Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹23.8 LAccepted-AOC NA | PALWAL | HARYANA | 121004 | L1 | Accepted-AOC lowest | |
| 2 | L2₹24.3 L+₹53,784.40 (2.26%)Rejected-Finance | L2 | Rejected-Finance HIGH RATE BIDDER | |
| 3 | Rejected-Technical | - | Rejected-Technical TECHNICALLY UNFIT |
Tender Value
Refer Docs
EMD Value
₹56,000
Closing Date
24 Jan 2025, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
EE SNK 4 BAHRAICH
OFFICE OF THE EE SNK 4 BAHRAICH
Construction of D.R.B. cum fall at Km. 6.550 of Amaraha Minor.
2024_UPIDC_987816_3
07/EE/SNK-4/2024-25
Open Tender
Civil Works
Item Rate
60 days
BHINGA SHRAWASTI
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,354
₹56,000
18 Feb 2025
18 Jan 2025
24 Jan 2025
18 Jan 2025
24 Jan 2025
18 Jan 2025
Amount
E/W in digging foundation in all type of soil including all lead, lift and back filling and disposal of surplus earth for proper completion of work.
Laying Plain cement concrete in 1:3:6 in foundation with 20 to 40 mm size crushed kabrai stone ballast & Hamirpur Coarse sand having F.M. not less than 2.0 including all material labour & T&P etc. with manual compaction required for proper completion of work.
Ist class brick work in 1:4 C.M. With Hamirpur coarse sand of F.M. not less than 2.0 including cost of all material, labour and T&P etc. required for proper completion of work.
Centering & shuttering for C.C work in enclosed filter including cost of all material labour and T&P. etc. required for proper completion of work.
Centering & shuttering for R.C.C work upto 10 m span including all taxes, cost of all material labour and T&P. etc. required for proper completion of work.
Two coats of bitumen painting with two layers of tarfelt again followed by 2 coats of bitumen painting including all taxes, cost of all material, labour and T&P etc. required for proper completion of work.
Cutting, bending, binding & placing of Steel reinforcement in proper position including cost of all taxes, binding wire, steel labour and T&P. etc. required for proper completion of work.
S/F 20 mm thick Joint filler board in construction joint including all taxes, cost of all material, labour and T&P etc.required for proper completion of work.
Laying R.C.C. 1:1½ :3 using 4.75 mm to 20 mm size crushed Kabarai stone grit with Hamirpur coarse sand having F.M not less than 2.0 including all taxes, material, labour & T&P etc.
Cement Pointing (Struck deep) in 1:2 CM with Hamirpur fine coarse sand including cost of all material, labour & T&P. required for proper completion of work.
E/W in embackment making road diversion in all types of soil including all leads, lifts, royalty with proper dressing & manual compaction for proper completion of work.
E/W in embackment making ramp in all types of soil including all leads, lifts, royalty with proper dressing & manual compaction for proper completion of work.
S.O.B. Brick on edge soling on diversion/ramps including preperation of subgrade and filling joints with local sand including all taxes, cost of all labour and T&P. etc. required for proper completion of work.
Dismentling of SOB Brick on edge soling from diversion/ramps including all taxes, cost of all labour and T&P. etc. required for proper completion of work.
Relaying dismentled SOB Brick on edge soling from diversion/ramps including prepration of surface & filling joints with local sand including all taxes, cost of all material, labour and T&P etc. required for proper completion of work.
Dewatering with all cost of power, P.O.L., machines, pump, well point system and operator etc. with assembling and deassembling of machines etc. required for proper completion of work.
S/F Wheel guard stone including cost of all material, labour & T&P. by manufacturing at site including all taxes, cost of all material, labour and T&P etc.required for proper completion of work.
M/S RADHIKA CONSTRUCTION COMPANY (BID ID -4868298)
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .