Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹14.0 CrAccepted-AOC | L1 | Accepted-AOC L1 | |
| 2 | L2₹14.7 Cr+₹50.3 L (3.55%)Rejected-Finance | L2 | Rejected-Finance High Quoted | |
| 3 | L3₹14.7 Cr+₹53.6 L (3.78%)Rejected-Finance | L3 | Rejected-Finance High Quoted | |
| 4 | Not Admitted-Fee/PreQual/Technical 26 10B KRISHNAPURAM KADAIYANALLUR TENKASI TALUK TENKASI 627 759 | TENKASI | TAMIL NADU | 627759 | - | Not Admitted-Fee/PreQual/Technical EMD Not Furnished | |
| 5 | Not Admitted-Fee/PreQual/Technical 26 10 627 759 | TENKASI | TAMIL NADU | 627759 | - | Not Admitted-Fee/PreQual/Technical EMD Not Furnished |
Tender Value
₹14.0 Cr
EMD Value
₹7.1 L
Closing Date
21 Nov 2022, 2:00 pmClosed
Superintending Engineer
Office of the Superintending Engineer Highways C and M Tirunelveli AR Line Road Palayamkottai
Widening from Single Lane to Intermediate Lane Widening from Two Lane to End to End Strengthening Improvements to Riding Quality Construction of Minor Bridge Construction of Retaining Wall Ction of Breast Wall Construction of Dran including CD
2022_HWAY_257446_1
TN NO 09 2022 23 D1 Dated 11 10 2022
Open Tender
Civil Works - Highways
Percentage
270 days
Sankarankoil
Average Annual Turnover
Completed Contracts
Minimum quantities of works completed in one year during the last five years
Personnel capabilities
Equipment capabilities
Financial position
Audited baleet for the last five years
Litigation history
9 documents required · 9 mandatory
₹0
₹7.1 L
18 Apr 2023
19 Oct 2022
22 Nov 2022
19 Oct 2022
21 Nov 2022
28 Oct 2022
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Excavation for Roadway and Drainage. Excavation including removal and satisfactory disposal of all materials necessary for the construction of roadway and side drains in accordance with the specifications and the lines, grades and cross sections shown in the drawings or a sindicated by the Engineer as per SS20B for 97% Compaction for making up Berms MORTH Rev.V Clause No.111,112,301 to 305. a)Box Cutting for widening portion. | - | - | - | - |
| 2 | Road B | - | Cubic Metre | - | - |
| 3 | Road C | 1 | Cubic Metre | - | - |
| 4 | Road D | - | Cubic Metre | - | - |
| 5 | Road D (Paver Block) | - | Cubic Metre | - | - |
| 6 | Road E | - | Cubic Metre | - | - |
| 7 | Road F | - | Cubic Metre | - | - |
| 8 | Road G | 1 | Cubic Metre | - | - |
| 9 | Road H | - | Cubic Metre | - | - |
| 10 | Road J | 1 | Cubic Metre | - | - |
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
BOQ_304448.xls
BOQ Document • 0.77 MB
107322403.pdf
Tender Document • 0.08 MB
PQ_18.pdf
Tender Document • 0.42 MB
PB_18.pdf
Tender Document • 0.88 MB
107322405.html
Tender Document • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .