Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹24.5 LAdmitted-Fee/PreQual/Technical/Finance | -7.13% | ₹24.5 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L2₹25.8 L+₹1.3 L (5.32%)Admitted-Fee/PreQual/Technical/Finance | -2.19% | ₹25.8 L+₹1.3 L (5.32%) | L2 | Admitted-Fee/PreQual/Technical/Finance |
| 3 | L3₹26.0 L+₹1.6 L (6.35%)Admitted-Fee/PreQual/Technical/Finance | -1.23% | ₹26.0 L+₹1.6 L (6.35%) | L3 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹26.4 L
EMD Value
₹80,000
Closing Date
21 Aug 2026, 12:00 pmClosed
Executive Engineer PHE Division Pulwama
Executive Engineer PHE Division Pulwama
same as above
2026_PHE_319088_4
o6/PHEP OF 2026-27
Open Tender
Civil Works - Water Works
Percentage
90 days
Executive Engineer PHE Division Pulwama
Please refer Tender documents.
2 documents required · 2 mandatory
₹800
Executive Engineer PHE Division Pulwama
₹80,000
27 Aug 2026
3 Aug 2026
21 Aug 2026
3 Aug 2026
21 Aug 2026
3 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Upgradation of pipe network at various mohallas of village Uthmulla (PHEDC2627100001) | - | - | - | - |
| 2 | Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed:All kinds of soil : | 97.44 | cum | 479.3 | ₹46,702.99 |
| 3 | Earth work in excavation by mechanical means (hydraulic excavator) in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and
disposal of surplus excavated earth as directed, within a lead of 50 metres:All kinds of soil : | 41.76 | cum | 256.85 | ₹10,726.06 |
| 4 | Providing and fixing G.I. pipes complete with G.I. fittings excluding trenching and refilling etc. (external work) | - | - | - | - |
| 5 | 20 mm dia. nominal bore | 160 | RM | 227.9 | ₹36,464 |
| 6 | 25 mm dia. nominal bore | 300 | RM | 311.95 | ₹93,585 |
| 7 | 40 mm dia. nominal bore | 250 | RM | 434.65 | ₹1,08,662.5 |
| 8 | 50 mm dia. nominal bore | 300 | RM | 532.8 | ₹1,59,840 |
| 9 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead upto 50 m and lift upto 1.5 m. | 125.28 | cum | 218.4 | ₹27,361.15 |
| 10 | Welding, including transportation of plant at site etc. complete | 5 | hourt | 850 | ₹4,250 |
stage.html
html • 0.02 MB
finance_1055386.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.17 MB
BOQ_1055386.xls
BOQ • 0.32 MB
corrigendum.pdf
PDF • 0.89 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .