Loading…
India Infra Updates on WhatsApp
Join the Tenderkart WhatsApp channel for India Tender Updates
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 2 | Admitted-Fee/PreQual/Technical/Finance 1A 20 EAST SEERANAGAPALAYAM ROAD SALEM 63607 | 63607 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹9.3 L
EMD Value
₹9,250
Closing Date
7 Jul 2023, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
THE COMMISSIONER
Salem City Muncipal Corporation, Fort Main Road,
Attending Repairs supply and fixingof wornout Bearing and Shaft sleeves. Shaft nuts, reconditioning of bearing housing renewal of packing ropes and packing sheets for 550 HP Units IV and 500 HP Unit III at Karumalai Koodal Booster Station and Atte
2023_MAWS_334101_1
E6/Est No 11/WS/2023-2024
Open Tender
Civil Works
Lump-sum
30 days
SALEM CITY MUNICIPAL CORPORATION
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹9,250
Yes
7 Jul 2023
1 Jul 2023
7 Jul 2023
1 Jul 2023
7 Jul 2023
1 Jul 2023
Amount
Removing the top cover of the Pumpset, tyre coupling and lilfting the rotating element assembly from the Pump Body
Removing a wornout Pump bearing from the pumpshaft at the Driving end side by welding machine and filling metal by welding in the wornout portion and again machining in the lathe at the bearing seating position to suit the new ball bearing cost including material labour and transportation etc.
Removing the wornout double ball thrust bearings from the pumpshaft at the non-driving end side by welding machine and then filling the metal by welding machine at the wornout bearings seating area and again machining in lathe at the bearing seating area to correct size to suit the new ball thrust bearings. Cost including material labour and conveyance etc.
Removing the wear and teared shaft sleeve at the Driving and non driving and bothside without damaging the impeller carefully
Supply and fixing one no shaft sleeve in driving and side and one no. in non-driving end side made of phosphone bronze material in the shaft both side cost including material, labour and conveyance etc.
Supply and fixing oneNo. ball bearing 6314 C3 at the Driving end side properly in correct seating place applying castrol grease to the bearings cost including Bearing cost labour and conveyance etc.
Supply and front of 2 Nos. 7314C3 Ball thrust bearings at the shaft in non-driving end side properly in correct seating place and applying required grease castrol make all cost including Bearing Cost grease cost labour and conveyance etc.
Providing sleeves to the two bearings housings as the housing body worn out cost including material labour and conveyance etc.
Reassembling the complete rotating assembly in the pumpset body proving suitable bolts and nuts of the top cover proving new aspestas grapite pading rope 5 layers on each sides total 10 layers and then coupled the pumpset with motor by tyre coupling
Providing cooling pipe arrangements to the gland packing area on bothsides of the pumpset cost including labour material etc.
After complete assembling the pumpset put into trail run and then successful commissioning of the pumpset
Dismantling the incoming and outgoing 125 sq.mm. Alu. 3 Core cable from the VFD Panel – Removing the VFD Unit from the VFD panel and bring out theunit to the company and testing the VFD including transportation & labour etc.
Removing the old damaged and burnount all panel control wiring and providing new wiring with FRLS cables.
Removing of old VFD panel het exahust fans and air inlets and new exhaust fans and air inlets are replaced
Removing of old damaged air filters and renewed with new air filters along with new filter cloth.
Repairing and overhauling main inverter control board and power supply boards.
Removal of old burnt MCB and indication lamp and replaced with new MCBS and indication lamps
Software configuratiion in VFD Drive as per site condition.
Testing and Commissioning of the VFD.
Bring out the VFD from service centre to the Intake tower pumping station and erection and commissioning cost including transport and labour etc.
VRV CONSTRUCTION
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .