| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.6 LAccepted-Finance | ₹1.6 L | L1 | Accepted-Finance Responsive |
| 2 | L2₹1.7 L+₹4,354 (2.67%)Accepted-Finance | ₹1.7 L+₹4,354 (2.67%) | L2 | Accepted-Finance Responsive |
| 3 | L3₹1.7 L+₹7,775 (4.76%)Accepted-Finance | ₹1.7 L+₹7,775 (4.76%) | L3 | Accepted-Finance Responsive |
| 4 | L4₹1.8 L+₹15,394.50 (9.43%)Accepted-Finance | ₹1.8 L+₹15,394.50 (9.43%) | L4 | Accepted-Finance Responsive |
Tender Value
₹2.7 L
EMD Value
₹5,354
Closing Date
9 Jan 2023, 3:00 pmClosed
EE PBSD APWD Port Blair
EE PBSD APWD Port Blair
Upkeep and Maintenance of Raj Niwas Sub work Polishing existing timber flooring, doors, windows and furniture of Raj Niwas as and when required. Sub Head Polishing timber flooring, doors, windows, and furniture of Raj Niwas for the upcoming VVIP
2023_APWD_8780_1
NIT No.126/EE/PBSD/2022-23
Open Tender
Civil Works - Others
Works
10 days
Raj Niwas Port Blair
Please refer Tender documents.
4 documents required · 4 mandatory
₹0
₹5,354
17 Jan 2023
4 Jan 2023
9 Jan 2023
4 Jan 2023
9 Jan 2023
4 Jan 2023
Amount
Polishing in high gloss/matt finish melamine clear polish on wood work in required color/wooden shade texture with following process in the sequence as detailed below: 1. The surface to be polished is rubbed with sand paper 80/ 120 no. and then with sand paper of 160/180 nos. 2. Applying two coats of sealer with spray gun and allowing sufficient drying time for 1st coat and 2nd coat is allowed to dry for 8 to 12 hrs. 3. On drying of sealer coat, wet rubbing with emery cloth of finer grading with ample water to remove excess sealer layer and make the surface further smooth after this wet rubbing, then surface is applied with special grade melamine fillers to fill all the small and big holes/grooves etc. Filler coat to be allowed to dry for 4 to 6 hrs on which again a light wet rubbing is done this surface is further allowed to dry for 12 hrs. 4. On this, 1st coat of melamine polish is applied with spray gun using melamine clear polish and melamine thinner in required proportion. This 1st coat is allowed to dry for 24 hrs then this dry surface is again fine wet rubbed smooth, which is further allowed to dry for 12 hrs. The final melamine polish is applied with compressor pressure spray gun using melamine clear polish and melamine thinner mixed in required proportion complete as per direction of Engineer-in-Charge. (Final coat to be done in 1 or 2 layers without gap of time.)
RAKESH CHANDER NATH
ANAND TRADERS AND CONSTRUCTION
M/s BRO s
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .