Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹99,545.52Admitted-Finance | -66.30% | ₹99,545.52 | L1 | Admitted-Finance |
| 2 | L2₹1.7 LAdmitted-Finance | -44.10% | ₹1.7 L | L2 | Admitted-Finance |
| 3 | L3₹1.7 LAdmitted-Finance | -42.00% | ₹1.7 L | L3 | Admitted-Finance |
| 4 | L4₹1.8 LAdmitted-Finance | -38.11% | ₹1.8 L | L4 | Admitted-Finance |
| 5 | L5₹2.2 LAdmitted-Finance | -25.61% | ₹2.2 L | L5 | Admitted-Finance |
Tender Value
Refer Docs
EMD Value
₹80,000
Closing Date
13 May 2026, 6:00 pmClosed
XEN PHE Poonch
xen phe office poonch
Maintenance/Repair/improvement of Civil Structures/ Pipe Network and restoration of Water Supplies of minor urgent nature of works under Water Supply Schemes in respect of Jal Shakti PHE Sub-Division Mendhar
2026_PHE_309169_3
E-NIT No. 02 of 2026-27 Dated 02 -05-2026
Open Tender
Civil Works
365 days
poonch
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,000
XEN PHE Poonch
₹80,000
26 May 2026
2 May 2026
14 May 2026
2 May 2026
13 May 2026
2 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Excavating trenches of required width for pipes, cables etc including excavation of rocks, dressing of sides ramming of bottoms depth up to 0.50 m including getting out the excavated soil and disposing of surplus soil up to 50 m lead with all kind of soil . | 1 | Cum | 479.3 | ₹479.3 |
| 2 | Earth work in excavation by Mechanical means (Hydraulic excavator) in foundations drains, pipes and cables etc (not exceeding 1.5 M in width or 10 sqm on plan ) trenches including dressing of sides and ramming of bottoms lift upto 1.5 m including getting out excavated soil and disposal of surplus soil as directed within lead of 50 M . All kinds of soil. | 1 | Cum | 256.85 | ₹256.85 |
| 3 | Dismentling manualy /Mechanically including stacking of serviceable material and disposal of unserviceable material within 50 Meter lead
i) Bituminous road | 1 | sqm | 305.95 | ₹305.95 |
| 4 | ii)WBM | 1 | sqm | 156.3 | ₹156.3 |
| 5 | Dismantling tile work in floors and roof laid in cement mortar including stacking material with in 50 Meters lead
a) For Thickness of tiles 10 mm to 25 mm | 1 | sqm | 57 | ₹57 |
| 6 | b) For thickness of tiles above 25 mm and upto 40 mm. | 1 | sqm | 89.95 | ₹89.95 |
| 7 | Demolishing cement concrete manually/ by mechanical means including disposal of material with in 50 mtrs lead
a) 1: 3: 6 or richer mix. | 1 | Cum | 1,725.2 | ₹1,725.2 |
| 8 | b) 1:4:8 Leaner mix. | 1 | Cum | 1,064.55 | ₹1,064.55 |
| 9 | Laying and fitting of GI pipes complete excluding cost of pipes and earth work
a) 15 mm dia | 1 | m | 22.25 | ₹22.25 |
| 10 | b) 20 mm dia. | 1 | m | 22.25 | ₹22.25 |
stage.html
html • 0.03 MB
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.81 MB
BOQ_1001166.xls
BOQ • 0.58 MB
Download all tender documents and submit your bid