Loading…
Loading…
Tender ID
Tender Value
₹3.2 Cr
EMD Value
₹6.5 L
Closing Date
10 Mar 2026, 12:00 pmClosed
Commandant (E) FHQ BSF N/Delhi
FHQ BSF New Delhi
Replacement of left out border flood lights Poles and UG cables of source BOPs in area of responsibility of SHQ BSF I/Nagar under FTR BSF Jammu. (Sub work/ Package III Replacement of BFL pole with octagonal Pole in AOR of 82 Bn Under SHQ BSF I/NGR
2026_BSF_899381_1
08 /SE(E)/NIT/FTR-JMU/ENGG/25-26
Open Tender
Electrical Works
Percentage
180 days
in AOR of 82 Bn BSF (BOP Gurnam to BOP Chillayari)
As per NIT
16 documents required · 16 mandatory
₹0
₹6.5 L
20 Feb 2026
19 Feb 2026
11 Mar 2026
19 Feb 2026
10 Mar 2026
20 Feb 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by mechanical means (Hydraulic excavator)/ manual means in foundation trenches or drains (not exceeding 1.5 m in width 10 sqm on plan) including dressing of sides and ramming of bottoms ,lift up to 1.5m ,including getting out the excavated soil and disposal of surplus excavated soil as a directed , within a lead of 50 m . All kinds of soil | 511.92 | Cum | 260.3 | ₹1,33,252.78 |
| 2 | Filling available excavated earth (excluding rock) in trenches , plinth, sides of foundations etc. In layer not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering ,lead up to 50m and lift up to 1.5m | 229.89 | Cum | 196 | ₹45,058.44 |
| 3 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources) | 52.14 | Cum | 6,812 | ₹3,55,177.68 |
| 4 | Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level : 1:1.5:3 (1 cement : 1.5 coarse sand (zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources) | 338.91 | Cum | 9,045.75 | ₹30,65,695.13 |
| 5 | Centering and shuttering including strutting, propping etc. and removal of form for Foundations, footings, bases of columns, etc. for mass concrete | 1,578.42 | sqm | 392.15 | ₹6,18,977.4 |
| 6 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level. Thermo-Mechanically Treated bars of grade Fe-500D or more. | 23,114.61 | Kg | 107.85 | ₹24,92,910.69 |
| 7 | Modified Estimated Cost after using correction factor on DSR 2023 on account of GST @ 0.973 | 1 | Each | -1,81,198.95 | - |
| 8 | Add Cost Index @ on DSR item | 1 | Each | 7,31,998.78 | ₹7,31,998.78 |
| 9 | Earthing with G.I. earth pipe 4.5 meter long, 40 mm dia including accessories, and providing masonry enclosure with cover plate having locking arrangement and watering pipe etc. with charcoal/
coke and salt as required | 237 | set | 6,855 | ₹16,24,635 |
| 10 | Providing and fixing 6 SWG dia G.I. wire on surface or in recess for loop earthing as required. | 1,185 | Mtrs | 70 | ₹82,950 |
stage.html
html • 0.02 MB
cancelled_1.pdf
pdf • 0.29 MB
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.94 MB
BOQ_945352.xls
BOQ • 0.27 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .