Loading…
Loading…
Tender Value
₹11.7 L
EMD Value
₹23,304
Closing Date
17 Sept 2026, 1:30 pm5d left
Divisional Forest Officer Social Forestry Kupwara
OFFICE OF THE ASSISTANT CONSERVATOR OF FORESTS SOIL AND WATER CONSERVATION DEPARTMENT DISTRICT KUPWARA HQ HANDWARA
Upgradation of pond at Gulgam
2026_SWCD_324216_2
e-NIT No-02 of 2026-27 dated 09/09/2026
Open Tender
Civil Works
Item Wise
30 days
Gulgam
Please refer Tender documents.
2 documents required · 2 mandatory
₹200
Yes
Pooling Account No.0110010200001106
₹23,304
Yes
Office of the Joint Director, Soil and Water Conse
10 Sept 2026
10 Sept 2026
18 Sept 2026
10 Sept 2026
17 Sept 2026
10 Sept 2026
15 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Upgradation of 03 No of ponds at Wyan Gulgam Earthwork in bulk excavation by mechanical means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m square on plan) including disposal of excavated earth within a lead of 50 m including all lifts and neatly dressed. All kinds of soil: ALL KINDS OF SOIL (90%) Pond 1: 1 (3.14 x 50 x 50 x 2) =15700 Cft Pond 2: 1(110 x 35 x 2.5) = 9625 Cft Pond 3: (excavation) 1(3.14 x 75 x 75 x 2) = 35325 Cft Total:- = 60650 Cft or 1717.6 Cum | |||||
| 1.01 | All kind of soil 90% = 1545.90 Cum | 1,545.9 | Cum | 187.3 | ₹2,89,547.07 |
| 1.02 | Ordenary Rock 10% = 171.80 Cum | 171.8 | Cum | 392.8 | ₹67,483.04 |
| 2 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift up to 1.5 m. Pond 1: 0.5 (3.14x100x6x2) =1884 Cft Pond 2: 0,5 (x290x6x2 ) = 1740 Cft Total: = 3624 Cft or 102.63 Cum | 102.63 | Cum | 218.4 | ₹22,414.39 |
| 3 | Pumping out water caused by springs, tidal or river seepage, broken water mains or drains and the like. 2 (3.14x11.8x11.6x0.2) = 174.9 Cum/KL | 174.9 | KL | 167.8 | ₹29,348.22 |
| 4 | P/L Stone Soling (90-45) hand packed soling including all carriages. Ramp: 2(10x5x0.33) = 33 Cft Pond 1: 1(3.14x100x3x0.33) = 310.86 Cft Pond 2: 1(290x3x0.33) = 287.1 Cft Total: 630.96 Cft or 17.9 Cum | 17.9 | Cum | 1,000 | ₹17,900 |
| 5 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering. All works up to plinth level in 1:4:8 mix (1 cement : 4 coarse sand : 8 graded stone aggregate 40mm nominal size crushed), including curing but excluding the cost of centering and shuttering. Ramp: 2(10x5x0.25)= 25 Cft Pond 1: 1(3.14x100x3x0.25) = 235.5 Cft Pond 2: 1(290x3x0.25) = 217.5 Cft Total: = 478 Cft or 13.5 Cum | 13.5 | Cum | 5,202.9 | ₹70,239.15 |
| 6 | Providing and laying in position cement concrete 1:2:4 grade (1 cement : 2 coarse sand : 4 graded stone aggregate 20mm nominal size) of specified grade excluding the cost of centering and shuttering, all works up to plinth. Ramp: 2(0.5x10x5x2) =100 Cft or 2.83 Cum | 2.83 | Cum | 6,591.25 | ₹18,653.24 |
| 7Random Rubble masonry (split) / quarry stone with hard stone in foundation and plinth including leveling up with cement concrete 1:6:12 (1 cement : 6 coarse sand : 12 graded stone aggregate 20mm nominal size) up to plinth level and curing complete job: In Cement Mortar Pond 1: 1(3.14x100x2.5x3) = 2355cft Pond 2: 1(290x2.5x3) 2175 Cft Total:4530 Cft or 128Cum | |||||
| 7.01 | in Cement Moter: 0.3 x 28 = 38.5 Cum | 38.5 | cum | 5,402.9 | ₹2,08,011.65 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.41 MB
BOQ_1093349.xls
BOQ • 0.35 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .