| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹8.3 LAccepted-Finance | ₹8.3 L | L1 | Accepted-Finance LESS |
| 2 | L2₹8.4 L+₹11,371.75 (1.37%)Rejected-Finance | ₹8.4 L+₹11,371.75 (1.37%) | L2 | Rejected-Finance MORE |
| Sl No | Description | Qty | Unit | S V Constructions L1 | Mahesh Constructions L2 |
|---|---|---|---|---|---|
| 1.00 | Picking of existing B.T road complete direction as per the departmental officers | 665 | m3 | 90 ₹59,850 Lowest | 95 ₹63,175 |
| 2.00 | Providing and laying WBM 75MM Compacted thicness with Grade III metal Using1M3 of 53mm to 26.50mm IRC METAL as Top layers with 0.24 cum of gravel for blindage per 10 sqm including cost and conveyance of all materials and stocking them at the site to departmental gauge for premeasurement including labour charges for spreading metal and hand packing to camber watering with all leads for water and compacting by 80-100 KN Power roller including hire & fuel charges for water sprinkler and full other tools and plants etc., complete as per MOST Specifications.II nd layer.. | 110.1 | m3 | 2,735 ₹3,01,123.5 Lowest | 2,740 ₹3,01,674 |
| 3.00 | Tack Coat using bulk bitumen of grade 80/100 with 4Kg includind all labour and material charges completed as per standard specifications | 1,468 | m2 | 63 ₹92,484 Lowest | 65 ₹95,420 |
| 4.00 | Tack Coat using bulk bitumen of grade 80/100 with 2Kg over BT includind all labour and material charges completed as per standard specifications | 31.25 | m2 | 23 ₹718.75 Lowest | 25 ₹781.25 |
| 5.00 | Providing and laying premix carpet with seal coat type 'A' 20mm consolidated thickness using IRC size machine broken HG metal 0.18 cum of 13.20mm and 0.09 cum of 11.20mm with 14.60 kg of 80/100 grade Bitumen for premixing for 10 sq.m of premix carpet and 0.09 cum of 6.70mm IRC size HBG metal with 9.80 kg of 80/100 grade bitumen for 10 sq.m for seal coat including cost and conveyance of all materials from approved quarry to work site and stacking them to departmental gauge for pre measurements including cost of bitumen which will be procured by the contractor at his own cost including conveyance of bitumen to work spot, handling charges for the same at both ends including heating the bitumen boiler, heating the aggregates and mixing them with Bitumen in mini hot mix plant for premix carpet rolling by power roller for premix carpets and sealcoat separately including labour charges for spreading the mix for premix carpet application bitumen for seal coat over the premix carpet including labour charges for spreading the seal coat including hire charges and running charges for mini hot mix plant power roller and all other tools and plants employed all indicated charges such as barricading, providing danger lights etc., complete complying with standards specifications as per MOST 509, 513. | 1,499.25 | m2 | 252 ₹3,77,811 Lowest | 255 ₹3,82,308.75 |
| 6.00Add :- GST @ 18% | |||||
Tender Value
₹10 L
EMD Value
₹10,000
Closing Date
14 Dec 2023, 3:00 pmClosed
Assistant Commisssioner, East Zone
East Zone, Coimbatore Corporation
Restoration of BT surface at Janagiammal layout in ward no 7
2023_MAWS_397973_6
E9/EASTZONE/2023
Open Tender
Civil Works
Works
90 days
East Zone, Coimbatore Corporation
As per the tender conditions attached
3 documents required · 3 mandatory
₹0
₹10,000
11 May 2026
11 Dec 2023
15 Dec 2023
11 Dec 2023
14 Dec 2023
11 Dec 2023
Amount
Picking of existing B.T road complete direction as per the departmental officers
Providing and laying WBM 75MM Compacted thicness with Grade III metal Using1M3 of 53mm to 26.50mm IRC METAL as Top layers with 0.24 cum of gravel for blindage per 10 sqm including cost and conveyance of all materials and stocking them at the site to departmental gauge for premeasurement including labour charges for spreading metal and hand packing to camber watering with all leads for water and compacting by 80-100 KN Power roller including hire & fuel charges for water sprinkler and full other tools and plants etc., complete as per MOST Specifications.II nd layer..
Tack Coat using bulk bitumen of grade 80/100 with 4Kg includind all labour and material charges completed as per standard specifications
Tack Coat using bulk bitumen of grade 80/100 with 2Kg over BT includind all labour and material charges completed as per standard specifications
Providing and laying premix carpet with seal coat type 'A' 20mm consolidated thickness using IRC size machine broken HG metal 0.18 cum of 13.20mm and 0.09 cum of 11.20mm with 14.60 kg of 80/100 grade Bitumen for premixing for 10 sq.m of premix carpet and 0.09 cum of 6.70mm IRC size HBG metal with 9.80 kg of 80/100 grade bitumen for 10 sq.m for seal coat including cost and conveyance of all materials from approved quarry to work site and stacking them to departmental gauge for pre measurements including cost of bitumen which will be procured by the contractor at his own cost including conveyance of bitumen to work spot, handling charges for the same at both ends including heating the bitumen boiler, heating the aggregates and mixing them with Bitumen in mini hot mix plant for premix carpet rolling by power roller for premix carpets and sealcoat separately including labour charges for spreading the mix for premix carpet application bitumen for seal coat over the premix carpet including labour charges for spreading the seal coat including hire charges and running charges for mini hot mix plant power roller and all other tools and plants employed all indicated charges such as barricading, providing danger lights etc., complete complying with standards specifications as per MOST 509, 513.
Add :- GST @ 18%
Mahesh Constructions
stage.html
html • 0.03 MB
tech_eval.pdf
fin_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.44 MB
ITB.pdf
Additional Documents • 0.06 MB
BOQ_473870.xls
BOQ • 0.27 MB
ez-e9-Roads.pdf
Tender Documents • 0.72 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .