Loading
Loading…
Loading…
Tender Value
Refer Docs
Closing Date
14 Oct 2021, 3:00 pmClosed
PR & CC
Evaluation Criteria: Overall Lowest Cost Basis Award Criteria: 100% to L-1
21000565-HD-10157
21000565-HD-10157
Open Tender
Unknown (Unspecified Location)
₹0
Exempted
14 Oct 2021
23 Sept 2021
14 Oct 2021
14 Oct 2021
23 Sept 2021 - 1 Oct 2021
30 Sept 2021
| Item No | Item Title | Description | Qty | Unit |
|---|---|---|---|---|
| 1 | DESIGN&SPLY OF UNLOADING 16600-CGD HOWRAH AND | DESIGN&SPLY OF UNLOADING 16600-CGD HOWRAH AND — DESIGN AND SUPPLY OF LNG UNLOADING PUMPS AND LNG TANKS SKID WITH ALL NECESSARY AUXILIARY UNITS: BIDDER SCOPE INCLUDES BASIC DESIGN, DEVELOPMENT OF P AND ID, LAYOUT AS PER PESO RULES, DESIGN BASIS AND OTHER APPLICABLE GUIDELINES AND APPROVAL FROM COMPETENT AUTHORITIES, SCOPE ALSO INCLUDES BUT IS NOT LIMITED TO DESIGN, ENGINEERING, PROCUREMENT OF MATERIALS, INSPECTION, FABRICATION, PAINTING AND SUPPLY OF 2 NUMBERS LNG UNLOADING CENTRIFUGAL PUMP FOR FILLING UP LNG STORAGE TANKS FROM LNG TANKERS, 2 NUMBERS 56 KL CAPACITY DOUBLE-WALLED VACUUM INSULATED CRYOGENIC LNG STORAGE TANK(S), SUPPLY OF ASSOCIATED VALVES, FITTINGS, DOUBLE-WALLED VACCUUM JACKETED PIPING ETC, AS PER SCOPE OF WORK, PJS, DATASHEETS AND SPECIFICATION ETC, ATTACHED WITH TENDER DOCUMENTS, REQUIRED TO COMPLETE THE WORK THE WHOLE SYSTEM AS PER INDIAN REGULATIONS AND CODES, SCOPE SHALL ALSO INCLUDE DESIGN, SUPPLY AND INSTALLATION OF FIRE FIGHTING SYSTEM, EARTHING NETWORK, FLAMEPROOF YARD LIGHTING AND EMERGENCY LIGHTING, SAFETY INTERLOCKS/INSTRUMENTATION, EMERGENCY PUSH BUTTON, SAFETY EQUIPMENT (SUCH AS SAND BUCKETS, FIRE EXTINGUISHERS, WARNING SIGNS/MARKERS ETC,) INCLUDING SUPPLY OF REQUIRED MATERIALS, SYSTEM, AUTOMATION ETC, COMPLETE IN ALL RESPECTS TO SATISFY ALL APPLICABLE CODES AND STATUTORY NORMS IN INDIA, ALL THE CONSUMABLES AND SPARES REQUIRED FOR INSTALLATION,TESTING AND COMMISSIONING IS IN BIDDER SCOPE, PAYMENT TERMS: 1. 70 PERCENTAGE PAYMENT AGAINST RECEIPT OF MATERIAL AT SITE, 2. 15 PERCENTAGE ON COMPLETION OF ERECTION WORKS, 3. 5 PERCENTAGE ON TESTING AND PRE-COMMISSIONING, 4. 10 PERCENTAGE ON COMMISSIONING, SUBMISSION OF FINAL/AS BUILT DOCUMENTS AND ACCEPTANCE OF COMPLETE SYSTEM, CGD-LCNG. | - | Lump Sum |
| 2 | INSTLN AND COMMNG OF | INSTLN AND COMMNG OF — INSTALLATION, TESTING AND COMMISSIONING OF LNG UNLOADING PUMPS AND LNG TANKS SKID WITH ALL NECESSARY AUXILIARY UNITS: BIDDER SCOPE INCLUDES BASIC DESIGN, DEVELOPMENT OF P AND ID, LAYOUT AS PER PESO RULES, DESIGN BASIS AND OTHER APPLICABLE GUIDELINES AND APPROVAL FROM COMPETENT AUTHORITIES, SCOPE ALSO INCLUDES BUT IS NOT LIMITED TO DESIGN, ENGINEERING, PROCUREMENT OF MATERIALS, INSPECTION, FABRICATION, PAINTING AND SUPPLY OF 2 NUMBERS LNG UNLOADING CENTRIFUGAL PUMP FOR FILLING UP LNG STORAGE TANKS FROM LNG TANKERS, 2 NUMBERS 56 KL CAPACITY DOUBLE-WALLED VACUUM INSULATED CRYOGENIC LNG STORAGE TANK(S), SUPPLY OF ASSOCIATED VALVES, FITTINGS, DOUBLE-WALLED VACCUUM JACKETED PIPING ETC, AS PER SCOPE OF WORK, PJS, DATASHEETS AND SPECIFICATION ETC, ATTACHED WITH TENDER DOCUMENTS, REQUIRED TO COMPLETE THE WORK THE WHOLE SYSTEM AS PER INDIAN REGULATIONS AND CODES, SCOPE SHALL ALSO INCLUDE DESIGN, SUPPLY AND INSTALLATION OF FIRE FIGHTING SYSTEM, EARTHING NETWORK, FLAMEPROOF YARD LIGHTING AND EMERGENCY LIGHTING, SAFETY INTERLOCKS/INSTRUMENTATION, EMERGENCY PUSH BUTTON, SAFETY EQUIPMENT (SUCH AS SAND BUCKETS, FIRE EXTINGUISHERS, WARNING SIGNS/MARKERS ETC,) INCLUDING SUPPLY OF REQUIRED MATERIALS, SYSTEM, AUTOMATION ETC, COMPLETE IN ALL RESPECTS TO SATISFY ALL APPLICABLE CODES AND STATUTORY NORMS IN INDIA, ALL THE CONSUMABLES AND SPARES REQUIRED FOR INSTALLATION.TESTING AND COMMISSIONING IS IN BIDDER SCOPE, PAYMENT TERMS: 1. 90 PERCENTAGE ON INSTALLATION, TESTING AND COMMISSIONING OF EQUIPMENT, 2. 10 PERCENTAGE ON COMMISSIONING AND ACCEPTANCE OF COMPLETE SYSTEM, CGD-LCNG. | - | Lump Sum |
| 3 | VAPORIZER,LOW | VAPORIZER,LOW — VAPORIZER; TYPE:LOW PRESSURE; CAPACITY:2000 SCMH; HEATING LOAD:N/A; ODORIZER AND PRESSURE REDUCTION SKID ALONG WITH RPD FLOW METER ALL NECESSARY AUXILIARY UNITS, BIDDER SCOPE INCLUDES BASIC DESIGN, DEVELOPMENT OF P AND ID, LAYOUT AS PER PESO RULES, DESIGN BASIS AND OTHER APPLICABLE GUIDELINES AND APPROVAL FROM COMPETENT AUTHORITIES, SCOPE ALSO INCLUDES BUT IS NOT LIMITED TO DESIGN, ENGINEERING, PROCUREMENT OF MATERIALS, INSPECTION, FABRICATION, PAINTING AND SUPPLY OF 2 NUMBERS (1 WORKING + 1 STAND-BY/DEFROSTING) LOW PRESSURE VAPORIZER FOR SUPPLYING GAS FOR PNG AT THE RATE 4 BAR, PRESSURE REGULATING SKID FOR REGULATING PRESSURE FOR PNG SUPPLY, ODORIZING SKID INCLUDING 1ST FILL OF ODORANT, SUPPLY OF ASSOCIATED VALVES, FITTINGS, DOUBLE-WALLED VACUUM JACKETED PIPING ETC. AS PER SCOPE OF WORK, PJS, DATASHEETS AND SPECIFICATION ETC, ATTACHED WITH TENDER DOCUMENTS, REQUIRED TO COMPLETE THE WORK THE WHOLE SYSTEM AS PER INDIAN REGULATIONS AND CODES, SCOPE SHALL ALSO INCLUDE DESIGN, SUPPLY AND INSTALLATION OF FIRE FIGHTING SYSTEM, EARTHING NETWORK, FLAME PROOF YARD LIGHTING AND EMERGENCY LIGHTING, SAFETY INTERLOCKS/INSTRUMENTATION, EMERGENCY PUSH BUTTON, SAFETY EQUIPMENT (SUCH AS SAND BUCKETS, FIRE EXTINGUISHERS, WARNING SIGNS/MARKERS ETC,) INCLUDING SUPPLY OF REQUIRED MATERIALS, SYSTEM, AUTOMATION ETC, COMPLETE IN ALL RESPECTS TO SATISFY ALL APPLICABLE CODES AND STATUTORY NORMS IN INDIA, ALL THE CONSUMABLES AND SPARES REQUIRED FOR INSTALLATION, TESTING AND COMMISSIONING IS IN BIDDER SCOPE, FIRST FILL OF ODORIZATION UNIT IS ALSO IN BIDDER, 1. 70 PERCENTAGE PAYMENT AGAINST RECEIPT OF MATERIAL AT SITE, 2. 15 PERCENTAGE ON COMPLETION OF ERECTION WORKS, 3. 5 PERCENTAGE ON TESTING AND PRE-COMMISSIONING, 4. 10 PERCENTAGE ON COMMISSIONING, SUBMISSION OF FINAL/AS BUILT DOCUMENTS AND ACCEPTANCE OF COMPLETE SYSTEM.RE REDUCTION SKID ALONG WITH RPD FLOW METER ALL NECESSARY AUXILIARY UNITS AS DESCRIBED ABOVE, CGD-LCNG | - | Lump Sum |
| 4 | INSTLN AND COMMNG OF | INSTLN AND COMMNG OF — INSTALLATION, TESTING AND COMMISSIONING OF LOW PRESSURE VAPORIZER (2000 SCMH), ODORIZER AND PRESSURE REDUCTION SKID ALONG WITH RPD FLOW METER ALL NECESSARY AUXILIARY UNITS: BIDDER SCOPE INCLUDES BASIC DESIGN, DEVELOPMENT OF P AND ID, LAYOUT AS PER PESO RULES, DESIGN BASIS AND OTHER APPLICABLE GUIDELINES AND APPROVAL FROM COMPETENT AUTHORITIES, SCOPE ALSO INCLUDES BUT IS NOT LIMITED TO DESIGN, ENGINEERING, PROCUREMENT OF MATERIALS, INSPECTION, FABRICATION, PAINTING AND SUPPLY OF 2 NUMBERS (1 WORKING + 1 STAND-BY/DEFROSTING) LOW PRESSURE VAPORIZER FOR SUPPLYING GAS FOR PNG AT THE RATE 4 BAR, PRESSURE REGULATING SKID FOR REGULATING PRESSURE FOR PNG SUPPLY, ODORIZING SKID INCLUDING 1ST FILL OF ODORANT, SUPPLY OF ASSOCIATED VALVES, FITTINGS, DOUBLE- WALLED VACUUM JACKETED PIPING ETC. AS PER SCOPE OF WORK, PJS, DATASHEETS AND SPECIFICATION ETC, ATTACHED WITH TENDER DOCUMENTS, REQUIRED TO COMPLETE THE WORK THE WHOLE SYSTEM AS PER INDIAN REGULATIONS AND CODES, SCOPE SHALL ALSO INCLUDE DESIGN, SUPPLY AND INSTALLATION OF FIRE FIGHTING SYSTEM, EARTHING NETWORK, FLAME PROOF YARD LIGHTING AND EMERGENCY LIGHTING, SAFETY INTERLOCKS/INSTRUMENTATION, EMERGENCY PUSH BUTTON, SAFETY EQUIPMENT (SUCH AS SAND BUCKETS, FIRE EXTINGUISHERS, WARNING SIGNS/MARKERS ETC,) INCLUDING SUPPLY OF REQUIRED MATERIALS, SYSTEM, AUTOMATION ETC, COMPLETE IN ALL RESPECTS TO SATISFY ALL APPLICABLE CODES AND STATUTORY NORMS IN INDIA, ALL THE CONSUMABLES AND SPARES REQUIRED FOR INSTALLATION, TESTING AND COMMISSIONING IS IN BIDDER SCOPE, FIRST FILL OF ODORIZATION UNIT IS ALSO IN BIDDER, PAYMENT TERMS: 1. 90 PERCENTAGE ON INSTALLATION, TESTING AND COMMISSIONING OF EQUIPMENT, 2. 10 PERCENTAGE ON COMMISSIONING AND ACCEPTANCE OF COMPLETE SYSTEM, CGD-LCNG. | - | Lump Sum |
| 5 | VAPORIZER,HIGH | VAPORIZER,HIGH — VAPORIZER; TYPE:HIGH PRESSURE; CAPACITY:650 SCMH; HEATING LOAD:N/A; HIGH PRESSURE PUMP, ODORIZER SKID ALONG WITH PRIORITY PANEL, MASS FLOW METERS, MOBILE CASCADE LOADING ARRANGEMENT AND ALL OTHER NECESSARY AUXILIARY UNITS, BIDDER SCOPE INCLUDES BASIC DESIGN, DEVELOPMENT OF P AND ID, LAYOUT AS PER PESO RULES, DESIGN BASIS AND OTHER APPLICABLE GUIDELINES AND APPROVAL FROM COMPETENT AUTHORITIES, SCOPE ALSO INCLUDES BUT IS NOT LIMITED TO DESIGN, ENGINEERING, PROCUREMENT OF MATERIALS, INSPECTION, FABRICATION, PAINTING AND SUPPLY OF 2 NUMBERS (1 WORKING + 1 STANDBY) HIGH PRESSURE RECIPROCATING PUMP, 1 + 1 (STANDBY) NUMBER HIGH PRESSURE VAPORIZER ALONG WITH ASSOCIATED AUTOMATION, ODORIZING SKID INCLUDING 1ST FILL OF ODORANT, PRIORITY PANEL, CANOPY, 1 NUMBER STATIONARY CASCADE FILLING FACILITY WITH 2 NUMBER LCV FILLING POINT AND 2 NUMBERS DISPENSER FILLING POINTS, SUPPLY OF COMPRESSOR FOR UTILITY AIR REQUIREMENTS, SUPPLY OF ASSOCIATED VALVES, FITTINGS, DOUBLE-WALLED VACUUM JACKETED PIPING ETC, AS PER SCOPE OF WORK, PJS, DATASHEETS AND SPECIFICATION ETC, ATTACHED WITH TENDER DOCUMENTS, REQUIRED TO COMPLETE THE WORK THE WHOLE SYSTEM AS PER INDIAN REGULATIONS AND CODES, SCOPE SHALL ALSO INCLUDE DESIGN, SUPPLY AND INSTALLATION OF FIRE FIGHTING SYSTEM, EARTHING NETWORK, FLAME PROOF YARD LIGHTING AND EMERGENCY LIGHTING, SAFETY INTERLOCKS/INSTRUMENTATION, EMERGENCY PUSH BUTTON, SAFETY EQUIPMENT (SUCH AS SAND BUCKETS, FIRE EXTINGUISHERS, WARNING SIGNS/MARKERS ETC,) INCLUDING SUPPLY OF REQUIRED MATERIALS, SYSTEM, AUTOMATION ETC. COMPLETE IN ALL RESPECTS TO SATISFY ALL APPLICABLE CODES AND STATUTORY NORMS IN INDIA, ALL THE CONSUMABLES AND SPARES REQUIRED FOR INSTALLATION, TESTING AND COMMISSIONING IS IN BIDDER SCOPE, FIRST FILL OF ODORIZATION UNIT IS ALSO IN BIDDER: PAYMENT TERMS: 1. 70 PERCENTAGE PAYMENT AGAINST RECEIPT OF MATERIAL AT SITE, 2. 15 PERCENTAGE ON COMPLETION OF ERECTION WORKS, 3. 5 PERCENTAGE ON TESTING AND PRE-COMMISSIONING, 4. 10 PERCENTAGE ON COMMISSIONING, SUBMISSION OF FINAL/AS BUILT DOCUMENTS AND ACCEPTANCE OF COMPLETE SYSTEM.RE REDUCTION SKID ALONG WITH RPD FLOW METER ALL NECESSARY AUXILIARY UNITS AS DESCRIBED ABOVE, CGD-LCNG | - | Lump Sum |
| 6 | INSTLN AND COMMNG OF | INSTLN AND COMMNG OF — INSTALLATION, TESTING AND COMMISSIONING OF HIGH PRESSURE VAPORIZER (650 SCMH) AND HIGH PRESSURE PUMP, ODORIZER SKID ALONG WITH PRIORITY PANEL, MASS FLOW METERS, MOBILE CASCADE LOADING ARRANGEMENT AND ALL OTHER NECESSARY AUXILIARY UNITS: BIDDER SCOPE INCLUDES BASIC DESIGN, DEVELOPMENT OF P AND ID, LAYOUT AS PER PESO RULES, DESIGN BASIS AND OTHER APPLICABLE GUIDELINES AND APPROVAL FROM COMPETENT AUTHORITIES, SCOPE ALSO INCLUDES BUT IS NOT LIMITED TO DESIGN, ENGINEERING, PROCUREMENT OF MATERIALS, INSPECTION, FABRICATION, PAINTING AND SUPPLY OF 2 NUMBERS (1 WORKING + 1 STANDBY) HIGH PRESSURE RECIPROCATING PUMP, 1 + 1 (STANDBY) NUMBER HIGH PRESSURE VAPORIZER ALONG WITH ASSOCIATED AUTOMATION, ODORIZING SKID INCLUDING 1ST FILL OF ODORANT, PRIORITY PANEL, CANOPY, 1 NUMBER STATIONARY CASCADE FILLING FACILITY WITH 2 NUMBER LCV FILLING POINT AND 2 NUMBERS DISPENSER FILLING POINTS, SUPPLY OF COMPRESSOR FOR UTILITY AIR REQUIREMENTS, SUPPLY OF ASSOCIATED VALVES, FITTINGS, DOUBLE-WALLED VACUUM JACKETED PIPING ETC, AS PER SCOPE OF WORK, PJS, DATASHEETS AND SPECIFICATION ETC, ATTACHED WITH TENDER DOCUMENTS, REQUIRED TO COMPLETE THE WORK THE WHOLE SYSTEM AS PER INDIAN REGULATIONS AND CODES, SCOPE SHALL ALSO INCLUDE DESIGN, SUPPLY AND INSTALLATION OF FIRE FIGHTING SYSTEM, EARTHING NETWORK, FLAME PROOF YARD LIGHTING AND EMERGENCY LIGHTING, SAFETY INTERLOCKS/INSTRUMENTATION, EMERGENCY PUSH BUTTON, SAFETY EQUIPMENT (SUCH AS SAND BUCKETS, FIRE EXTINGUISHERS, WARNING SIGNS/MARKERS ETC,) INCLUDING SUPPLY OF REQUIRED MATERIALS, SYSTEM, AUTOMATION ETC. COMPLETE IN ALL RESPECTS TO SATISFY ALL APPLICABLE CODES AND STATUTORY NORMS IN INDIA, PAYMENT TERMS: 1. 90 PERCENTAGE ON INSTALLATION, TESTING AND COMMISSIONING OF EQUIPMENT, 2. 10 PERCENTAGE ON COMMISSIONING AND ACCEPTANCE OF COMPLETE SYSTEM, CGD-LCNG. | - | Lump Sum |
| 7 | ALL ELECTRICAL WORK | ALL ELECTRICAL WORK — ALL OTHER SAFETY, PLC, SCADA, ELECTRICAL ETC WORK REQUIRED TO MAKE THE SYSTEM WORK, SCOPE SHALL ALSO INCLUDE DESIGN, SUPPLY AND INSTALLATION OF FIRE FIGHTING SYSTEM, EARTHING NETWORK, FLAME PROOF YARD LIGHTING AND EMERGENCY LIGHTING, SAFETY INTERLOCKS/INSTRUMENTATION, EMERGENCY PUSH BUTTON, SAFETY EQUIPMENT (SUCH AS SAND BUCKETS, FIRE EXTINGUISHERS, WARNING SIGNS/ MARKERS ETC.) INCLUDING SUPPLY OF REQUIRED MATERIALS, SYSTEM, AUTOMATION ETC. COMPLETE IN ALL RESPECTS TO SATISFY ALL APPLICABLE CODES AND STATUTORY NORMS IN INDIA, DESIGN, SUPPLY OF ALL REQUIRED STRUCTURAL, ELECTRICAL, INSTRUMENTATION, PLC AND SCADA SYSTEM ETC. TO COMPLETE THE WORK IN ALL RESPECTS SHALL ALSO BE INCLUDED IN THE SCOPE, ALL THE CONSUMABLES AND SPARES REQUIRED FOR INSTALLATION.TESTING AND COMMISSIONING IS IN BIDDER SCOPE, PAYMENT TERMS: 1. 90 PERCENTAGE ON INSTALLATION, TESTING AND COMMISSIONING OF EQUIPMENT, 2. 10 PERCENTAGE ON COMMISSIONING AND ACCEPTANCE OF COMPLETE SYSTEM, CGD-LCNG. | - | Lump Sum |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
21000565-HD-10157.pdf
TENDER_DOCUMENT • 20.86 MB
Download all tender documents and submit your bid