Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹40.7 LAccepted-Finance | ₹40.7 L | L1 | Accepted-Finance Accepted |
Tender Value
₹48.8 L
EMD Value
₹97,669
Closing Date
17 Jul 2026, 3:00 pmClosed
EE CD-XIX I and FC Deptt. Govt. of NCT of Delhi.
EE CD-XIX I and FC Deptt. Govt. of NCT of Delhi, Basaidarapur Office Complex, New Delhi-110027.
Development of park in B-block 20 point colony in village Ghummanhera in N.G. Block (Matiala Constituency AC-34)
2026_IFC_295113_1
EE/CD-XIX/DB/2026-27/21
Open Tender
Civil Works
Works
120 days
Ghumanhera
Please refer Tender documents.
7 documents required · 7 mandatory
₹0
₹97,669
18 Jul 2026
9 Jul 2026
17 Jul 2026
9 Jul 2026
17 Jul 2026
9 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Supply of earth including royalty excavation, loading, unloading and carriage by mechanical transport and banking the same in layer not exceeding 20cm in depth breaking clods watering rolling each layer with ½ tone roller or wooden or steel rammer sand dressing up in embankment for roads, flood banks, marginal banks and guide banks or filling up ground depressions with all lead & lifts in all kind of soil. | 648 | Cubic Metre | 486.9 | ₹3,15,511.2 |
| 2 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan) including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. All kinds of soil. | 86 | Cubic Metre | 260.3 | ₹22,385.8 |
| 3 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:3:6 (1 Cement : 3 coarse sand(zone-III) derived from natural sources : 6 graded stone aggregate 20 mm nominal size derived from natural sources). | 26 | Cubic Metre | 7,294.7 | ₹1,89,662.2 |
| 4 | Brick work with common burnt clay F.P.S. (non modular) bricks of class designation 7.5 in foundation and plinth in: Cement mortar 1:4 (1 cement : 4 coarse sand) | 93 | Cubic Metre | 7,370.65 | ₹6,85,470.45 |
| 5 | Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level : 1:1.5:3 (1 cement : 1.5 coarse sand (zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources) | 31 | Cubic Metre | 9,045.75 | ₹2,80,418.25 |
| 6 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level. Thermo-Mechanically Treated bars of grade Fe-500D or more. | 4,867 | Kilogram | 107.85 | ₹5,24,905.95 |
| 7 | Centering and shuttering including strutting, propping etc. and removal of form for : Foundations, footings, bases of columns, etc. for mass concrete | 23 | Square Metre | 392.15 | ₹9,019.45 |
| 8 | Centering and shuttering including strutting, propping etc. and removal of form for : Lintels, beams, plinth beams, girders, bressumers and cantilevers | 150 | Square Metre | 736.4 | ₹1,10,460 |
| 9 | Centering and shuttering including strutting, propping etc. and removal of form for : Columns, Pillars, Piers, Abutments, Posts and Struts | 56 | Square Metre | 961.3 | ₹53,832.8 |
| 10 | Providing and laying at or near ground level factory made kerb stone of M-25 grade cement concrete in position to the required line, level and curvature, jointed with cement mortar 1:3 (1 cement: 3 coarse sand), including making joints with or without grooves (thickness of joints except at sharp curve shall not to more than 5mm), including making drainage opening wherever required complete etc. as per direction of Engineer-in-charge (length of finished kerb edging shall be measured for payment). (Precast C.C. kerb stone shall be approved by Engineer-in-charge). | 10 | Cubic Metre | 10,117.6 | ₹1,01,176 |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 5.45 MB
BOQ_392621.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].