Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹6.5 LAccepted-AOC GRAM KALLIPURAV TIKRA JANPAD LUCKNOW | ₹6.5 L | L-1 | Accepted-AOC I |
| 2 | L-2₹6.9 LRejected-Finance 16 04 CENTRAL MARKET KALYANPURI DELHI EAST DELHI DELHI 110091 | EAST DELHI | DELHI | 110091 | ₹6.9 L | L-2 | Rejected-Finance II |
| 3 | L-3₹7.2 LRejected-Finance 2 317 VINEET KHAND GOMTI NAGAR LUCKNOW | LUCKNOW | LUCKNOW | UTTAR PRADESH | ₹7.2 L | L-3 | Rejected-Finance III |
| Sl No | Description | Qty | Unit | Rajesh Kumar L2 | M/S RADHEY SHYAM CONSTRUCTION L1 | LINE COMMUNICATION L3 |
|---|---|---|---|---|---|---|
| 1.00 | Dismentling of brick work manually/by mechanical means including stacking of all servicable material and disposal of unservicable material within 50 meters lead as per directions of Engineer in charge i/c all labour and T&P etc upte proper completion of wark | 13.83 | M³ | 590.3 ₹8,163.85 | 707.76 ₹9,788.32 | 150 ₹2,074.50 |
| 2.00 | Earth work in excavation for boundary wall including lead up To 30 M lift up to 1.5 m. Excluding Mechanical Compaction but including manual compaction M & dressing upto proper completion of work. | 34.43 | M³ | 84.9 ₹2,923.11 | 87 ₹2,995.41 | 50 ₹1,721.50 |
| 3.00 | Laying 10 cm thick CC in 1:3:6 cement concrete base in cement coarse sand and 10-20 mm stone grit including cost of all materials, labour and Tip etc M upto proper completion of work | 2.3 | M2 | 6,435.1 ₹14,800.73 | 5,711 ₹13,135.30 | 6,000 ₹13,800 |
| 4.00 | First class brick work in 1:4 cement coarse sand mortar including cost of all material, labour and T&P etc upto proper completion of work.. | 61.94 | M³ | 5,281.55 ₹3.3 L | 4,987.81 ₹3.1 L | 6,300 ₹3.9 L |
| 5.00 | 25 mm thick DPC With CC1:2:4 With Graded Stone Grit 10 mm Size including cost of all materials labour and T&p etc upto proper completion of work. | 23.44 | M2 | 96.75 ₹2,267.82 | 92.88 ₹2,177.11 | 75 ₹1,758 |
| 6.00 | Earth work in filling arround barrels and stores including proper manual compaction & proper dressing to maintain stability of the structure and of all lead and lift and of all labour and T&P up to proper completion of work | 78.28 | M³ | 361.15 ₹28,270.82 | 336 ₹26,302.08 | 250 ₹19,570 |
| 7.00 | Laying of 40mm thick in 1:2:4 CC flooring over 40mm thick in 1:4:8 cement concrete base in cement, coarse sand and 10-20 mm stone grit including cost of ali materials, labour and 7&p etc upto proper completion of work | 74.4 | M2 | 805.85 ₹59,955.24 | 752.97 ₹56,020.97 | 780 ₹58,032 |
| 8.00 | Centering and shuttering for R.C.C. work including rent of shuttering Material, Labour and T&P required for proper completion of work | 24.24 | M2 | 765.15 ₹18,547.24 | 695.6 ₹16,861.34 | 780 ₹18,907.20 |
| 9.00 | Laying of R.C.C. 1:15:3 In Slab with kabrai grit 20-20 mm size and coarse sand including cost of all materials, labour T&p etc upto proper completion of Material, Labour and T&P required for proper completion of work. | 4.04 | M³ | 6,777.25 ₹27,380.09 | 6,161.18 ₹24,891.17 | 6,500 ₹26,260 |
| 10.00 | Providing cutting, bending binding & placing in position for steel reinforcement in R.C.C. work including cost of all Material, Labour and T&P required for proper completion of work | 0.21 | MT. | 66,269 ₹13,916.49 | 66,225 ₹13,907.25 | 75,000 ₹15,750 |
Tender Value
₹9.1 L
EMD Value
₹18,264
Closing Date
27 Feb 2026, 11:00 amClosed
EXECUTIVE ENGINEER
OFFICE OF EXECUTIVE ENGINEER L.D-2,.S.C
Rejuvenation work of Barrel No 23 at km 0.050 and Barrel No 13 at km 0.875 of Right Gomti Bund
2026_UPIDC_1118621_1
07/EE/2025-26
Open Tender
Civil Works - Buildings
90 days
Lucknow
Refer tender Doc
3 documents required · 3 mandatory
₹854
₹18,264
Yes
13 Mar 2026
21 Feb 2026
27 Feb 2026
21 Feb 2026
27 Feb 2026
21 Feb 2026
Dismentling of brick work manually/by mechanical means including stacking of all servicable material and disposal of unservicable material within 50 meters lead as per directions of Engineer in charge i/c all labour and T&P etc upte proper completion of wark
Earth work in excavation for boundary wall including lead up To 30 M lift up to 1.5 m. Excluding Mechanical Compaction but including manual compaction M & dressing upto proper completion of work.
Laying 10 cm thick CC in 1:3:6 cement concrete base in cement coarse sand and 10-20 mm stone grit including cost of all materials, labour and Tip etc M upto proper completion of work
First class brick work in 1:4 cement coarse sand mortar including cost of all material, labour and T&P etc upto proper completion of work..
25 mm thick DPC With CC1:2:4 With Graded Stone Grit 10 mm Size including cost of all materials labour and T&p etc upto proper completion of work.
Earth work in filling arround barrels and stores including proper manual compaction & proper dressing to maintain stability of the structure and of all lead and lift and of all labour and T&P up to proper completion of work
Laying of 40mm thick in 1:2:4 CC flooring over 40mm thick in 1:4:8 cement concrete base in cement, coarse sand and 10-20 mm stone grit including cost of ali materials, labour and 7&p etc upto proper completion of work
Centering and shuttering for R.C.C. work including rent of shuttering Material, Labour and T&P required for proper completion of work
Laying of R.C.C. 1:15:3 In Slab with kabrai grit 20-20 mm size and coarse sand including cost of all materials, labour T&p etc upto proper completion of Material, Labour and T&P required for proper completion of work.
Providing cutting, bending binding & placing in position for steel reinforcement in R.C.C. work including cost of all Material, Labour and T&P required for proper completion of work
Cement plaster in 1:4 cement mortar cement coarse sand including cost of all material labour and t&p etc upto proper completion of work.
Painting One priming coat and two coat oil distemper on new work including cost of all material, labour and T&P etc upto proper completion of work.
Providing and fixing Structural steel work in single section fixed with or without connection plate including cutting hoisting, fixing in position and applying a priming coat of approved steel primer all complete as per site Kg. conditions & directions of Engineer in charge including cost of all material labour and T&P etc upto proper completion of work
Providing and fixing welded mesh wire at barrel as per site conditions & directions of Engineer in charge including cost of all material, labour and T&P M² etc upto proper completion of work
Providing, Installation, Testing and Commissioning of ongrid Solar Photovoltaic Power Plant conforming to MNRE specifications as amended, consisting of Mono/Poly Crystalline silicon solar cells, net metering facility, necessary protections, earthing, mounted on Aluminium/Gl structure of suitable strength with following Kwp components complete as per directions of Engineer in charge of all material, labour and T&P etc upto proper completion of work.
Please Enable Macros to View BoQ information
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.96 MB
Tendernotice_2.pdf
PDF • 1.35 MB
BOQ_2079297.xls
BOQ • 0.23 MB
Download all tender documents and submit your bid