Loading…
India Infra Updates on WhatsApp
Join the Tenderkart WhatsApp channel for India Infra Updates
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Admitted-Finance | Admitted-Finance |
| 3 | Admitted-Finance 441 190 A SIDDIQUI HOUSE MALAPURAM COLONY JAL NIGAM ROAD BALAGANJ LUCKNOW UTTAR PRADESH 226003 | LUCKNOW | UTTAR PRADESH | 226003 | Admitted-Finance |
Tender Value
₹35.3 L
EMD Value
₹35,295
Closing Date
16 Apr 2024, 12:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
SE EWCL
MVVNL, TIPE IV/3, TRANSMISSION STAF COLONY, DEVA ROAD, CHINHAT, Lucknow
CONSTRUCTION WORK OF NEW 33 11 KV 1X5 MVA SS UCCHAULIYA IN EDC GOLA AT DISTRICT LAKHIMPUR UNDER BUSINESS PLAN 2024-25
2024_MVVNL_921837_1
106/EWCL/2023-24
Open Tender
Electrical Works
Item Wise
90 days
LAKHIMPUR
AS PER PQR OF DOC
2 documents required · 2 mandatory
₹3,540
SE EWCL
₹35,295
13 Jun 2024
9 Apr 2024
16 Apr 2024
9 Apr 2024
16 Apr 2024
9 Apr 2024
Amount
Dragging, loading, carriage and unloading of following store material with proper stacking from any ESC of Lucknow Zone to JE's Dump Store/Store to work Site.
Cost of 33 KV line Isolator
Cost of 33 KV Bus Isolator
Cost of Post Insulator
Cost of 33 KV Lightening Arrester
Cost of 33/11 KV 05 MVA Transformer
Cost of 33 KV VCB 800 Amp., 750 MVA
Cost of 33 KV CT 400/200/1 Amp.
Cost of 33 KV CT 200/100/1 Amp.
Cost of 33 KV Single T/F Control Pannel with structure.
Cost of 33 KV Single Feeder control pannel
600/300/5 AMP, 350 MVA Incoming
200/100/5 AMP, 350 MVA Outgoing
11 KV 3x300 SQ MM XLPE
11 KV 3x185 SQ MM XLPE
R.S. Joist 100x116mm 8.23Mtr. Long 4 No Pieces 32.92m @ 23.00 Kg./Mtr.+wastage. for T.G.
R.S. Joist 150x150mm 6.4 Mtr. Long 4 No Pieces Total 25.6 Mtr. @ 37 kg/M+wastage for Bus Bar Gantry
MS Channel 125x65, 3.2Mtr. Long 1,2,3,4 No Pieces for Top channel. 13.10 Kg/Mtr.+wastage.
MS Angles 50x50x6mm for bracing type members of T.G./B.G./Trench
MS Angles 75x75x8, 2.6mtr long, total 5.2 @ 8.9 Kg/Mtr.
MS Angles 75x75x6mm (6.8 Kg/Mtr.) for Neutral/Cable Stand
MS Round of 32 mm dia for earthmat (6.1 Kg/Mtr.)
ACSR Dog conductor for jumpers
ACSR Panther conductor for Bus bar
Cost of ACSR Panther Conductor
11KV Polymeric Disc Insulator B&S 7000 Kg
33 KV Disc fitting for Dog/Panther conductor
33 KV Polymeric Pin Insulator With Nut & Washer
PCC Pole 8.5m long.
LT ABC conductor (3x50+1x35+1x16)
Rail Pcs of 90 Lbs 3.46M long 2 No. Pcs 6.92M @ 44.61 Kg./M
MS Channel 100x50 mm (9.6 Kg/Mtr.) for Cable Stand
MS Channel 100x50x2028 mm (Dropper for Fuse Set)
MS Channel 100x50x2240m Top Channel
MS Channel 125x65x2240mm (Top)
MS Angle 40x40x5 mm (3.0 Kg/Mtr)
11 KV Polymeric Disc Insulator T & C type 4500 Kg.
11 KV Disc fitting T & C type 4500 Kg.
MS Channel 125x65x1300mm Tee Off
11 KV Polymeric Pin Insulator
11/0.4 KV, 63 KVA Transformer
MS Channel 100x50x2028m for TPMO
MS Angle 75x75x6mm 2028 mm with clamp ,bolt & nut (TF base)
Earthing of pole by MS Earthing rod 20x2500 mm & 6 SWG earthing wire etc Complete
11 KV XLPE cable 3x70mm
MS Angle 65x65x6mm 2028 mm Mtr long for cable hoisting support
Stay Complete
Plinth of 5MVA 33/11KV T/F: Construction of plinth of size 3.46 x4.46 Mtr. For 5MVA T/F having 0.4 Mtr. above ground level. The work includes excavation of foundation, base concretion of CC 1:4:8 ratio (cement, fine sand & brick ballast) first class brick work in cement morter of rtio1:4 foundation CC in 1:4:8 ratio(cement, find sand & brick ballast) and RCC work in ratio 1:2:4 (cement, coarse sand and stone grit of 20mm gauge using MS bar of 10mm dia(tor) in reinforcement including its cutting, bending & binding in required shape. The work also includes laying of 2 No. 3.46 mtr. long rail pieces complete with cutting, welding & proper fitting etc. The plinth will be made as per drawing and shall be plastered/ finished on top and sides of the plinth.
Fabrication, Errection & Grouting of Substation Structure:
Isolator Structure: Fabrication of Isolator Structure 3.5 mtr in height as per Drg. digging of two no. pits of size 1.075x0.9x0.3 mtr. providing Stone Pad at the bottom of the pit and grouting of two legs of the isolator structure in CC(cement coarse sand and stone grit of 20mm gauge) of the ratio 1:4:8 in block of 1.075x0.3 mtr. including all civil material, T&P complete in all respect. The work includes dragging, shifting up to 40 Mtr., raising and erecting the two legs with runner on proper alignment and level and plumb. Both plinths of the isolator structure shall be properly finished with smoothing of edges.
Lightening Arrestor, P.I. & CT Structure : Fabrication of Lightening Arrestor, P.I. & CT Structure 3.5 mtr. in height as per Drg. digging of two no pits of size 1.075x0.9x0.3 mtr. providing stone pad at the bottom of the pit and grouting of two legs of the Structure in CC(cement coarse sand and stone grit of 20mm gauge) of the ratio 1:4:8 in block of 1.075x0.3 mtr. including all civil material, T&P complete in all respect. The work includes dragging, shifting up to 40 Mtr., raising and erecting the two legs with runner on proper alignment and level and plumb. Both plinths of the structure shall be properly finished with smoothing of edges.
Plinth of VCB : Construction of Plinth of size 2.0 mtrx1.5mtrx0.9mtr. suitable for erection of upper structure of 33KV VCB including grouting of anchor bolts in proper alignment and level. Scope of work includes excavation of foundation base concreting in CC 1:3:6 (cement, find sand & brick ballast) 1st class brick work in cement mortor ratio 1:4:8 (cement, coarse sand and stone grit of 20mm gauge).
Erection and installation of 33/11KV 05 MVA T/F
Erection and installation of 33/11KV 05 MVA T/F in a levelled position of the plinth. The work includes shifting of T/F to the site & installation within the S/S premises, assembling, fixing and fitting of all accessories and filling of T/F oil to the desired level and ensuring that there is no leakage. All jumpering & connection are included in the scope of work.
Earthing for power T/F by way of boaring and lowering of 40mm dia, 2.9 mm thick GI Pipe from ground upto the water level (minimum 60 feet deep) as per standard practice as per REC Drg.
Fabrication and grouting (1:4:8) of MS Channel 100x50mm in L Shape & in proper size and alignment to provide support for the two separate earthing strips (50x6)mm size for power transformer neutral including supply & fixing of two no. flexible copper bonds for neutral earthing as per Drg.
Fabrication and erection of cable support made of two pieces of MS channel 100x50mm, 3.0 mtr. long joined to each other by means of 5 no. MS Fat 50x6mm pieces of size 150mm long each by welding at equal intervals as per drawing and grouting in block of size 300x300x700mm (1:4:8) complete with one coat of ready mixed primer and two coats of Al. Paint. This includes providing of four no. MS Clamp made of MS Flat holding the cable including nuts & bolts and fixing of XLPE cable.
Installation of Isolators: Assembling and installation of line/ bus isolator on the isolator structure adjusting of opening mechanis in proper alignment so as to ensure smooth operation of the same. In case of line isolator proper operation of earth links shall also be ensured. The work includes fabrication & proper connection with earthmat by G.I. erth strip 50x6mm for proper flexing if required.
Installation of P.I. & Lightening Arrestors : Assembling, installation & mounting of 3 No.(1set) L.A. & Post insulator on the L.A & P.I. Structure/complete with making earth connections (separate) and line connections. The work includes fabrication for fixing if required.
Installation of CT: Installation of 3 No.(1 set) CT on the CT Structure along with CT Junction Box. The work includes fabrication for proper fixing of C.T. If required and proper commissioning & testing.
Installation of VCB: Installation of 33KV VCB complete work including commissioning & testing.
Installation of Switchgears in Control Room:
Shifting carefully & installation safely 11KV I/C & O/G switchgears from outside the switchgear room placing and fixing of switchgear on foundation providing G.I. Bolt & Nuts of proper size in proper position and alignment and checking, complete work with mounting of P.T. on incoming S/G with proper testing & commissioning of switchgears.
Fixing and making Bus Bar connections in between all switchgears after cleaning and tapping with H.T. Tape, empire tape and PVC tape properly, providing and fixing of 6 mm thick Bakelite separators and plugging of all opening & holes with plastic compound complete work as per satisfaction of site incharge.
Shifting carefully and installation of 33KV Single Transformer Control Panel in Control Room including fixing, bolting & grouting of above as per requared and testing, commisioning satisfaction of site incharge.
Earthing of 11 KV, 33 KV Switchgears & Equipment: Earthing of 11 KV, 33 KV Switchgears equpiment by lowaring and boring of Chemical Earting outsite of switchyard and connecting through G.I. Strip 50x6mm with indoor/outdoor equipments. (All the matrial provided by the contrertor)
HT Cable Laying :
Laying & dressing of 11KV 3x300 Sq.mm U/G cable from 5MVA T/F to 11KV incoming Switchgear by excavation of earth in the trench 450mm wide, 900mm deep providing 150mm fine sand cushion below the cable. The cable shall be duly protected by bricks, sand & stone slab and refilling & ramming of the left out soil. Spare cable shall be left and buried in the trench in the shape of rings at both ends. Cable laying work includes unrolling, cutting, making ring and sealing both ends of the cable. (All the matrical provided by the contrector Expect Cable).
Layng & dressing of 11KV 3x120 Sq.mm U/G cable from 5MVA T/F to 11KV incoming Switchgear by excavation of earth in the trench 450mm wide, 900mm deep providing 150mm fine sand cushion below & above the cable. The cable shall be duly protected by bricks, sand & stone slab and refilling & ramming of the left out soil. Spare cable shall be left and buried in the trench in the shape of rings at both ends. Cable laying work includes unrolling, cutting, making ring and sealing both ends of the cable.(All the matrical provided by the contrector Expect Cable).
Supply & Fixing of 11KV Cable Ends:
Hoisting of 11KV Cable with 100 mm dia 3 Mtr. long GI Pipe on the feeder cable before mounting the cable on the double pole, lifting, mounting and clamping of 11KV feeder cable boxes on the feeder double pole structure and making connection including supply of cable mounting clamps. The work includes the sealing of GI Pipes, lower end of the pipe is to be buried into the earth by about one foot. (All the matrical provided by the contractor).
Hoisting of 11KV Cable for 11 KV switchgears & 33/11KV T/F.
Making vertical/horizontal jumper connections using Panther/Dog Conductor with existing busbar gantry through PG Clamps and connecting all equipments with each other through connecting clamps. The work includes all the jumpes from busbar to T/F (1no. T/F bay)
Construction of Cable trench of size 300x300mm including brick work 1:4 in wall of the trench, brick ballast work in 1:5:10 on foundation plaster 12mm thick with coarse sand 1:4 and surface finishing with cement, providing MS Strip at an interval of 0.5 Mt. and MS Angle (25x25x5mm) running on both the edges of trench.
Construction of welded frame type control cable trench cover 0.5 Mt. long suitable for trench including cost of MS/Tor Bar.
Construction of Toe wall around the outdoor Switchyard of the S/s of size 0.75 Mt.At Base and 0.23 Mt. At top as per RESSPO Norms by lst class bricks in the ratio 1:6, Base concreting of the wall to be done in ratio 1:6:12 and plaster 12 mm thick in ratio 1:4.(All materials to be provided by Contractor).
Fabrication of switchyard fencing with wire chain link fencing mesh D fensing of as per drawing along with Fabrication of one number gate made of MS Angle, MS Channel, MS Flat together with locking arrangement, its Installation including the cost of civil material, angle 50x50x6mm.(All materials to be provided by Contractor).
EARTH MAT Laying of earth mat in the switchyard by laying of M.S. Round of 32 mm dia in 500 mm deep trenches with M.S. Round 32mm dia,3Mtr. Long earth electrodes as per drawing. The work includes welding of the M.S. Round, connecting all steel structures in the switchyard with the earth mat by means of G.I. strips of size 50x6mm as per item below. (M.S. Round bar 32mm provided by Department )
Excavation of earth for laying mat
Driving of earth electrode.
Laying of earthmat (M.S.) Bar including cutting, shaping and binding etc)
Preparation of joints, proper making and welding; of main earthmat bar joints and applying, bitumen impregnated Paint on joints i.e. End Joints. Cross Joints, Lap Joints.
Welding of riser strip with earthmat and department structure body (One set means one riser strip welding to main equipments).
33 K.V. SECTIONAL BUS BAR AND STRINGING : Stringing of 33KV bus bar using of ACSR Panther Conductor including fixing of Disc insulators. Strings and tension fitting complete with sagging of bus bar etc. and making vertical/Horizontal jumper connection through PG Clamps and connecting all the equipments with each other through connecting clamps. Work includes all the jump ring from terminal gantry to bus bar and from bus bar to transformer (1no. T/f bay's)
Double Support for 63 KVA Transformer on 8.5 mtr PCC Pole with complete all accessories.(11 KV TPMO, 11 KV Fuse set with clamps to be provided by Contractor)
Erection of 63 KVA Transformer on Double pole support with clamps nut ,Bolts etc and proper testing and commissing. (All decentralised materials to be provided by Contractor).
STATION SWITCHYARD LIGHTENING
Erection of 8.5 Mtr.PCC Pole after excavation of earth in any type of soil and grouting of CC in ratio 1:4:8 (cement coarse sand & brick ballast) as per RESSPO Drg. With plinth.(All decentralised materials to be provided by Contractor).
Fixing & supply of 40 watt. LED street light complete fitting and of standard quality ISI markwith water light fittings, elbow etc. complete in all respect and suitable for above supports.(All materials to be provided by Contractor).
Supply & Laying of 3.5 x 70/35 Sq.mm PVC LT cable from 11/.04 kv,63KVA T/F to LT Distribution Board in switchgear room after digging the trench, laying cable and refilling of trench including connection at both ends after providing and crimpling of lugs of proper size, complete work.(All materials to be provided by Contractor).
Supply and laying of 2x6 sq. mm. aluminum cable from S.G. room to street light supports after digging of trench, laying of cable, providing a brick on top of cable , refilling of trench, making connections at poles with street light fittings, complete in all respect.(All materials to be provided by Contractor).
Soil filling of yard
Cost of Yard Leveling and Brick of Edge Bar
Providing of fire buckets stand ( Hut Type) made of M.S. Angle 50x50x6mm as per drawing with fabrication and grouting and painting by post office red paint and letter writing etc. complete including the cost of fire bucket-6 Nos. in the switch yard of the sub-station filled with Ganga sand.
Supply and laying of following size Armoured Copper Control Cable through underground/cable trench/trenching SGR interlinking through proper connections to T/F Control panel/protection board/Battery and Battery Charger/Bunch joints, Relay 33/11KV T/F junction Box/33KV VCB, CTs etc. as per site conditions: (All the matrical provided by the contrector).
Cable Tray
4x2.5 Sq.mm
6x2.5 Sq.mm
2x2.5 Sq. mm
Painting of all structures and equipments.
(a) Excavation of foundation pit in mix soil/normal soil, soft & hard rack and its back filling and levelling etc. The size of the pit will be 800x900 mm and having a depth of 1/6 of the full length of the support. Erection of supports by providing stone pad, fixing all clamps and other accessories such as No. Plate, Danger Board, Barbed Wire (2Kg.), Painting etc. as per relevant RESPO/ RES. drawing . This includes any fabrication, if required. (b) Grouting of above supports with cement, concrete (CC will be of cement coarse sand & brick ballast) Grouting will be done with the help of wooden/steel formers in a block of size 450 mm x 450 mm x 1/6 of the full length of the support in the CC 1:4:8 ratio as per RESPO/ RES. drawing including back filling and proper ramming. (c) Making of plinth of STP 300 mm, dia & 300 mm above ground level in CC of 1:4:8 & plastering of the same with 12 mm thick plaster of cement & sand in 1:4 ratio. (d) Earthing of supports with Earth Electrode 2.5 mtr. length including excavation of pit and driving M.S. Rod upto proper depth and connecting the earth electrode with the help of 8 SWG G.I. Wire and earthing lugs. RESPO/ RES. drawing.
For Outgoing Double Support 8.5 Mtr. PCC :
(a) Grouting of stay rods 1800x16 mm including all works of excavation grouting by , cement concrete in size 0.60x0.60x0.3 mtr. with ratio 1:4:8 as per relevant drawing including back filling of earth and proper ramming. Stay Insulator will be provided by Contractor. (b) Fixing, tightening & nuzzling of stay with the poles and required tension as per RESPO/ RES. drawing.
Repairing ,Overhauling and Centrifusing of T/F Oil of Old & Used 5 MVA Power T/F .Change OTI & WTI of Power T/F if Required.(OTI&WTI Be Provided By the Contractor.)
Supply and Fixing of 24 Volt Battery With Charger
Fixing of Single Core PVC Cable, 1x240/400/630 sq.mm. & fixing between Transformer incoming 3x300 Sq.mm XLPE Cable and Transformer 11 KV/LV Side Bushing connector for reducing of tension at LV Side Bushing.
Supply and fixing of Rubber mat 8/10mm, 2x4mtr.
RAJ ENTERPRISES
SINLESS ELECRICAL CO. PVT. LTD.
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .