Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹7.7 CrAccepted-Finance CHIRA GHORAWAL SONBHADRA | SONBHADRA | UTTAR PRADESH | 231205 | L1 | Accepted-Finance L1 | |
| 2 | L2₹7.7 Cr+₹2.0 L (0.27%)Rejected-Finance A 52 CHANAKYA PLACE NEW DELHI BRANCH OFFICE B 175 NANDGRAM GHAZIABAD PIN CODE 110045 | NEW DELHI | NEW DELHI | DELHI | 110045 | L2 | Rejected-Finance L2 | |
| 3 | L3₹7.7 Cr+₹5.3 L (0.69%)Rejected-Finance 142 | L3 | Rejected-Finance L3 | |
| 4 | L4₹7.8 Cr+₹7.7 L (1.01%)Rejected-Finance NAYA GAON CHANDPUR BULANDSHAHAR UP | GONDA | UTTAR PRADESH | 271001 | L4 | Rejected-Finance L4 | |
| 5 | Not Admitted-Fee/PreQual/Technical GIJROLI DY LIKELY RELATED TO THE WORK LOCATION MENTIONED SPECIFIC ADDRESS NOT PROVIDED FOR THE CONTRACTOR | DAMAN | THE DADRA AND NAGAR HAVELI AND DAMAN AND DIU | 396210 | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
| Sl No | Description | Qty | Unit | M/S SHIV SHAKTI CONSTRUCTION L3 | ASHOK KUMAR L1 | gopi constech pvt. ltd. L2 | M/S UNITE ENTERPRISES L4 |
|---|---|---|---|---|---|---|---|
| 1.00 | Earth work in excavation in foundation in all type of soil with all lead and lift, including back filling,watering and ramming of excavated earth into the trenches or into the space between the structure, the sides of foundation trenches with removal and disposal of surplus earth required for proper completion of work as directed by the engineer-in-charge | 9,157.34 | cum | 90.24 ₹8,26,358.36 | 89.62 ₹8,20,680.81 Lowest | 89.86 ₹8,22,878.57 | 90.53 ₹8,29,013.99 |
| 2.00 | Dewatering with all cost of power, P.O.L,machines, pump, well point system and operator etc. with assembling and deassembling of machines etc. required for proper completion of work | 1,29,600 | Hr/HP | 36.1 ₹46,78,560 | 35.85 ₹46,46,160 Lowest | 35.95 ₹46,59,120 | 36.21 ₹46,92,816 |
| 3.00 | Providing and Fixing Centering and shuttering of CC work including cost of all material, labour and T&P required for proper completion of work as directed by engineer-in-charge. | 2,291.17 | Sqm | 518.89 ₹11,88,865.2 | 515.34 ₹11,80,731.55 Lowest | 516.71 ₹11,83,870.45 | 520.53 ₹11,92,622.72 |
| 4.00 | Providing and laying Cement concrete A20 M15 (1:2:4) with mechanical mixing & vibration, curing etc. including all cost of material, labour, T&P etc. complete required for proper completion of work. | 304.08 | cum | 5,423.63 ₹16,49,217.41 | 5,386.52 ₹16,37,933 Lowest | 5,400.79 ₹16,42,272.22 | 5,440.75 ₹16,54,423.26 |
| 5.00 | Providing and laying Cement concrete/Reinforce Cement concrete A20 M20 (1:1.5:3) with mechanical mixing & vibration, curing etc. including all cost of material, labour, T&P etc. complete required for proper completion of work. | 7,067.58 | cum | 5,962.24 ₹4,21,38,608.18 | 5,921.44 ₹4,18,50,250.92 Lowest | 5,937.13 ₹4,19,61,141.25 | 5,981.07 ₹4,22,71,690.71 |
| 6.00 | Providing and laying Cement concrete/Reinforce Cement concrete A20 M25 (1:1:2) with mechanical mixing & vibration, curing etc. including all cost of material, labour, T&P etc. complete required for proper completion of work. | 321.28 | cum | 6,884.07 ₹22,11,714.01 | 6,836.97 ₹21,96,581.72 Lowest | 6,855.08 ₹22,02,400.1 | 6,905.81 ₹22,18,698.64 |
| 7.00 | Providing and laying stone boulder 20-40 kg size in Launching Apron including all cost of material, labour and T&P etc. for proper completion of work. | 475.44 | cum | 2,116.26 ₹10,06,154.65 | 2,101.78 ₹9,99,270.28 Lowest | 2,107.35 ₹10,01,918.48 | 2,122.94 ₹10,09,330.59 |
| 8.00 | Providing & Laying Sand filling Under CC Block including cost of material, labour, T&P etc. for proper completion of work. | 43.98 | cum | 1,111.27 ₹48,873.66 | 1,104.16 ₹48,560.96 Lowest | 1,107.08 ₹48,689.38 | 1,115.28 ₹49,050.01 |
| 9.00 | Providing & Laying filtter 20mm to 40 mm size stone grit filling Under CC Block including all cost of material, labour, T&P etc. for proper completion of work. | 43.98 | cum | 2,313.41 ₹1,01,743.77 | 2,297.58 ₹1,01,047.57 Lowest | 2,303.67 ₹1,01,315.41 | 2,320.72 ₹1,02,065.27 |
| 10.00 | Supplying and fixing Z-sheet pile driving into the canal including all cost of material, cutting, welding, primer, painting, labour and T&P etc for proper completion of work. | 103.03 | M.T. | 96,355.09 ₹99,27,464.92 | 95,695.82 ₹98,59,540.34 Lowest | 95,949.38 ₹98,85,664.62 | 96,659.37 ₹99,58,814.89 |
Tender Value
₹8.1 Cr
EMD Value
₹16.3 L
Closing Date
26 Sept 2026, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
SE 1st IWC Meerut
Office of SE 1st IWC Meerut
As per the NIT
2026_UPIDC_1188008_4
15/SE-1/2026-27
Open Tender
Civil Works
Piece-work
180 days
Meerut
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,354
₹16.3 L
Office of SE 1st IWC Meerut
19 Nov 2026
20 Sept 2026
26 Sept 2026
20 Sept 2026
26 Sept 2026
20 Sept 2026
22 Sept 2026
90 days
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation in foundation in all type of soil with all lead and lift, including back filling,watering and ramming of excavated earth into the trenches or into the space between the structure, the sides of foundation trenches with removal and disposal of surplus earth required for proper completion of work as directed by the engineer-in-charge | 9,157.34 | cum | - | - |
| 2 | Dewatering with all cost of power, P.O.L,machines, pump, well point system and operator etc. with assembling and deassembling of machines etc. required for proper completion of work | 1,29,600 | Hr/HP | - | - |
| 3 | Providing and Fixing Centering and shuttering of CC work including cost of all material, labour and T&P required for proper completion of work as directed by engineer-in-charge. | 2,291.17 | Sqm | - | - |
| 4 | Providing and laying Cement concrete A20 M15 (1:2:4) with mechanical mixing & vibration, curing etc. including all cost of material, labour, T&P etc. complete required for proper completion of work. | 304.08 | cum | - | - |
| 5 | Providing and laying Cement concrete/Reinforce Cement concrete A20 M20 (1:1.5:3) with mechanical mixing & vibration, curing etc. including all cost of material, labour, T&P etc. complete required for proper completion of work. | 7,067.58 | cum | - | - |
| 6 | Providing and laying Cement concrete/Reinforce Cement concrete A20 M25 (1:1:2) with mechanical mixing & vibration, curing etc. including all cost of material, labour, T&P etc. complete required for proper completion of work. | 321.28 | cum | - | - |
| 7 | Providing and laying stone boulder 20-40 kg size in Launching Apron including all cost of material, labour and T&P etc. for proper completion of work. | 475.44 | cum | - | - |
| 8 | Providing & Laying Sand filling Under CC Block including cost of material, labour, T&P etc. for proper completion of work. | 43.98 | cum | - | - |
| 9 | Providing & Laying filtter 20mm to 40 mm size stone grit filling Under CC Block including all cost of material, labour, T&P etc. for proper completion of work. | 43.98 | cum | - | - |
| 10 | Supplying and fixing Z-sheet pile driving into the canal including all cost of material, cutting, welding, primer, painting, labour and T&P etc for proper completion of work. | 103.03 | M.T. | - | - |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 5.92 MB
TDUpload.pdf
Tender Documents • 7.75 MB
BOQ_2237609.xls
BOQ • 0.26 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart shows the information on this page on a best-effort basis and does not guarantee that it is accurate, complete or current. Check it against the buyer's official notice and documents before you act on it; the official record prevails. TenderKart is not liable for any loss or claim arising from the use of this information. If you notice any error or omission, please let us know at .