Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.2 LAccepted-Finance | ₹3.2 L | L1 | Accepted-Finance Accepted being L1 |
| Sl No | Description | Qty | Unit | COOL CONTROL CORPORATION L1 |
|---|---|---|---|---|
| 1.01 | Providing and fixing of air conditioning automatic changeover timer switch suitable for 02 Nos AC units with inbuilt micro controller etc, wall mounted type, auto/ manual i/c connection, testing etc as reqd. (One timer to be useed for Two AC units) | 31 | Jobs | 1,27,627 ₹1.5 L |
| 1.02 | Replacement / supplying & laying of 3 x 2.5 Sqmm PVC insulated, PVC sheathed flexible copper conductor unarmoured cable of 1.1KV Grade on surface/wall i/c making connections, testing etc complete as reqd. (ISI Make) | 200 | Mtr | 41,200 ₹48,616 |
| 1.03 | Supplying and fixing DP sheet steel enclosure on surface/ recess along with 25/32amps 240 volts "C" curve DP MCB complete with connections, testing and commissioning etc. as required. | 31 | nos | 38,037 ₹44,883.66 |
| 1.04 | S/F of following item in exsiting MV panel /MCB DB /Pole Box /free cooling i/c dismentling of faulty unit (if reqd ) i/c ,connections, testing etc comp as reqd. (Make--Legrand or similar superior make).(a) 6-32 A SP MCB 230 V | 31 | nos | 7,285 ₹8,596.30 |
| 1.05 | (b) 100 A 4 Pole Isolator | 10 | Nos | 11,300 ₹13,334 |
| 1.06 | Dismantalling of Existing SAC unit i/c dismantalling of Indoor Unit, Outdoor Unit, Copper pipe , stand and after dismantalling all item handed over to concern TE Incharge etc. as required. | 57 | Jobs | 47,880 ₹56,498.40 |
Tender Value
₹3.1 L
EMD Value
₹6,151
Closing Date
4 Feb 2026, 4:00 pmClosed
The Executive Engineer (E)
O/o Executive Engineer (Electrical) BSNL Electrical Division 1ST Floor, Bhopal House, Lalbagh Lucknow
Supply, Installation, Testing and Commissioning of Split ductable AC units in MAAN node room at various sites under BA LKO. Sh Pdg. AC Controller and Associated work for 57 Nos SAC etc.
2026_BSNL_264354_1
83/TEDL/BSNL/LKO/2025-26, Dated 16/01/2026
Open Tender
Electrical Works
30 days
LUCKNOW
Please refer Tender documents.
2 documents required · 2 mandatory
₹590
ACCOUNTS OFFICER, O/o The PGMTD, BSNL, LUCKNOW
₹6,151
23 Mar 2026
26 Jan 2026
5 Feb 2026
26 Jan 2026
4 Feb 2026
26 Jan 2026
Providing and fixing of air conditioning automatic changeover timer switch suitable for 02 Nos AC units with inbuilt micro controller etc, wall mounted type, auto/ manual i/c connection, testing etc as reqd. (One timer to be useed for Two AC units)
Replacement / supplying & laying of 3 x 2.5 Sqmm PVC insulated, PVC sheathed flexible copper conductor unarmoured cable of 1.1KV Grade on surface/wall i/c making connections, testing etc complete as reqd. (ISI Make)
Supplying and fixing DP sheet steel enclosure on surface/ recess along with 25/32amps 240 volts "C" curve DP MCB complete with connections, testing and commissioning etc. as required.
S/F of following item in exsiting MV panel /MCB DB /Pole Box /free cooling i/c dismentling of faulty unit (if reqd ) i/c ,connections, testing etc comp as reqd. (Make--Legrand or similar superior make).(a) 6-32 A SP MCB 230 V
(b) 100 A 4 Pole Isolator
Dismantalling of Existing SAC unit i/c dismantalling of Indoor Unit, Outdoor Unit, Copper pipe , stand and after dismantalling all item handed over to concern TE Incharge etc. as required.
Please Enable Macros to View BoQ information
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.24 MB
83eNITPdgACControllerBALKO.pdf
Tender Documents • 2.20 MB
BOQ_306736.xls
BOQ • 0.36 MB
Download all tender documents and submit your bid