Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Accepted-Technical | Accepted-Technical accept |
| 2 | Not Admitted-Fee/PreQual/Technical | Not Admitted-Fee/PreQual/Technical No EMD or Fee received |
| 3 | Not Admitted-Fee/PreQual/Technical | Not Admitted-Fee/PreQual/Technical No EMD or Fee received |
| 4 | Not Admitted-Fee/PreQual/Technical | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
Tender Value
₹30 L
Closing Date
26 May 2026, 12:00 pmClosed
BDO Dalot
PS DALOT
NIT09/15/05/2026 Stadium Nirman Kary Daloy
2026_PRD_560121_1
NIT09/15/05/2026 Stadium Nirman Kary Daloy
Open Tender
Civil Works
Percentage
GP DALOT
Please refer Tender documents.
2 documents required · 2 mandatory
₹500
Secretary, RREIS
Yes
11 Jul 2026
18 May 2026
28 May 2026
18 May 2026
26 May 2026
18 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | DETAIL ESTIMATE OF BOUNDARY WALL | - | - | - | - |
| 2 | Earth work in excavatioin in foundation trenches or drains including dressing of sides and ramming of bottoms , lift up to 1.5 m including taking out the excavated soil and depositing and refilling of jhiries with watering and ramming and disposal of surplus Soil within lead of 50 m, as directed. | 136.8 | घ.मी. | 176.7 | ₹24,172.56 |
| 3 | Providing and laying in position Cement concrete including curing , compaction etc. complete in specified grade excluding the cost of centring and shuttering - All Works upto plinth level 1 : 4 : 8 ( 1 Cement : 5 Coarse Sand : 10 aggregate 40 mm nominal size) | 22.8 | घ.मी. | 4,436.54 | ₹1,01,153.11 |
| 4 | cemant concrete in 1:1.5:3 with proper compaction &requare grade | 89.25 | किलो | 6,543.23 | ₹5,83,983.28 |
| 5 | Placing & Removing Of Shuttering and centering of R.C.C. Slab ,lintel etc upto the height of 4.5 meter. | 930.57 | Kg | 351.49 | ₹3,27,086.05 |
| 6 | Supply, fitting & placing of steel bar in R.C.C. work of slab, lintel & columns etc. | 5,354.93 | Cum | 83.01 | ₹4,44,512.74 |
| 7 | brick masonary In super structure in Cement Mortar.1:6 | 68.28 | Cum | 5,551.76 | ₹3,79,074.17 |
| 8 | Plaster on new surface on walls in cement sand mortar 1 : 6 including racking of joints etc. Complete fine finished : 20 mm thick | 1,086.32 | घ.मी. | 203.38 | ₹2,20,935.76 |
| 9 | 50 mm thick Cement concrete including curing , compaction etc. complete in specified grade excluding the cost of centring and shuttering- 1 : 2 : 4 ( 1 Cement : 2 Coarse Sand : 4 Graded Stone aggregate 20 mm nominal size ) | 16.12 | घ.मी. | 427.86 | ₹6,897.1 |
| 10 | Providing and applying Birla / JK White
cement based putty over plastered
surfacefor making surface even and
smooth complet | 105 | घ.मी. | 80 | ₹8,400 |
stage.html
html • 0.02 MB
tech_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.50 MB
stadiumNirmanKarPanchayatKeSamneDalotcompressed.pdf
Tender Documents • 2.80 MB
BOQ_997089.xls
BOQ • 0.36 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .