Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.9 LAccepted-AOC BHAROTA NIWAS SANGTI SANJAULI SHIMLA HP 171006 | SHIMLA | HIMACHAL PRADESH | 171006 | L1 | Accepted-AOC lowest rate quoted | |
| 2 | L2₹3.0 L+₹7,147.40 (2.44%)Rejected-Finance C O ZAMA MASZID GALI NO 3 MIDDLE BAZAR SHIMLA 171001 H P | SHIMLA | HIMACHAL PRADESH | 171001 | L2 | Rejected-Finance Highest rate quoted | |
| 3 | L3₹3.0 L+₹10,106.36 (3.45%)Rejected-Finance | L3 | Rejected-Finance Highest rate quoted |
Tender Value
Refer Docs
EMD Value
₹7,147
Closing Date
13 Feb 2024, 1:00 pmClosed
Er.Pratap Singh
ED No. 1 Kasumpti Shimla 171009
Estimate for Shifting of 11kV Overhead kasumpti HT line and 2x630 SDA Complex LT line (3 feeder) behind SBI Bank in SDA Complex due to constuction of Civil work WS and SI Rain Harvesting tank under smart city and shifting of Double Pole structure wit
2024_HPSEB_85198_1
SED/SP- Tender No-89/2023-24
Limited
Electrical Works
Percentage
90 days
Khallini
Please refer Tender documents.
3 documents required · 3 mandatory
₹590
₹7,147
4 Mar 2024
5 Feb 2024
14 Feb 2024
5 Feb 2024
13 Feb 2024
5 Feb 2024
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_126757.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .