Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹5.8 LAccepted-AOC | L1 | Accepted-AOC Lowest Amount Quoted | |
| 2 | L2₹5.8 L+₹5,694 (0.98%)Rejected-AOC | L2 | Rejected-AOC Highest Amount Quoted |
| Sl No | Description | Qty | Unit | MR Enterprise L1 | Sri Nalli Builders L2 |
|---|---|---|---|---|---|
| 1.00 | Supply and delivery and fixing of HDPE tank as per IS 12701 / 1996 including loading, unload ing, transportation and labour charges for fixing of the GI pipes and specials for pipe connection works including cutting, threading and fixing
charges etc., | 3 | No | 18,771 ₹56,313 Lowest | 18,771 ₹56,313 Lowest |
| 2.00 | Earth work excavation and depositing on bank with initial lead of 10 meters and initial lift of 2 meters in hard stiff block cotton hard red earth murrains, gravel, stony earth mixed with small size boulders and hard gravel soil etc., complete as per standard specification (ss 20B) | 81 | M3 | 246 ₹19,926 Lowest | 246 ₹19,926 Lowest |
| 3.00 | Cement Concrete 1:4:8 mix (One Cement and Four Sand and Eight aggregate) including cost and using 40mm metal including Cost and Conveyance of all materials to site and all labour charges etc., complete complying with standard specification. | 2 | M3 | 5,101 ₹10,202 Lowest | 5,101 ₹10,202 Lowest |
| 4.00 | Brick work in CM 1:5 (one cement & Five Crushed Stone Sand (M- Sand)) using II class ground moulded bricks of size 9" X 43/8"X 2 3/4" including finishing, curing, etc., complete complying with standard specification - 100CFT | 9 | M3 | 7,288 ₹65,592 Lowest | 7,288 ₹65,592 Lowest |
| 5.00 | Plastering with cement mortar 1:5 (One part of Cement and Five part of Plastering Sand (P- Sand)) 12mm, thick in all floors including cost and conveyance of all materilas to site and labour charges etc,complete as per standard specifications | 44 | M2 | 268 ₹11,792 Lowest | 268 ₹11,792 Lowest |
| 6.00 | Painting two coats for Exterior surface with approved Exterior Plastic Emulsion paint approved quality and colour over a priming coat, including thorough scrapping, clean removal of dirt, etc complete and including necessary plaster of paris, putty, wherever required etc, complete as per standard specification. | 44 | M2 | 249 ₹10,956 Lowest | 300 ₹13,200 |
| 7.00 | Supply and delivery 2 HP Submercible motor 20 lpm x 125m head with Single Phase As Per IS 8034/2002 With out Panel Board all Accessories including all charge etc complete.(page No.103) twad | 3 | No | 37,053 ₹1,11,159 Lowest | 37,053 ₹1,11,159 Lowest |
| 8.00 | Supply and delivery 2 HP Single Phase Panel Board with Two level Guard and Auto start and all Accessories including all charge etc complete.(pageNo:119) Twad | 3 | No | 8,099 ₹24,297 Lowest | 8,099 ₹24,297 Lowest |
| 9.00 | Supply and delivery Pvc insulated and sheathed 3 core flat type 4 sq.mm copper cable conforming to IS 694/1990(pageNo.124) Twad | 330 | Rm | 206 ₹67,980 Lowest | 206 ₹67,980 Lowest |
| 10.00 | upply and Delivery of 40 mm UPVC Column Pipe including cost and conveyance with loading andunloading charges etc.,complete.,(page No.07) Twad | 300 | Rm | 192 ₹57,600 Lowest | 192 ₹57,600 Lowest |
Tender Value
₹7 L
EMD Value
₹14,000
Closing Date
12 Aug 2025, 3:00 pmClosed
Executive Officer
Kodumudi Town Panchayat
Erection of Submersible Motor in existing borewell and Providing HDPE Tank
2025_DTP_590123_1
362/2025-1
Open Tender
Civil Works
Works
Kodumudi Town Panchayat
Asper Norms
2 documents required · 2 mandatory
₹0
₹14,000
22 Oct 2025
7 Aug 2025
12 Aug 2025
7 Aug 2025
12 Aug 2025
7 Aug 2025
7 Aug 2025 - 12 Aug 2025
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .