| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹13.1 LAdmitted-Finance | -0.23% | ₹13.1 L | L1 | Admitted-Finance |
| 2 | L2₹13.1 LAdmitted-Finance | -0.11% | ₹13.1 L | L2 | Admitted-Finance |
| 3 | L3₹13.2 LAdmitted-Finance | -0.06% | ₹13.2 L | L3 | Admitted-Finance |
Tender Value
₹13.2 L
EMD Value
₹65,780
Closing Date
30 Apr 2026, 2:00 pmClosed
PO DUDA BIJNOR
O/O PO DUDA BIJNOR
NP JALALABAD KE WARD 10 MAI MOH SHEKH SARAI MAI MAIN ROAD SE RASHID KE MAKAN INTERLOKING ROAD NALI
2026_SUDA_1140587_4
39
Open Tender
Civil Works
90 days
BIJNOR
PLEASE REFER TENDER NOTICE
2 documents required · 2 mandatory
₹854
PO DUDA BIJNOR
₹65,780
2 May 2026
24 Apr 2026
30 Apr 2026
24 Apr 2026
30 Apr 2026
24 Apr 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount | Item Code |
|---|---|---|---|---|---|---|
| 1 | E/W in cutting or in embankment in ordinary soil including ramming and dressing the surface to required levels and slopes.excavated earth carted from distance up to 5.0Km as per direction of Er. I/c S.I.No. 253(a)+ chapter 4 S.I.No. 261 | 387 | M3 | 281.5 | ₹1,08,940.5 | Dismentling of old and damage C.C Road including stacking of dismental material as directed by Engineer in charge with in a distance 60M i/c all T&P etc . Required for proper Completion of work.S.I.no 697. |
| 2 | Concrete with 4cm gauge approved Stone ballast, coarse sand and cement in proportion of 8:4:1 including supply of all materials labour and completion of the work .S I no 281 | 17.82 | M3 | 6,850 | ₹1,22,067 | Disposal of dismentling c.c. road material with cartage upto distance 3.00 km i/c loading and unloading 80% of Item no 1 including T&P etc . Required for proper completion of work. S.I.no 231(a). |
| 3 | M 150 Class Brick Work 1:4 Cement and approved Coarse sand of 2.25 fm in foundation and plinth including supply of all materials, labour Taxes and T&P etc required for proper completion of work S.I. No. 305 | 59.28 | M3 | 5,110 | ₹3,02,920.8 | Dismentling of B.O.E / interlocking tiles soling & Stacking of dismantalled bricks / tilesat side (labour only)S.I.no 2 (non schedule Item ch.-18) |
| 4 | 12 MM thick Plaster with one part of cement and four part of approved Corse Sand Mortar including supply of all materials labour and completion of the work S.I.no 584. | 55.2 | M2 | 204 | ₹11,260.8 | M 150 Class Brick Work 1:4 Cement and approved Coarse sand of 2.25 fm in foundation and plinth including supply of all materials, labour Taxes and T&P etc required for proper completion of work S.I. No. 307 (a) |
| 5 | Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with smooth wheel roller 80-100 kN in stages to proper grade and camber, applying and brooming, stone screening to fill-up the interstices of coarse aggregate, watering and compacting to the required density Grading 3 as per Technical Specification Clause 405. | 43.5 | M3 | 2,786 | ₹1,21,191 | 12 MM thick Plaster with one part of cement and four part of approved Corse Sand Mortar including supply of all materials labour and completion of the work S.I.no 584. |
| 6 | S/Laying of 80mm thick I Shadped Vibrator made interlocking Cement Conc Paver Block(cement gray and red colour) i/c joint filling with local sand i/c all complete at site | 435 | M2 | 910 | ₹3,95,850 | Concrete with 4cm gauge approved Stone ballast, coarse sand and cement in proportion of 10:5:1 including supply of all materials labour and completion of the work .S I no 281 a |
| 7 | Concrete with 2cm gauge approved Stone ballast, coarse sand and cement in proportion of 4:2:1 including supply of all materials labour and completion of the work .S I no 279 a | 5.16 | M3 | 7,600 | ₹39,216 | Column |
| 8 | R.C.C. work with cement C-sand and stone grit in 1:2:4 in lintels etc excluding s/o rainforcement and its binding but including fixing binding centering and shuttering including supply of all materials labourand T&P etc required for proper completion of the work as per S.I.No.-284 | 0.63 | M3 | 8,050 | ₹5,071.5 | Supply and Laying Stone Ballast with Fine sand i/c leveling / Compaction by 8-10 ton road roller etc labour and T&P Proper Completion of Work. |
| 9 | M.S. or Iron work in plain work such as R.C.C. or R.B. work including bending for proper completion of work and including supply of steel as per complete S.I.no.504 | 0.6 | Qtl | 6,994 | ₹4,196.4 | Supply and Laying of New 80mm thick pavers block Vibratour Made i/c joints filling with local sand i/c supply of all materials labour and T&P Proper Completion of Work. |
| 10 | S/F Sine Board at site including material labour and T&P etc.as per direction of Engineer incharge. etc complete. | 1 | Nos | 4,500 | ₹4,500 | Concrete with 2cm gauge approved Stone ballast, coarse sand and cement in proportion of 4:2:1 including supply of all materials labour and completion of the work .S I no 279 a |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.06 MB
BOQ_2129995.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid