| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹36.2 LAdmitted-Fee/PreQual/Technical/Finance | -21.65% | ₹36.2 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L2₹36.4 L+₹25,388.11 (0.70%)Admitted-Fee/PreQual/Technical/Finance | -21.10% | ₹36.4 L+₹25,388.11 (0.70%) | L2 | Admitted-Fee/PreQual/Technical/Finance |
| 3 | L3₹37.9 L+₹1.7 L (4.68%)Admitted-Fee/PreQual/Technical/Finance | -17.98% | ₹37.9 L+₹1.7 L (4.68%) | L3 | Admitted-Fee/PreQual/Technical/Finance |
| 4 | L4₹38.3 L+₹2.1 L (5.81%)Admitted-Fee/PreQual/Technical/Finance | -17.10% | ₹38.3 L+₹2.1 L (5.81%) | L4 | Admitted-Fee/PreQual/Technical/Finance |
| 5 | L5₹38.8 L+₹2.6 L (7.22%)Admitted-Fee/PreQual/Technical/Finance | -15.99% | ₹38.8 L+₹2.6 L (7.22%) | L5 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹46.2 L
EMD Value
₹1.4 L
Closing Date
12 Aug 2026, 3:00 pmClosed
EXECUTIVE ENGINEER REW KUPWARA
EXECUTIVE ENGINEER REW KUPWARA
Construction of 3-KLD FSTP (Capacity 3 KLD) at
2026_RDPR_319493_2
NIT NO 84 OF 2026-27 FSTP
Open Tender
Civil Works
Percentage
EXECUTIVE ENGINEER REW KUPWARA
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,200
EXECUTIVE ENGINEER REW KUPWARA
₹1.4 L
18 Aug 2026
5 Aug 2026
12 Aug 2026
5 Aug 2026
12 Aug 2026
5 Aug 2026
5 Aug 2026 - 5 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in bulk excavation by mechanical means (hydraulic excavator) over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-Charge. All kinds of soil | - | Cum | - | - |
| 2 | Filling available excavated earth in trenches, plinth, sides of foundations etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead upto 50 m and lift upto 1.5 m. | - | Cum | - | - |
| 3 | P/L of Granular sub-base (GSB) by providing close graded Material conforming to specifications | - | Cum | - | - |
| 4 | Supply stacking and layingof WBM Grade 2 (63-45)mm in size including screening 13.2mm and binding material moorum / khakbajri including consolidation with 8-10 tonne capacity road roller incl carriage of material from source to site of work by MT 30KM | - | Cum | - | - |
| 5 | Hand-packing stones /Dumping stone in Horizontal on level including of carriage | - | Cum | 1 | - |
| 6 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: in 1:3:6 using 20mm nominal size aggregate including carriage all complete | - | Cum | - | - |
| 7 | Reinforced cement concrete work in walls (any thickness) including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts upto floor five level including curing but excluding cost of centering shuttering, finishing and reinforcement 1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size) including carriage all complete | - | Cum | - | - |
| 8 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with:1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) including carriage all complete | - | Cum | - | - |
| 9 | Reinforced cement concrete work in walls (any thickness) including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts upto floor five level including curing but excluding cost of centering shuttering, finishing and reinforcement 1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size) | - | Cum | - | - |
| 10 | Providing T.M.T steel reinforcement for R.C.C work including straightening, cutting, bending, hooking, placing in position, lapping and / or welding wherever required, tying with binding wire and anchoring to the adjoining members wherever necessary complete as per design (laps, hooks and wastage shall not be measured and paid) including for OHT & reservoier, cost of materials, labour, HOM of machinery complete as per specifications. | - | Kgs | - | - |
stage.html
html • 0.03 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.38 MB
BOQ_1058544.xls
BOQ • 0.27 MB
DATEEXTEND84.pdf
PDF • 0.56 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .