| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹8.8 LAccepted-Finance | L1 | Accepted-Finance Accepted | |
| 2 | L2₹8.8 L+₹1,661.20 (0.19%)Rejected-Finance | L2 | Rejected-Finance Rejected | |
| 3 | L3₹8.8 L+₹2,049.52 (0.23%)Rejected-Finance | L3 | Rejected-Finance Rejected |
Tender Value
Refer Docs
EMD Value
₹17,700
Closing Date
31 Oct 2020, 6:00 pmClosed
Executive Engineer
Chitrakoot Dham Mandal Jal Sansthan Banda
Work related to shifting of pipeline from Mohanpurwa to Achhraud Tiraha ws Banda.
2020_DOLBU_525016_1
1123/E-tender/15 dt. 22.10.2020
Open Tender
Civil Works
Item Rate
30 days
Banda
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,000
Executive Engineer
₹17,700
28 Dec 2020
26 Oct 2020
2 Nov 2020
26 Oct 2020
31 Oct 2020
26 Oct 2020
Amount
Carting of 300mm DISPK-7 pipe & required materials from Central Store near about 20Km Bhuragarh to Site Store with loading & unloading etc. in all respects. As per direction of engineer in charge.
Excavation of earth trenches in following type of soil mixed with mooram/ shingle boulders/ kanker requiring use special tools & plants for pipeline work including lift upto 1.5 mtr. And lead upto 50mtr. Including refilling, watering, ram mining of excavated earth into the trenches and removal of surplus earth upto a distance of 50mtr from trenches including supply of Labour T&P etc. proper completion of the work.
70% Earth Work
30% Soft Rock
Laying, Jointing & Lowering of 300mm dia DISPK-7 pipe & fitting of specials from site store to site of work an average distance 300mtr. Lowering them into trenches laying to alignment and gradient laying and jointing of pipeline including cutting of pipe for making of length as required proper completion of work.
Construction of Sluice Valve Chamber as per site with R.C.C slab & M.S main hole cover including supply of all materials, labours and T&P etc. proper completion of work.
Cutting of forest grass which are developed due to water bailing out of pipe with diesel engine, operator, section pipe and mobil oil, cutter, labours and T&P etc. proper completion of work.
Interconnection of Rising Main & Distribution Pipeline from the existing pipeline as site condition with bend, tee, angular bend, specials including testing work with all labours and T&P etc. for proper completion of the work.
inspirecommunicationbanda
M/S PARIDHI CONTRACTOR AND SUPPLIERS
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .