| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹2.9 LAccepted-AOC STATION ROAD P O UKHRA DIST BURDWAN PIN 713363 W B | UKHRA | BURDWAN | WEST BENGAL | 713363 | 1 | Accepted-AOC Eligible L-1 Bidder | |
| 2 | 2₹3.0 L+₹6,245.13 (2.16%)Rejected-Finance VILL PO BANSRA RANIGANJ BARDHAMAN BARDHAMAN 713358 WEST BENGAL INDIA | BARDHAMAN | BARDHAMAN | WEST BENGAL | 713358 | 2 | Rejected-Finance Quoted Rate more than L-1 Bidder | |
| 3 | 3₹3.0 L+₹7,065.03 (2.44%)Rejected-Finance | 3 | Rejected-Finance Quoted Rate more than L-1 Bidder |
Tender Value
₹2.8 L
EMD Value
₹3,500
Closing Date
30 May 2024, 5:00 pmClosed
AE EnM
Sonepur Bazari Area
Complete rewinding and repairing of 500KVA, 3.3KV-440V transformer of AndrewYule make for Haripur Colony.
2024_ECL_308220_1
GM/SBA/EnM/e-Tender/24-25/05
Open Tender
Electrical and Maintenance Works
Item Rate
30 days
Sonepur Bazari Area
Please refer tender documents
5 documents required · 5 mandatory
₹3,500
25 Jul 2024
18 May 2024
1 Jun 2024
20 May 2024
30 May 2024
20 May 2024
20 May 2024 - 23 May 2024
Amount
Item Description/ Heading
Material Cost
Cost of Electrolyte grade TPC copper wire for primary(216kgs.) and secondary coil (154kgs) for 3 coil.
Reformation of coil after rewinding of Primary and secondary coil including supply of required insulation (Primary- 21kgs. + Secondary-154kgs.).
Supply of current carrying contacts for primary side terminals of rated size.
Supply of current carrying contacts for secondary side terminals of rated size.
Cost of press pond paper for separator of oil duet.
Providing gasket joints, copper nut and bolts etc.
Dehydration and filtration of transformer oil.
Cleaning of core tank and other parts.
To and fro transporting charges including loading, unloading.
Testing charges
Supply & fixing of brass stud with insulator
Less: Scrap value
Labour Cost:-
Fixing of current carrying contacts for primary side terminals of rated size.
Fixing of current carrying contacts for secondary side terminals of rated size.
Dehydration and filtration of transformer oil.
Dismantling of top cover, conservator tank, primary & secondary terminal bushing after draining out of transformer oil from tank.
Cleaning of core tank and other parts.
Testing charges.
Fixing of brass stud with insulator.
Labour charges for rewinding, dismantling, fitting etc
P. F. amount for labour cost
Total impact of GST for the purpose of CTC
LAKSHMI ELECTRICAL WORKS
DUTTA ELECTRIC
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_319372.pdf
boq_comp_chart.xlsx
xlsx
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .