Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹16.3 LAccepted-AOC | ₹16.3 L Quoted ₹16.8 L | L1 | Accepted-AOC AOC |
| 2 | L2₹17.2 L+₹48,465 (2.89%)Rejected-Finance 28 AVANTIBAI MARKET MAKRONIA SAUGOR MP 470004 | SAUGOR | SAGAR | MP | 470004 | ₹17.2 L+₹48,465 (2.89%) | L2 | Rejected-Finance 2nd Lowest bidder |
Tender Value
Refer Docs
EMD Value
₹40,000
Closing Date
5 May 2021, 6:00 pmClosed
GE Saugor
GE Saugor
COMPREHENSIVE MAINT AND REPAIR OF DIESEL GENERATING SET OF VARIOUS CAPACITY INSTALLED AT DIFFERENT LOCATIONS ALONGWITH CRANES, CONNECTED ITEMS OF WATER FILTRATION PLANT AND ALLIED WORKS UNDER GE SAUGOR
2021_MES_433697_1
GE/SGR/TOK-72 OF 2020-21
Open Tender
Miscellaneous Works
Item Rate
330 days
s
Please refer Tender documents.
8 documents required · 8 mandatory
₹500
GE Saugor
₹40,000
Yes
25 May 2021
31 Mar 2021
7 May 2021
31 Mar 2021
5 May 2021
23 Apr 2021
Amount
Periodical maintenance of DIESEL GENERATING SETS as per manufacturer recommendation of the following DG sets installed at various location and various capacity complete all as specified and directed by Engineer-in-charge:-
DG set 320 KVA Capacity
DG set 180 KVA Capacity
DG set 125 KVA Capacity
DG set 90 KVA Capacity
DG set 63/62.5/60 KVA Capacity
DG set 40/30/20KVA Capacity
DG set 12.5/7.5 KVA Capacity
Note:- (a) Checking the fanbelt , Fuel , Oil filter, Air Filter, FIP Performance,FIP Oillevel, Tappet Clearance, adjustment of fuel pump timing, tighting of base bolt nuts, battery distilled water level, vibration damper mounting, radiator, radiator hose, panel board cable connection tighting (b). Service engineer report from authorised dealer shall be submitted for every check about the performance and maintenance of DG Sets (c). Highly skilled labours and tools for maintenance/checks repairs/replacement is deemed to be included in the rate quoated by the contractor (d). Replacement of spares , Coolant,Distilled water , Engine Oil, Fuel/Oil/Air filtershallbe measured under relevant items (e). Mechanic , Supervisor and Maintenance Engineer must be skilled and must have knowledge of maintenance of DG Sets and attending minor and Major fault when it arise,.
Disconnecting, removing and dismantling radiator assembly from the following capacity DG sets and descaling the radiator throughly with CTC solution/any other chemical solvent agent as approved by the Engineer-in-Charge, stopping of leakeage at place to copper cores and tubes by brazing scapping the existing Oil paint, dusting and painting the radiator with enamelled paint etc re-installing and commissioning complete all as directed by Engineer-in-charge
7.5/12.5/20/30 KVA Capacity Genset
40/62.5/90 KVA Capacity Genset
125 KVA Capacity Genset
180/320 KVA Capacity Genset
Disconecting the existing battery of capacity 12V 92/100 AH from the DG Set, taking it to battery workshop, draining out the complete unserviceable sulphuric acid from the battery, filling up with new sulphuric acid to the required level, charging the battery, testing the battery for correct specific gravity, bringing back to the location, connecting to DG Set, start the engine for satisfactory function complete all as directed by Engineer-in-Charge.
All as per item No.3.00 herein before but 12,180AH
M&L for replacing the worn out carbon brushes slipring type in alternator of 7.5/20/30 KVA capacity DG set including all necessary connected works complete all as directed by Engineer-in-Charge.
M&L for cleaning complete genset and panel surface, Scraping down the old faded existing paint from the following capacity DG Set of making the surface smooth by filling up the uneven surfaces with putty and scraping with emery sheet, applying two coats of synthetic enamel paint over one coat of red oxide primer, painting the details of panel over the panel all as specified and directed by Engineer -in-Charge:-
7.5/12.5/30 KVA Capacity Genset
40/62.5/90 KVA Capacity Genset
125/180/320 KVA Capacity Genset
Draining out the existing diesel from the tank from the following capacity DG Set , kept as side for repouring, taking down the complete fuel tank of any capacity from its position after disconnecting all the fuel lines, carryout cleaning work with solutions, removing the dust and foreign materials from the tank, drying the tank, blow with air painting and carry out recaliberation of diesel tank to the specified level including replacement of PVC level pipe, refix the tank in its original position, connecting all the removed fuel connections, refilling the kept diesel back to the tank carefully, remove air from the fuel connections, start the engine and test for satisfactory function complete all as directed by Engineer-in-Charge:-
7.5/12.5/20/30 KVA Capacity Genset
40/62.5/90 KVA Capacity Genset
125/180KVA Capacity Genset
320 KVA Capacity Genset
M&L for removing defective AVR from alternator and replacing with new AVR upto 90 KVA DG sets as per exisitng make complete all as specified and directed
All as per item 8 here in before but Alternator capacity 125 to 180 KVA Capacity as per exisitng make,
All as per item 8 here in before but Alternator capacity 320 KVA Capacity as per exisitng make
Material and labour for disconnecting electrical and mechanical connections of the following capacity alternator, 415 volts 50 HZ removing from foundations/diesel engine coupling and Transporting private Work shop, dismantling the alternator in parts and carrying out servicing ,varnishing and applying the bactol on the excitor coils/winding with super varnish, heating the windings at appropriate tempeature to achieve required insulation resistance without damaging the other parts, replacement of driving and non driving end bearings, cleaning, greasing, reassembling/installing/connecting and testing with megger for insulation resistance etc all as directed by the Engineer-in-charge:-
7.5/20/30 KVA Capacity Genset
40/62.5/90 KVA Capacity Genset
125/180KVA Capacity Genset
320 KVA Capacity Genset
Material and labour for disconnecting electrical and mechanical connections of the following capacity Altrernatror , 415V, 50 HZ removing from foundation/diesel engine coupling and Transporting private Work shop, dismantling the alternator in parts and removing the burn out copper winding coil carefully, cleaning slots and replacing the insulation paper and winding F class copper conductor winding wire of exsisting size/shape , glass sleeves of connecting leads, binding/tightining loose coils with binding cloths , varnishing and applying the bactol on the excitor coil/winding with supper varnish, heating the windings at appropriate tempeature to achive required insulation resistance with out damaging the other parts, replacement of driving and non-driving end bearings, cleaning ,greasing, reassembling/installing/connecting and testing with megger for insualtion resistance etc as directed by the Engineer-in-charge:-
7.5/20/30 KVA Capacity Genset
40/62.5/90 KVA Capacity Genset
125/180/320KVA Capacity Genset
Servicing to DG Set Control Panels Cleaning with blower, Cleaning with CTC ,Replacement of damaged lugs , Replacement of deteriorated copper wiring ,check the power contactors , Rectifying of loose connections , removing contactors and cleaning the points, refixing it in its original position complete all as specified and directed by Engineer-in-charge:- Note: spares shall be measured under relevant items
In built auto cut off battery Charger 12V
In built auto cut off battery Charger 24V
M&L for replacing the old unserviceable battery lead with copper terminals approximately 2.5 mtr length including applying jelly over the battery pole and terminals complete all as directed by Engineer-in-Charge.
M&L for replacing the old unserviceable battery Terminals ( Positive& Nagative ) including brazing work and applying jelly over the battery pole and terminals complete all as directed by Engineer-in-Charge.
M&L for replacing the damaged/burn out battery terminal pole (positive/nageative) 12 V DC battery and recosting lead as per the site requirement complete all as specified and directed by the Enginner-in-charge
Supply and fix in replacement of the following spares during repairs :-
Oil filter capacity 1/2 litre with 'O' ring
Oil filter capacity 1 litre with 'O' ring
Diesel filter capacity 1/2 litre with'O' ring ( Pre & Micro)
Diesel filter capacity 1 litre with 'O' ring ( Pre & Micro)
Sump/Crank case packing suitable for 7.5/20/30 KVA Capacity Genset
Sump/Crank case packing suitable for 40/62.5/90 KVA Capacity Genset
Sump/Crank case packing suitable for 110/125/180KVA Capacity Genset
Sump/Crank case packing suitable for 320 KVA Capacity Genset
Air filter suitable for 7.5/12.5/20/30 KVA Capacity Genset
Air filter suitable for 40/62.5/90 KVA Capacity Genset
Air filter suitable for 125/180 KVA Capacity Genset
Air filter suitable for 320 KVA Capacity Genset
Rocker arm packing kit suitable for 7.5/20/30 KVA Capacity Genset
Rocker arm packing kit for 40/62.5/90 KVA Capacity Genset
Rocker arm packing kit 125/180 KVA Capacity Genset
Rocker arm packing kit 320 KVA Capacity Genset
Engine Oill 20W-40 Make : Castrol/BP
Oil filter suitable for Kirloskar cummins engines upto 320 KVA Capacity Genset as per the existing sample
Fuel filter suitable for kirloskar cummins engines upto 320 KVA Capacity Genset as per the existing sample
Radiator Coolant
Distilled Water with PVC Container
Electrolite with PVC Container
Bearing Grease
Petrolium Jelly
Cotton Waste
M&L for replacing the existing damaged/bulged radiator flexible rubber hose for the following capacity DG sets installed at various installation and replaced with new radiator flexible hose with circular hose clips complete all as specified and directed by the Engineer-in-charge:-
7.5/12.5/20/30 KVA Capacity Genset
40/62.5/90 KVA Capacity Genset
125/180 KVA Capacity Genset
320 KVA Capacity Genset
Taking down the existing worn out Fanbelt (V Belt) for the following capacity installed at various installation and replaced with new fan belt complete all as specified and directed by the Engineer-in-charge:-
7.5/12.5/20/30 KVA Capacity Genset
40/62.5/90 KVA Capacity Genset
125/180KVA Capacity Genset
320 KVA Capacity Genset
Taking down the existing unserviceable water pump assy for the following capacity DG Sets installed at various installation and replaced with new water pump assy complete all as specified and directed by the Engineer-in-charge:-
7.5/12.5/20/30 KVA Capacity Genset
40/62.5/90 KVA Capacity Genset
125/180 KVA Capacity Genset
320 KVA Capacity Genset
Taking down the existing defective panel board indication lamp (RYB) from the panel and replaced with LED indicator lamp with holder complete all as specified and directed by the Engineer-in-charge
Taking down the existing defective panel board Hours meter from the panel and replaced with Anlog Hours meter complete all as specified and directed by the Engineer-in-charge
Taking down the existing defective RPM meter along with cable and replaced with Hours meter complete all as specified and directed by the Engineer-in-charge
Taking down the existing defective radiator cap from the Radiator and replaced new radiator cap complete all as specified and directed by the Engineer-in-charge
Taking down the existing Volt meter from the panel board and replaced new Volt meteras per the existing sample including necessary wiring and wiring material all as specified and directed by the Engineer-in-charge Make: AE/MECO
Taking down the existing Ammeter from the panel board and replaced new Ampere meteras per the existing sample including necessary wiring and wiring material all as specified and directed by the Engineer-in-charge Make: AE/MECO
Taking down the existing Frequency from the panel board and replaced new Frequency meter as per the existing sample including necessary wiring and wiring material all as specified and directed by the Engineer-in-charge Make: AE/MECO
Taking down the existing unserviceable Oil pump assy for the following capacity DG Sets installed at various installation and replaced with new Oil pump assy complete all as specified and directed by the Engineer-in-charge:-
7.5/12.5/20/30 KVA Capacity Genset
40/62.5/90 KVA Capacity Genset
125/180KVA Capacity Genset
320 KVA Capacity Genset
Taking down the existing Unserviceable panel board ON/Off bush button and replaced with new push button complete all as specified and directed by the Enginner-in-charge
Taking down the existing defective Oil pressure gauge from the panel and replaced with new Oil pressure gauge along with metal flexible ipe complete as as specified and directe by the Engineer-in-charge, Make: AE/MECO
Taking down the existing defective Oil temperature gauge from the panel and replaced with Oil temperature gauge along with connected links complete all as specified and directed by the Engineer -in-charge, Make: AE/MECO
Taking down the existing defective injector and fuel injection pump (FIP)for the following capacity DG Set installed at various installation and replacement of work out spares like delivery valves, Nozzles, bearings, fly weight, packing kit, and copper washer kit and recalibration of FIP and refixing in same position and testing of full load checking of pressure complete all as specified and directed by the Engineer-in-charge:-
7.5/20/30 KVA Capacity Genset
40/62.5/90 KVA Capacity Genset
125/180KVA Capacity Genset
320 KVA Capacity Genset
Taking down the existing defective DC Ammeter and volt meter of DG set from the panel and replaced with new Combined DC Ammeter and Volt meter including necessary wiring and wiring material complete all as specified and directed by the Engineer-in-charge
Taking down the existing defectiveSelf starter from Genset 12 V Capacity installed at various installation and replacement of work out spares like Bendex drive, carbon brush , solinoid coil,Armature including rewinding stator, refixing in same position and testing complete all as specified and directed by the Engineer-in-charge
All as per item No. 34 here in before but 24V
Taking down the existing defective/damaged Oil flexible ( Metal mesh/rubber) hose and replaced with new Oil flexible hose for the following capacity Genset including replacement of connector etc., complete all as specified and directed by the Engineer-in-charge:-
7.5/20/30 KVA Capacity Genset
40/62.5/90 KVA Capacity Genset
110/125/180KVA Capacity Genset
320 KVA Capacity Genset
S&F Battery12 V 180 AH for DG set complete all as specified and directed by Engr-in-charge.
S&F Battery12 V 100/90 AH for DG set complete all as specified and directed by Engr-in-charge. Make s.No. 38 &39: AMCO/KIRLOSKAR/EXIDE XPRESS/AMARAJA
Taking down the existing defective water temperature gauge of DG set from the panel and replaced with water temperature gauge along with connected links complete all as specified and directed by the Engineer -in-charge
Taking down the top layer of the existing filter media for Rapid Sand filtration plant No. 1 & 2 at berthuma filtration plant and removal to a distance not exceeding 50 metre and dopositing where directed all as specified and directed.
Refilling the serviceable media (ie pebbles) of various sizes obtained from taking out vide item No.40 in the Rapid sand filtration plant after cleaning with acid and pure water etc complete all as specified and directed.
Supplying and filling Quartz sand 16x 30 Mesh as filter media in the RAPID sand filtration plant plant complete all as specified and directed. Note: Grading and size of sand shall be tested in the approved laboratory and test results shall be submitted and the rate quoated shall be deemed to include the above provision
Supplying and filling Brown sand 8x12 Mesh as filter media in the RAPID sand filtration plant plant complete all as specified and directed. Note: Grading and size of sand shall be tested in the approved laboratory and test results shall be submitted and the rate quoated shall be deemed to include the above provision
Supplying and filling Brown sand 4x8 Mesh as filter media in the RAPID sand filtration plant plant complete all as specified and directed. Note: Grading and size of sand shall be tested in the approved laboratory and test results shall be submitted and the rate quoated shall be deemed to include the above provision
M & L for cleaning the Clarifier located at Berthuma Filtration plant by de-watering/Drainout the Clarifier , removing the silt/sludge deposited at bottom, walls complete, cleaning the sump internally using high pressure water jets complete all as specified and as directed by Engineer in charge
M & L for cleaning the Fluculator located at Berthuma Filtration plant by de-watering/Drainout the Fluculator , removing the silt/sludge deposited at bottom, walls complete, cleaning the sump internally using high pressure water jets complete all as specified and as directed by Ebngineer in charge
Supply and fix Single phase ,230 V, Self Priming pump set 0.5 HP capacity suitable for boiling out stagging water of filteration plant complete as per site requirement all as specified and directed by Enginner in Charge make: V Guard/CG/Texmo/CRI
M&L for unserviceable chainpulley alongwith lifting Alum dory and supply and fix as same as per site requirement complete all specified and directed by Engineer-in-Charge
Supply only following items for pump sets:-
Belt of size B-95/92/94
Compressor Oil
Belt for Air Compressor
M&L for cleaning complete Clarifier and fluculator MS plate foot path surface and side pipe railing, Scraping down the old faded existing paint and making the surface smooth by filling up the uneven surfaces with putty and scraping with emery sheet, applying two coats of synthetic enamel paint over one coat of red oxide primer, painting over the area all as specified and directed by Engineer -in-Charge.
Removing the wooden sleepers from the slots /opening of the anicut across the river Bewas at Chittora in the lean season and stacking them separately for their serviceability after applying black oil to serviceable sleepers and unserviceable sleepers shall be stacked properly for inspection all as directed by Engineer- in – Charge.
Supply and fixing new second class hard wood (well seasoned) wooden sleeper of size 150mmx 100 mm cross sectional size and not less than 1475 mm (59") long duly tapered at end for easy insertion in the slots complete with and incl 02 Nos eye hooks made out of MS plain round bar 20 mm dia 400 mm long for each hook and the dia of hook shall be 50 mm, the other end of the round bar shall be tapered and fixed with wooden sleeper incl applying a coat of coal tar on entire surface of sleepers as directed by Engr-in-charge
Refixing of wooden sleepers which are stacked at Chittora pump house in the slots of Anicut and tide with 18 SWG GI wire to protect the wooden sleepers , from washing out in heavy water current upto a level of 16 feet from bottom to anicut.
Taking down the exisitng defective unserviceable self starter fro Genset 12V capacity installed at various installation and replace with new self starter in same position and testing complete all as specified and directed
All as per Srl item No.54 above but 24V -ditto-
Desilting the Chittora anicut river bed from Anicut to Jack well by using JCB/Tractor dozer arrange sufficient man power to collect the deposited silt/rubbish and tree branches and any thing loading the tractor for stacked properly for measurement purpose and deposited to out of area of Chittora complete all as specified and directed by Engineer-in-Charge
SHRI RAM ELECTRICALS ENTERPRISES
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .