Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹4.0 LAccepted-AOC DEVGAH P O KUDRI BURHAR DISTT SHAHDOL M P | BURHAR | SHAHDOL | MADHYA PRADESH | 484110 | L-1 | Accepted-AOC Accepted as L-1 | |
| 2 | Rejected-Technical SUBHASH CHOWK NO 03 DHANPURI DISTT SHAHDOL MP | DHANPURI | SHAHDOL | MADHYA PRADESH | 484114 | - | Rejected-Technical Rejected as L-3 | |
| 3 | Rejected-Technical OLD KD COLONY BUKBUKKA KHALARI RANCHI DIST RANCHI JHARKHAND PIN 829205 | RANCHI | RANCHI | JHARKHAND | 829205 | - | Rejected-Technical Rejected as L-4 | |
| 4 | Rejected-Technical CAMP CAMP Q NO H 54 WARD NO 17 HALLOW BLOCK KOTMA COLLIERY DIST ANUPPUR MP | KOTMA | ANUPPUR | MADHYA PRADESH | - | Rejected-Technical Rejected as L-2 |
Tender Value
₹5.1 L
EMD Value
₹6,400
Closing Date
30 May 2022, 5:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
General manager(Oprn)
General Manager (Operaton SECL Sohagpur Area, PO- Dhanpuri, Distt- Shahdol (MP),Mobile No.- 942553414
Construction of 02 nos Air corssing in respect of Rajendra UG.of Sohagpur Area
2022_SECL_244137_1
SECL/SGP/ET/2223/578dt17/05/22
Open Tender
Civil Works - Others
Item Rate
180 days
Rajendra UG Mine of Sohagpur Area
As per NIT
8 documents required · 8 mandatory
₹6,400
22 Jun 2022
18 May 2022
1 Jun 2022
18 May 2022
30 May 2022
19 May 2022
18 May 2022 - 26 May 2022
Amount
Item Description/ Heading Part (A) labour Cost
As per item No.1 (a of GM’ SOR-2019 General cleaning/house- keeping not exceeding 5cm in depth Including disposal of cleaned muck/debris to be stacked uo-to 50m or to be leveled and neatly dressed 2 nos. X (5.00x 4.50) = 45.00 m2
As per item No.1 (d) of GM’ SOR-2019 Cleaning /removal of debries/stone from galleries and stacking within 50m distance. 2 ( 5.0m x 4.50 m x 2.25m) = 202.50m3 (In situ) Loose Material 202.50 x 1.45m3 = 146.81m3
Item No.21 of GM’SOR-2019: Roof support by roof bolting including drilling, bolting etc all complete. 35.00M x 4nos. = 140nos.
Item No.2(c) of GM’ SOR-2019: Grove cutting in soft stone (floor) - (1) For air crossing – In floor- 2 x 7.50m x 0.35m x 0.15m = 0.79m3 In roof – 2 x 4.80 m x 0.25m x0.15m = 0.36 m3 In sides – 4 x 1.30m x 0.25 m x 0.15m = 0.19 m3 Total = 1.34 m3 ( For 02 nos x 1.34 m3 = 2.68m3 )
Item No.2(a) of GM’ SOR-2019: Grove cutting in coal – (In sides) (1) For air crossing – 02 nos(4 x (2.30m x 0.35 m x 0.50m)) = 3.22 m3
BItem No.6 of GM’ SOR-2019: (i) Brick masonry work in u/g in cement mortar (1:6) in Foundation and height up to 1.5 m from floor. (a)Walling of air crossing 02 nos (2 sides (7.50m x 0.35m x1.65m )) = 17.32 m3
Item No.7 of GM’ SOR-2019: (ii) Brick masonry work in u/g in cement mortar (1:6) height from 1.5 m to 3.0 m and above. 2 nos. (2 x( 7.50m x 0.35m x0.80m)) = 08.40 m3 2 nos. (2 x (6.20m x 0.23m x1.45m )) = 08.27 m3 Total – 16.67 m3
Item No.04 of GM’ SOR-2019: RCC work in u/g including centering, shuttering, Reinforcement for RCC work, including cutting, bending, placing in position and binding shuttering etc all complete ratio of 1:2:4 (i) Roof slab of air crossing - 02 Nos. (5.20 m x 4.80m x 0.10m) = 4.99 m3
Item No. 08 of GM’ SOR-2019: 12 mm thick cement plaster along with making of Board (1:6) Air crossing : 2 nos (2 x (6.50 m x 2.30 m) = 59.80 m2 2.nos.(4 x (4.80 m x 1.30 m) = 49.92 m2 Total = 109.72m2
Item No. 15 of GM’ SOR-2019: White washing in underground with white lime to give an even shade on old work/new work Air crossing : 2 nos (2 x (6.50 m x 2.30 m) = 59.80 m2 2 Nos.(4.8x4.50) = 43.20 m2 2.nos.(4 x (4.80 m x 1.30 m) = 49.92 m2 Total = 152.92m2
Item No. 10 of GM’ SOR-2019: Loading of all kinds of building materials in to tub At Incline mouth (1) Stone chips – 04.44 m3 (2) Sand - 14.75 m3 (3) Cement - 02.87 m3 (4) Bricks - 33.99 m3 (5) Lime - 00.08 m3 (4) Steel rod (10 mm) - 00.05 m3 Total - 56.18 m3
Item No. 12 of GM’ SOR-2019: Unloading of all kinds of building materials in to tub At destination in u/g
Item No. 13 of GM’ SOR-2019: Extra lead to transport manually from unloading point to destination in UG 16.00 to 30.00m.
Item No. 11 of GM’ SOR-2019: Transportation of all kinds of building materials from surface to ug through haulages with with tramming & pushing, coupling & uncoupling with haulages for a distance every 1.0km 0r part thereof and bringing the empty tubs to surface Total Distance 1.70Km.
Part (B) Material Cost - Cement
Sand (Coarse grand)
Stone Chips
Steel rod
Bricks
Total impact of GST for the purpose of CTC
Ram Awadh Singh
ASHOK KUMAR MISHRA
NAGENDRA KUMAR SINGH
stage.html
html • 0.04 MB
techsummary_252201.pdf
PDF • 0.07 MB
finsummary_252201.pdf
PDF • 0.07 MB
AOC578.pdf
PDF • 0.22 MB
BOQ Comparative Chart
xlsx • 0.01 MB
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .