Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.1 CrAccepted-Finance | L1 | Accepted-Finance L1 | |
| 2 | L2₹1.1 CrSame as L1Rejected-Finance FLOOR NO 1 FLAT NO 1 PLOT NO 740 SCHEME II K BLOCK KIDWAI NAGAR KANPUR NAGAR 208011 | KANPUR NAGAR | KANPUR NAGAR | UTTAR PRADESH | 208011 | L2 | Rejected-Finance L2 | |
| 3 | L2₹1.1 CrSame as L1Rejected-Finance | L2 | Rejected-Finance L2 | |
| 4 | L2₹1.1 CrSame as L1Rejected-Finance BANDA | UTTAR PRADESH | 210001 | L2 | Rejected-Finance L2 | |
| 5 | L2₹1.1 CrSame as L1Rejected-Finance | L2 | Rejected-Finance L2 |
Tender Value
₹1.3 Cr
EMD Value
₹8.7 L
Closing Date
20 Nov 2026, 12:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
SE Banda Circle PWD Banda
SE Banda Circle PWD Banda
Construction of Retaining Wall on Tindwari jaurahi Road from Km 9 (Jari) on Kamnaudi Link Road
2026_CEBAN_1206742_3
4505/35C-Banda Circle/2026-27 Dt 31-10-2026
Open Tender
Civil Works
Percentage
150 days
Banda
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,720
₹8.7 L
SE Banda Circle PWD Banda
25 Nov 2026
13 Nov 2026
20 Nov 2026
13 Nov 2026
20 Nov 2026
13 Nov 2026
18 Nov 2026
90 days
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with smooth wheel roller 80-100 kN in stages to proper grade and camber, applying and brooming, stone screening to fill-up the interstices of coarse aggregate, watering and compacting to the required density Grading III as per Technical Specification Clause 405. | 4.95 | cum | 2,891 | ₹14,310.45 |
| - | Providing and applying tack coat with V.G.-10 bitumen using bitumen pressure dristributor @ .30 kg. per sqm. on the prepared bituminous surface cleaned with Hydraulic broom as per Technical Specification Clause 503. | 660 | sqm | 29.8 | ₹19,668 |
| - | Providing laying & rolling of open graded premix carpet of 20 mm thickness composed of 13.2 mm to 5.6 mm aggregates either using penetration grade bitumen or emulsion to required line ,grade and level to serve as wearing course on a previously prepared base including mixing in a suitable plant ,laying and rolling with a three wheel 80-100 KN static roller capacity finished to required level and grades to be followed by seal coat . Claues 508 | - | sqm | 229 | - |
| - | Providing and laying seal coat Type-C sealing the voids in a bituminous surface laid to the specified levels, grade and cross fall using As per Technical Specification Clause 510 | - | sqm | 90 | - |
| - | Construction of subgrade and earthen shoulders with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of table 300.2 | 115.5 | cum | 100 | ₹11,550 |
| - | Excavation in foundation in B.C soil including lift up to 15 meter and lead upto 30 m (100 ft) and including filling, watering & ramming of excavated earth into the trenches or into the space between the building and the sides of foundation trenches or into the plinth and removal and disposal of surplus earth as directed by the Engineer-in-charge upto a distance of 30 M from the foundation trenches.(S.I.No. 251) | 1,980 | cum | 120 | ₹2,37,600 |
| - | Sand filling in plinth including supply of necessary quantity of sand from the site of work & including watering, dressing etc. Rate to include cost of all materials, labour and tools & plants etc. required for proper completion of the work. (S.I.No. 255) | 198 | cum | 1,000 | ₹1,98,000 |
| - | Cement concrete with 4cm (1/2'') gauge approved stone ballast, approved coarse sand. cement in the proportion 1:4:8 including supply of all materials,labour and tools and plants etc. required for proper completion of the work. | 198 | cum | 4,300 | ₹8,51,400 |
| - | Random course Rubble massonary in 1:4 cement and fine sand mortar in foundation and plinth, including supply of all materials, labour & T&P etc. required for proper completion of the work. | 2,865.5 | cum | 3,800 | ₹1,08,88,900 |
| - | Raised pointing with cement and fine sand of 1.25 fineness modulus mortar on brick work in proportion of 1:2 including supply of all materials, labour and tools and plants etc. required for proper completion of the work | 1,100 | sqm | 140 | ₹1,54,000 |
stage.html
html • 0.06 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.41 MB
Tendernotice_2.pdf
PDF • 3.85 MB
BOQ_2288037.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .