| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.3 LAdmitted-Finance | L1 | Admitted-Finance |
| Sl No | Description | Qty | Unit | RAMALAKSHMANAN TNEB CONTRACT L1 |
|---|---|---|---|---|
| 1.00 | Loading, Transporting and unloading of poles and associated materials from substore/vellore to west vellore section work spot upto 8 kms | 22 | Per Pole | 825 ₹18,150 Lowest |
| 2.00 | Excavation and erection of 8.0m pole | 21 | Per Pole | 1,050 ₹22,050 Lowest |
| 3.00 | Excavation and erection of 9.0m pole | 1 | Per Pole | 1,250 ₹1,250 Lowest |
| 4.00 | Excavation, erection of stay set complete for HT/LT pole | 15 | each | 1,000 ₹15,000 Lowest |
| 5.00 | Stringing of 7/2.50 AAAC size of conductor (circuit length as mentioned in sanction copy) | 1.86 | Per Km | 2,300 ₹4,289.5 Lowest |
| 6.00 | Loading Transporting unloading of line materials from section to work spot upto 5 KM | 1.5 | each | 1,650 ₹2,475 Lowest |
| 7.00 | Fixing of LT Three phase X arm | 17 | each | 120 ₹2,040 Lowest |
| 8.00 | Fixing of HT / LT TI Fitting | 28 | each | 60 ₹1,680 Lowest |
| 9.00 | Dismantling of RCC REC PSC pole including closing of the pit | 2 | per km | 400 ₹800 Lowest |
| 10.00 | Fixing of Guarding 11 KV V X arm Tapping X Aram | 7 | Each | 210 ₹1,470 Lowest |
Tender Value
Refer Docs
Closing Date
24 Aug 2026, 2:00 pmClosed
EE Vellore
Gandhi Nagar Katpadi
Works Contract for Extension of supply works in HTLT feeders for erection poles ,transporting of poles, paving HTLT Line in various work orders in respect of Assistant Engineer O M Shenbakkam section in AEE O mWest Vellore Sub Division of Vellor
2026_EB_692934_2
EEVLR024
Limited
Electrical and Maintenance Works
Works
180 days
west vellore
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
Exempted
2 Sept 2026
10 Aug 2026
25 Aug 2026
10 Aug 2026
24 Aug 2026
10 Aug 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Loading, Transporting and unloading of poles and associated materials from substore/vellore to west vellore section work spot upto 8 kms | 22 | Per Pole | - | - |
| 2 | Excavation and erection of 8.0m pole | 21 | Per Pole | - | - |
| 3 | Excavation and erection of 9.0m pole | 1 | Per Pole | - | - |
| 4 | Excavation, erection of stay set complete for HT/LT pole | 15 | each | - | - |
| 5 | Stringing of 7/2.50 AAAC size of conductor (circuit length as mentioned in sanction copy) | 1.87 | Per Km | - | - |
| 6 | Loading Transporting unloading of line materials from section to work spot upto 5 KM | 1.5 | each | - | - |
| 7 | Fixing of LT Three phase X arm | 17 | each | - | - |
| 8 | Fixing of HT / LT TI Fitting | 28 | each | - | - |
| 9 | Dismantling of RCC REC PSC pole including closing of the pit | 2 | per km | - | - |
| 10 | Fixing of Guarding 11 KV V X arm Tapping X Aram | 7 | Each | - | - |
stage.html
html • 0.02 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.57 MB
BOQ_833195.xls
BOQ • 0.24 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .