| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹1.1 CrAdmitted-Finance | +2.78% | ₹1.1 Cr | L1 | Admitted-Finance |
| 2 | Not Admitted-Fee/PreQual/Technical | - | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
Tender Value
₹1.0 Cr
EMD Value
₹2.1 L
Closing Date
6 May 2026, 6:00 pmClosed
GM RSRDC LTD JAIPUR
GM RSRDC LTD SETU BHAWAN, JHALANA DOONGARI, JAIPUR
Remaining work at Risk and Cost of Construction of RCC Box Culvert (SKEW) at Ch. 80/020 and Ch. 80/550 on Dudu Malpura Todaraisingh Chhan Road (SH 37A)
2026_RSRDC_555043_1
RSRDCC NIT 050/2026-27 Dated 29.04.2026
Open Tender
Civil Works - Roads
150 days
Dudu Malpura Todaraisingh Chhan Road (SH 37A)
PLEASE REFER TENDER DOCUMENTS
2 documents required · 2 mandatory
₹2,360
PD RSRDC UNIT TONK THROUGH NEFT/RTGS/IMPS
₹2.1 L
11 May 2026
30 Apr 2026
7 May 2026
30 Apr 2026
6 May 2026
1 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earthwork in excavation for structures as per drawing and MoRTH specifications Clause 304.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material. Ordinary soil Upto 3 m depth | 34.62 | Cum | 178 | ₹6,162.36 |
| 2 | Dismantling of Cement Concrete Pavements as per MoRTH Specification Clause 202. Dismantling of cement concrete pavements by mechanical means using pneumatic tools breaking to pieces not exceeding 0.02 cum in volume and stock piling at designated locations and disposal of dismantled materials upto a lead of 1000 m, stacking serviceable and unserviceable materials separately | 273.36 | Cum | 632 | ₹1,72,760.99 |
| 3 | Earthwork in excavation for structures as per drawing and MoRTH specifications Clause 304.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto
a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material.Ordinary soil From 3 m to 6 m depth | 691.94 | Cum. | 212 | ₹1,46,690.43 |
| 4 | Back filling behind abutment, wing wall and return wall in 150mm layers, with mechanical compaction, complete with all lead and lift as per drawing and technical specification as per MoRTH Specification : Clause : 304 Sandy material | 41.18 | Cum | 350 | ₹14,414.4 |
| 5 | Reinforced cement concrete wearing coat M30 grade at any level including formwork and reinforcement complete as per drawing and technical specification as per MoRTH Specification 2202, 1500 &1700 | 9.5 | Cum | 6,920 | ₹65,740 |
| 6 | Plain Cement Concrete M10 (1:3:6 nominal mix) in levelling course below open foundation of Head walls as per drawings & MoRTH Specification Clause 2908. P.C.C grade M 10 Nominal mix 1:3:6 | 55.41 | Cum | 3,091 | ₹1,71,259.95 |
| 7 | Providing and laying reinforced cement concrete in superstructure as per drawing and MoRTH specifications Clauses 1700, 2302 and 2304 R.C.C. Grade M 30 | 328.63 | Cum | 5,185 | ₹17,03,925.81 |
| 8 | Supplying, fitting, and placing TMT bar reinforcement in Super structure complete as per drawing and MoRTH specifications Clauses 1009,1600 and 2302 | 46.91 | MT | 94,500 | ₹44,33,278.5 |
| 9 | Construction of granular sub-base by providing well graded material, spreading in uniform layers with Tractor Mount Grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller to achieve the desired density, complete as per MoRTH Specification Clause 401. For Grading I Material | 186 | Cum | 512 | ₹95,232 |
| 10 | Construction of dry lean cement concrete Sub- base over a prepared sub-grade with coarse and fine aggregate conforming to IS: 383, the size of coarse aggregate not exceeding 25 mm, aggregate cement ratio not to exceed 15:1, aggregate gradation after blending to be as per table 600-1, cement content not to be less than 150 kg/ cum, optimum moisture content to be determined during trial length construction, concrete strength not to be less than 10 Mpa at 7 days, mixed in a batching plant, transported to site, laid with a paver with electronic sensor, compacting with 8-10 tonnes vibratory roller, finishing and curing. | 124 | Cum | 2,715 | ₹3,36,660 |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 1.02 MB
agreement.pdf
Tender Documents • 0.45 MB
AnnexureABCD_RTPPAct2012_AnnexureC.pdf
Tender Documents • 0.10 MB
bankdetails.pdf
Tender Documents • 0.52 MB