Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹9.6 LAccepted-AOC | ₹9.6 L | L1 | Accepted-AOC accepted |
| 2 | L2₹9.6 L+₹3,111.98 (0.32%)Rejected-AOC | ₹9.6 L+₹3,111.98 (0.32%) | L2 | Rejected-AOC rejected |
| Sl No | Description | Qty | Unit | mitesh construction L2 | ab builders L1 |
|---|---|---|---|---|---|
| 1.00 | Earth work excavation for foundation in all type of soils as may be directed except in hard rock requiring blasting and also including refilling the sides of foundations with excavated soil in layers of 15cm thick well rammed and consolidated and depositing the surplus earth within the compound in places shown by the departmental officers with initial lead of 10m and lift of 2mts. for ordinary soil, cost including all costs etc., complete as per standard specification. | 1,176.99 | M3 | 186 ₹2,18,921.07 | 184.8 ₹2,17,508.68 Lowest |
| 2.00Supply and Delivery of PVC, Pipes and Specials including cost and conveyance of all materials and all Labour charges etc complete complying with Standard specifications. | |||||
| 2.01 | 180mm | 50 | RM | 563 ₹28,150 | 561.5 ₹28,075 Lowest |
| 2.02 | 140mm | 50 | RM | 345 ₹17,250 | 343 ₹17,150 Lowest |
| 2.03 | 110mm | 50 | RM | 198 ₹9,900 | 196.7 ₹9,835 Lowest |
| 2.04 | 90mm | 50 | RM | 144 ₹7,200 | 142.2 ₹7,110 Lowest |
| 2.05 | 180mm PVC Couplers | 30 | No | 288 ₹8,640 | 286.9 ₹8,607 Lowest |
| 2.06 | 180mm PVC Tee | 30 | No | 413 ₹12,390 | 411.7 ₹12,351 Lowest |
| 2.07 | 180mm PVC Elbow | 30 | No | 558 ₹16,740 | 556 ₹16,680 Lowest |
| 2.08 | 140mm PVC Couplers | 30 | No | 88 ₹2,640 | 86.9 ₹2,607 Lowest |
Tender Value
₹10 L
EMD Value
₹10,000
Closing Date
20 Feb 2026, 3:00 pmClosed
COMMISSIONER KUMBAKONAM CITY MUNICIPAL CORPORATION
COMMISSIONER KUMBAKONAM CITY MUNICIPAL CORPORATION
Repairs and Maintenance of Watr supply distribution pipe line leak works in Zone 2
2026_MAWS_661595_1
1631/2026/E2
Open Tender
Civil Works
Item Rate
90 days
Kumbakonam
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹10,000
Yes
17 Apr 2026
19 Feb 2026
20 Feb 2026
19 Feb 2026
20 Feb 2026
19 Feb 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work excavation for foundation in all type of soils as may be directed except in hard rock requiring blasting and also including refilling the sides of foundations with excavated soil in layers of 15cm thick well rammed and consolidated and depositing the surplus earth within the compound in places shown by the departmental officers with initial lead of 10m and lift of 2mts. for ordinary soil, cost including all costs etc., complete as per standard specification. | 1,177 | M3 | - | - |
| 2Supply and Delivery of PVC, Pipes and Specials including cost and conveyance of all materials and all Labour charges etc complete complying with Standard specifications. | |||||
| 2.01 | 180mm | 50 | RM | - | - |
| 2.02 | 140mm | 50 | RM | - | - |
| 2.03 | 110mm | 50 | RM | - | - |
| 2.04 | 90mm | 50 | RM | - | - |
| 2.05 | 180mm PVC Couplers | 30 | No | - | - |
| 2.06 | 180mm PVC Tee | 30 | No | - | - |
| 2.07 | 180mm PVC Elbow | 30 | No | - | - |
| 2.08 | 140mm PVC Couplers | 30 | No | - | - |
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_794113.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.67 MB
BOQ_794113.xls
BOQ • 0.24 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .