance
For 2nd year maintenance
For 3rd year maintenance
For 4th year maintenance
For 5th year maintenance
GST Amount for providing Service to Government Contract Works for the above Construction & Maintenance Works. { GST Amount is the Total GST Amount for overall quoted amount (Both Construction and Maintenance) above this row in column "BB" for all works in this package} (Refer Clause 13.2 & 13.3 of Section 2 of Instruction to Bidders (ITB) of SBD)
K.Sakthivel
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .