Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹9.2 LAccepted-AOC | L1 | Accepted-AOC L1 | |
| 2 | L2₹9.3 L+₹9,162.73 (1.00%)Rejected-AOC | L2 | Rejected-AOC L2 | |
| 3 | L3₹9.4 L+₹19,294.19 (2.10%)Rejected-AOC | L3 | Rejected-AOC L3 |
Tender Value
Refer Docs
EMD Value
₹9,395
Closing Date
13 Mar 2024, 3:00 pmClosed
Block Developement Officer - Gudiyatham
Block Developement Office - Gudiyatham
VELLORE DISTRICT REJUNAVATION OF CHINNA ERI BUNDING STONE FIXING,BHATING GHAT AND DESILTING IN CHETTIKUPPAM PANCHAYATAT GUDIYATHAM BLOCK AGAMT II 2024-25 PACKAGE NO 07
2024_RDTN_443387_1
A9/244/2024
Open Tender
Civil Works
Item Rate
90 days
Block Developement Office - Gudiyatham
Please refer Tender documents.
5 documents required · 5 mandatory
₹0
₹9,395
Yes
2 Aug 2024
7 Mar 2024
13 Mar 2024
7 Mar 2024
13 Mar 2024
7 Mar 2024
Amount
VELLORE DISTRICT REJUNAVATION OF CHINNA ERI BUNDING STONE FIXING,BHATING GHAT AND DESILTING IN CHETTIKUPPAM PANCHAYATAT GUDIYATHAM BLOCK AGAMT II 2024-25 PACKAGE NO 07.
Clearing Light Jungle without alignment and uprooting of wild vegetation, bushes, shrubs, saplings and trees of girth upto 300mm for the strengthening of the bund and the ground shall be left in a perfectly clean condition etc., complete.
Earth work in all Soils except hard rock requiring blasting and conveying for formation of bund with lead of 0 to 100m deploying earth moving machinery and tippers including benching, formation of bunds,
Rough stone dry packing for aprons and revetments including cost and conveyance and all labour charges etc complete
BHATING GHAT (SUB ESTIMATE)
Earth work excavation in all clauses of soil such as hard stiff clay, hard gravelly soil as per SS 20 B for narrow foundation.
Cement Concrete 1:4:8 mix using 40mm HBG metal including cost and conveyance of all materials to site including all labour charges for filling etc complete.
Supplying & Erecting centering for sides & soffiots to Concrete works including cost and conveyance of all materials to worksite and all labour charges etc., complete
P.C.C 1:3:6 mix using 40mm ISS HBG metal including cost and conveyance of all etc.. Complete
Cement Concrete 1:2:4 mix using 20mm HBG metal including cost and conveyance of all materials to work site and all labour charges etc.complete
Letering and Painting Name board
GST Amount for providing service to Government contract works for the above construction works. { GST amount is the Total GST amount for total overall quoted amount above this row in column "BB" for all works in this package}
M SATHIYANANTHAM
N.DHASARATHAN
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_527829.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .