Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹38.4 LAccepted-Finance | ₹38.4 L | L1 | Accepted-Finance L1 |
| 2 | L2₹40.8 LRejected-Finance MOHALLA GANDHI NAGAR AILUM DISTT SHAMLI | AILUM | SHAMLI | UTTAR PRADESH | ₹40.8 L | L2 | Rejected-Finance L2 |
| 3 | L3₹44.9 LRejected-Finance GRAM HUSAINABAD BHANWARA MUZAFFARNAGAR UTTAR PRADESH | MUZAFFARNAGAR | UTTAR PRADESH | ₹44.9 L | L3 | Rejected-Finance L3 |
| 4 | L4₹46.2 LRejected-Finance | ₹46.2 L | L4 | Rejected-Finance L4 |
Tender Value
₹51 L
EMD Value
₹4.5 L
Closing Date
4 May 2026, 2:00 pmClosed
se pwd saharanpur
se pwd saharanpur
New construction work at Nagdevta Temple to Pindora Jahagirpur Road in Distt. Shamli in. F.Y. 2025-26
2026_CEMRT_1143104_1
2228/25MS-S/2026 Date 28-03-2026
Open Tender
Civil Works
shamli
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,714
₹4.5 L
11 May 2026
28 Apr 2026
4 May 2026
28 Apr 2026
4 May 2026
28 Apr 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount | Item Code |
|---|---|---|---|---|---|---|
| 1 | Construction of granular sub-base by providing coarse graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with vibratory roller to achieve the desired density, complete as per clause 401 I/c all taxes, Labour cess, levy, toll fee, royalty, Contractor Profit but excluding GST. | 135 | cum | 3,000 | ₹4,05,000 | BI01010001010000000000000515BI0100001110 |
| 2 | Providing, laying and spreading Material on a prepared sub grade, addingh cement (OPC) @ 2% by weight to the spread Material manually mixing in place with rotavator and compacting with road roller at OCM to achieve the desired unconfined compressive strength and to form a layer of sub-base. I/c all taxes, Labour cess, levy, toll fee, royalty, Contractor Profit but excluding GST. | 303 | cum | 3,300 | ₹9,99,900 | BI01010001010000000000000515BI0100001111 |
| 3 | Providing, laying and spreading Material on a prepared sub base, addingh cement (OPC) @ 4% by weight to the spread Material manually mixing in place with rotavator and compacting with road roller at OCM to achieve the desired unconfined compressive strength and to form a layer of base. I/c all taxes, Labour cess, levy, toll fee, royalty, Contractor Profit but excluding GST. | 393 | cum | 3,500 | ₹13,75,500 | BI01010001010000000000000515BI0100001112 |
| 4 | Providing and applying tack coat with bitumen VG-10 using bitumen distributor at the rate of 0.20 kg per sqm on the prepared bituminous surface with hydralic broom as per technical specificaton clause 503. I/c all taxes, Labour cess, levy, toll fee, royalty, cost of bitumen, Contractor Profit but excluding GST. | 2,812 | Sqm. | 13 | ₹36,556 | BI01010001010000000000000515BI0100001113 |
| 5 | Providing, laying and rolling of open-graded Premix Carpet of 20 mm thickness composed of 13.2 mm to 5.6 mm aggregates either using penetration grade bitumen or emulsion to required line, grade and level to serve as wearing course on a previously prepared base, including mixing in a suitable plant, laying and rolling with a three wheel 80-100 kN static roller capacity, finished to required level and grades. as per technical specificaton clause 508. I/c all taxes, Labour cess, levy, toll fee, royalty, cost of bitumen, Contractor Profit but excluding GST. | 2,812 | Sqm. | 188 | ₹5,28,656 | BI01010001010000000000000515BI0100001114 |
| 6 | Providing and laying seal coat sealing the voids in a bituminous surface laid to the specified levels, grade and cross fall using Type C as per Technical Specification Clause 510A I/c all taxes, Labour cess, levy, toll fee, royalty, cost of bitumen, Contractor Profit but excluding GST. | 2,812 | Sqm. | 73 | ₹2,05,276 | BI01010001010000000000000515BI0100001115 |
| 7 | Construction of subgrade and earthen shoulders with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of Table 300.2 with lead upto 1000 m as per Technical Specification Clause 303.1 I/c all taxes, Labour cess, levy, toll fee, royalty, cost of bitumen, Contractor Profit but excluding GST. | 6,189 | Cum. | 105 | ₹6,49,845 | BI01010001010000000000000515BI0100001116 |
| 8 | Providing and laying of interlocking concrete Block pavement having thickness 80 mm as per drawings and technical specification Clause 1504. (Exclusive G.S.B.) SI No. New Item 14 Ch. 20 I/c all taxes, Labour cess, levy, toll fee, royalty, cost of bitumen, Contractor Profit but excluding GST. | 900 | Sqm. | 810 | ₹7,29,000 | BI01010001010000000000000515BI0100001117 |
| 9 | M-150 Brick on edge pavement on parties with bricks, laid dry joints filled with local sand including preparation of base to proper slope, and its ramming, spreading layer of 1 cm. (3/8") depth of local sand over the subgrade and including supply of all materials, labour Tools &plants etc. required for proper completion of the work. SI No. 763 I/c all taxes, Labour cess, levy, toll fee, royalty, Contractor Profit but excluding GST. | 120 | Sqm. | 450 | ₹54,000 | BI01010001010000000000000515BI0100001118 |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.61 MB
BOQ_2134968.xls
BOQ • 0.27 MB
Download all tender documents and submit your bid