Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹17.1 LAccepted-AOC | ₹17.1 L Quoted ₹20.0 L | L1 | Accepted-AOC L1 |
| 2 | L2₹20.8 LRejected-AOC | ₹20.8 L | L2 | Rejected-AOC L2 |
| Sl No | Description | Qty | Unit | Malavika Enterprises L1 | COGNAX AUTOMATION PRIVATE LIMITED L2 |
|---|---|---|---|---|---|
| 1.00 | Lighting transformer 100KVA Charges for removal of coal dust from the outer surface of 100 KVA lighting transformer body, over core & winding by hand blower, tightness checking of the primary & secondary winding and distribution panel board. After completion of the work checking the IR value including the cost all consumables, T&P hire charges etc., Total No of lighting transformer = 6 Nos. (SS-I & SS-II for Station 'A' conveyors-3 Nos. & SS-VI for Station 'B' Conveyors- 3 Nos.) | 12 | Operation | 32,460 ₹38,302.80 | 33,744 ₹39,817.92 |
| 2.00 | Maintenance of lighting equipments Charges for removal of carbon dust deposition in the lighting accessories like MCB/LDBs, light fittings tightness checking of all lighting cables & wires, and attending circuit fault, replacement of bulbs & chokes in the conveyors 27A&B, 26A&B, 25A&B, 24A&B, 36A&B, 22, 23,58A&B, 57, 57A, 54, 50, 50A, 60, 56, 49, 63, BFDs 6,7A,7B,10A,10B, TT4, junction towers, flood light towers -1&3, Security towers 1 to 7, bunker floor ( Unit I, II & III),SS I, SS II, CHS VI, transformer yard and High mast light 1,2 &3, including the cost of consumables, T&P hire charges, etc., complete | 350 | Operation | 19,63,850 ₹23.2 L | 20,42,600 ₹24.1 L |
Tender Value
Refer Docs
EMD Value
₹14,100
Closing Date
2 Jan 2026, 2:00 pmClosed
Chief Engineer/TTPS
O/o CE/TTPS
ICHP- Removal of carbon dust deposition in electrical components such as light fittings, MCB/LDB, Junction boxes, tightness checking of lighting cables wires, attending circuit fault, changing of bulbs chokes, cleaning of all light fittings
2025_EB_633204_1
CE/SE/MI/TTPS/30/2026-2027
Open Tender
Miscellaneous Works
365 days
TTPS
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹14,100
Yes
23 Mar 2026
17 Dec 2025
3 Jan 2026
17 Dec 2025
2 Jan 2026
17 Dec 2025
Lighting transformer 100KVA Charges for removal of coal dust from the outer surface of 100 KVA lighting transformer body, over core & winding by hand blower, tightness checking of the primary & secondary winding and distribution panel board. After completion of the work checking the IR value including the cost all consumables, T&P hire charges etc., Total No of lighting transformer = 6 Nos. (SS-I & SS-II for Station 'A' conveyors-3 Nos. & SS-VI for Station 'B' Conveyors- 3 Nos.)
Maintenance of lighting equipments Charges for removal of carbon dust deposition in the lighting accessories like MCB/LDBs, light fittings tightness checking of all lighting cables & wires, and attending circuit fault, replacement of bulbs & chokes in the conveyors 27A&B, 26A&B, 25A&B, 24A&B, 36A&B, 22, 23,58A&B, 57, 57A, 54, 50, 50A, 60, 56, 49, 63, BFDs 6,7A,7B,10A,10B, TT4, junction towers, flood light towers -1&3, Security towers 1 to 7, bunker floor ( Unit I, II & III),SS I, SS II, CHS VI, transformer yard and High mast light 1,2 &3, including the cost of consumables, T&P hire charges, etc., complete
COGNAX AUTOMATION PRIVATE LIMITED (BID ID -1551091)
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.67 MB
BOQ_757543.xls
BOQ • 0.24 MB
Download all tender documents and submit your bid