| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹22.7 LAccepted-AOC GANGA NIWAS BELLOW UTTAN GAS AGENCY BCS NEW SHIMLA 171011 | SHIMLA | SHIMLA | HIMACHAL PRADESH | 171011 | L1 | Accepted-AOC Awarded | |
| 2 | L2₹23.5 L+₹80,251 (3.54%)Rejected-Finance | L2 | Rejected-Finance 2nd Lowest | |
| 3 | L3₹24.6 L+₹1.9 L (8.40%)Rejected-Finance | L3 | Rejected-Finance 3rd Lowest | |
| 4 | L4₹24.8 L+₹2.1 L (9.22%)Rejected-Finance | L4 | Rejected-Finance 4th Lowest | |
| 5 | L5₹25.3 L+₹2.7 L (11.7%)Rejected-Finance MANDI HIMACHAL PRADESH | L5 | Rejected-Finance 5th Lowest |
Tender Value
Refer Docs
EMD Value
₹36,800
Closing Date
27 Jan 2021, 4:00 pmClosed
Executive Engineer Division No-IHPPWD Shimla-3
Executive Engineer Division No-IHPPWD Shimla-3
Construction of Parking and pakka path in Type-III and IV Qtrs at Kasumpti Shimla-9 (SH C/O parking for residence of type III set No 49 to 64 at Brock Hurst Shimla
2021_PWD_43634_2
SD-I-CTR-2020-21- 19359 dated 31-12-2020
Open Tender
Civil Works
Item Rate
90 days
Shimla
As per SBD
12 documents required · 12 mandatory
₹500
₹36,800
23 Mar 2021
12 Jan 2021
28 Jan 2021
12 Jan 2021
27 Jan 2021
12 Jan 2021
Amount
Cutting in earth work in by mechanical in all heights and depths in all kinds of soils, including saturated soils comprising of pick work, jumper work and blasting work both in soft and hard rock with chiseling and wedging out of rock (where blasting is prohibited) and their intermediate classification of soils including, dewatering wherever required, setting of to the required lines, levels as shown on the drawing and directed by the Engineer -in-charge at site., according to the HP.PWD. specification of 1990 (one thousand nine hundred ninety) volume-I (one) and sorting out useful and unuseful material and transportation of the unuseful material for disposing at dumping site (To be arranged by the contractor) as per satisfaction of Engineer- in -charge through all modes of transportation including head load ,animal load or mechanical means along with its leveling fine dressing and with all kinds of labour, machineries, tools equipments and safety measures and incidentals necessary to complete the work by mechanical means and labour ( if required ). All useful material such as stones, shingles aggregate and slates shall be properly stacked at site to the maximum possible extent in all leads and lifts through all modes of transportation as per the directions of the Engineer-in-Charge. Any loss to the public and private propriety during the course of execution and disposal of serviceable and unserviceable materials shall be the absolute responsibility of the contractor and shall have to be duly compensated by him in all respects including all incidental charges.
Excavation in foundation trenches in all heights and depths in all kinds of soil including saturated soils comprising of pick work, jumper work and blasting work both in soft and hard rock with chiseling wedging out of rock (where blasting is prohibited) and their intermediate classification of soil including, dewatering wherever required, setting out to required lines, levels as shown on the drawing and directed by the Engineer -in-Charge at site. according to the HP.PWD. specification of 1990 (one thousand nine hundred ninety) volume-I (one) and sorting out useful and un- useful material and transportation of the un -useful material for disposing at dumping site (to be arranged by the contractor) including payment of prescribed charges of dumping to be borne by the contractor to the satisfaction of Engineer- in -Charge through all modes of transportation including head load, animal load or mechanical means along with its leveling fine dressing and with all kinds of labour ,machineries, tools equipments and safety measures and incidentals necessary to complete the work by mechanical means and labour ( if required ). All useful material such as stones , shingles aggregate and slates shall be properly stacked at site and handed over to the department free of cost to the maximum possible extent in all leads and lifts through all modes of transportation and used/removed as per the direction of Engineer-in-Charge. serviceable stones to be handed over to the department free of cost. Any loss to the public and private property during the course of execution and disposal of serviceable and unserviceable materials shall be the absolute responsibility of the contractor and shall have to be duly compensated by him in all respects including all incidental charges.
Providing form work with steel plates (3.15mm) (three point fifteen milimetre) thick welded with angle iron in frame (30x30x5mm) ( Thirty x thirty x 5 milimetre) so as to give a fair finish including centering, shuttering, strutting and propping etc., with wooden battens and ballies, height of propping and centering below supporting floor to ceiling not exceeding 4mtr.(Four metre) and removal of the same for insitu-reinforced concrete and plain concrete work including carriage of materials upto all leads and lifts and as per the direction of Engineer-in-Charge.(a)Foundations, footings & bases of columns etc., and mass concrete.
(b)Flat surfaces such as soffits of suspended floors, roofs, landing and the like .Foors etc., upto 200mm( Two hundred milimetre) in thickness.
(c ) Beams, cantilever, girders and lintels i) Sides and soffits of beams, beam haunchings, cantilvers, bressumers and lintels not exceeding 1 Mtr. in depth in all heights from floor.
(d) Edges of slabs and breaks in floors and walls: Under 20 cm. (twenty centimetre) wide.
Providing and laying cement concrete 1:6:12(One cement: Six sand: Twelve graded broken/crushed stone aggregate 40mm(forty millimeters nominal size) mechanically mixed and curing complete, excluding cost of form work in foundation and plinth including carriage of materials in all leads and lifts as per directions of the Engineer-in-Charge.
Providing and laying cement concrete work 1:1½:3 (one cement :one & half sand : three graded stone aggregate 20 mm (twenty milimetre) nominal size) michamically mixed and vibrated for compacting concrete and curing complete excluding cost of form work and reinforcement for reinforced concrete work,but including carriage of materials in all leads and lifts as per directions of the Engineer-in-Charge.(a)Foundation, footing, bases of columns and the like and mass concrete.
(b) Columns, pillars,posts and struts upto all floor level.
( c)Suspended floors, roofs, landing and shelves and their support, balconies, beams, girders, bressumers and cantilever.
(d) Lintels, beams girders bressumers and cantilevers upto all floor level.
Providing Tor steel/TMT steel reinforcement for Reinforced Cement Concrete work including bending, binding and placing in position complete including cost of binding wires completed and other incidentals due for its completion for all floors including carriage of materials in all leads and lifts as per directions of the Engineer-in-Charge.
Demolition below G.L. upto 1.50Metres (One point fifty metres)depth and disposal of unserviceable materials within 20 metres lead including carriage of materials in all leads and lifts as per directions of the Engineer-in-Charge. (i)Un-reinforecd cement concrete upto 15 cm.(Fifteen centimetre) Thickness.
Providing and laying cement concrete 1:3:6 (one cement :three sand : six graded stone aggregate 20 mm (Twenty milimetre)nominal size) and curing complete excluding cost of form work including carriage of materials in all leads and lifts as per directions of the Engineer-in-Charge. a) Foundation and plinth
Demolition of stone masonry above G.L. upto floor two level including stacking of serviceable materials and disposal of un-serviceable materials within 20 metres lead including carriage of materials in all leads and lifts as per directions of the Engineer-in-Charge.(i)Rubble masonry in cement mortar
Providing and laying heavy duty precast cement conrete inter locking paver blocks vibro compacted upto M- 50 grade including border or kurb block grey or coloured over sub-base of concrete with 25mm(twenty five milimetre) thick verage thickness of cement mortar 1:4 (one cement : four sand) laid over and jointed with neat cement slurry mixed with pigment to match the shade of blocks including curing rubbing & polishing complete (Sub base concrete floor to be paid for seprately)including carriage of materials in all leads and lifts as per directions of the Engineer-in-Charge. (i)40mm (forty milimetre) thick block (NTC or equalvent)
Disposal of excavated surplus earth by mechanical transport on approved dumping site surrounding Shimla through all mode of transportation including head load animal load or mechanical means alongwith its leveling and top complete the work including carriage of materials in all leads and lifts as per directions of the Engineer-in-Charge.
Steel work welded in built up sections, trusses and framed work including cutting hoisting fixing in position and applying a priming coat of red lead paint including carriage of materials in all leads and lifts as per directions of the ngineer-in-Charge. (a) In beams joists channels, angles, tee, flats with connecting plates or angle cleats as in main and cross beams, hip and jack rafters, purlins connected to common rafters and the like.
Cement plaster skirting (upto 30cm(thirty centimetre) height) with cement morter 1:3 (One cement::Three sand) finished with a floating coat of neat cement including rounding of junction with floor including carriage of materials in all leads and lifts as per directions of the Engineer-in-Charge. i)15 mm (fifteen milimetre) thick.
MADAN VERMA
Anuil Prasad
Devi Prakash Sharma
KHAJAN SINGH
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .