Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹12.4 LAdmitted-Finance | -10.10% | ₹12.4 L | L1 | Admitted-Finance |
| 2 | L2₹12.8 L+₹43,102.21 (3.48%)Admitted-Finance | -6.97% | ₹12.8 L+₹43,102.21 (3.48%) | L2 | Admitted-Finance |
| 3 | L3₹13.5 L+₹1.1 L (8.68%)Admitted-Finance | -2.30% | ₹13.5 L+₹1.1 L (8.68%) | L3 | Admitted-Finance |
Tender Value
₹13.8 L
EMD Value
₹27,540
Closing Date
20 Jul 2026, 3:00 pmClosed
XEN PHE DIV REASI
XEN PHE DIV REASI
Restoration Re-construction of Different water supply of Pouni, Bhomag, Reasi and Arnas Block in Sub Division Reasi under SASCI.
2026_PHE_314473_1
ENIT NO. 27 OF 2026-27 DT. 03-07-2026
Open Tender
Civil Works
Percentage
60 days
REASI
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,000
XEN PHE DIV REASI
₹27,540
27 Jul 2026
3 Jul 2026
21 Jul 2026
3 Jul 2026
20 Jul 2026
3 Jul 2026
3 Jul 2026 - 4 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed: All kinds of soil. | 203.04 | Cum | 479.3 | ₹97,317.07 |
| 2 | Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed: Ordinary Rock | 50.76 | Cum | 924.8 | ₹46,942.85 |
| 3 | Earth work in bulk excavation by manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-Charge. All kinds of soil : | 64.8 | Cum | 592.9 | ₹38,419.92 |
| 4 | Providing and fixing G.I. pipes complete with G.I. fittings excluding trenching and refilling etc. (external work) 80 mm dia. nominal bore (L) | 30 | Mtr | 878.25 | ₹26,347.5 |
| 5 | Providing and fixing G.I. pipes complete with G.I. fittings excluding trenching and refilling etc. (external work) 65 mm dia. nominal bore (L) | 210 | Mtr | 745.1 | ₹1,56,471 |
| 6 | Providing and fixing G.I. pipes complete with G.I. fittings excluding trenching and refilling etc. (external work) 50 mm dia. nominal bore (L) | 270 | Mtr | 532.8 | ₹1,43,856 |
| 7 | Providing and fixing G.I. pipes complete with G.I. fittings excluding trenching and refilling etc. (external work) 20 mm dia. nominal bore (L) | 180 | Mtr | 227.9 | ₹41,022 |
| 8 | Providing and fixing G.I. pipes complete with G.I. fittings excluding trenching and refilling etc. (external work) 15 mm dia. nominal bore (L) | 150 | Mtr | 179.2 | ₹26,880 |
| 9 | Providing, laying, fixing & jointing of ISI marked HDPE pipes as per ISI-4984-1995 casting along the trenches and laying the same in trenches to correct allignment and gradient, cutting, jointing & testing complete as per specifications. HDPE 50 mm PN-10 | 300 | Mtr | 140.2 | ₹42,060 |
| 10 | Providing, laying, fixing & jointing of ISI marked HDPE pipes as per ISI-4984-1995 casting along the trenches and laying the same in trenches to correct allignment and gradient, cutting, jointing & testing complete as per specifications. HDPE 32 mm PN-10 | 200 | Mtr | 63.1 | ₹12,620 |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.66 MB
BOQ_1018172.xls
BOQ • 0.30 MB
corrigundum13to31.pdf
PDF • 0.23 MB
CORRIGENDUM_1st_13to27.pdf
PDF • 0.16 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .