| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹6.5 LAccepted-AOC GRAM KALLIPURAV TIKRA JANPAD LUCKNOW | ₹6.5 L | L-1 | Accepted-AOC I |
| 2 | L-2₹6.9 LRejected-Finance 16 04 CENTRAL MARKET KALYANPURI DELHI EAST DELHI DELHI 110091 | EAST DELHI | DELHI | 110091 | ₹6.9 L | L-2 | Rejected-Finance II |
| 3 | L-3₹7.2 LRejected-Finance 2 317 VINEET KHAND GOMTI NAGAR LUCKNOW | LUCKNOW | LUCKNOW | UTTAR PRADESH | ₹7.2 L | L-3 | Rejected-Finance III |
| Sl No | Description | Qty | Unit | Rajesh Kumar L2 | M/S RADHEY SHYAM CONSTRUCTION L1 | LINE COMMUNICATION L3 |
|---|---|---|---|---|---|---|
| 1.00 | Dismentling of brick work manually/by mechanical means including stacking of all servicable material and disposal of unservicable material within 50 meters lead as per directions of Engineer in charge i/c all labour and T&P etc upte proper completion of wark | 13.83 | M³ | 590.3 ₹8,163.85 | 707.76 ₹9,788.32 | 150 ₹2,074.5 Lowest |
| 2.00 | Earth work in excavation for boundary wall including lead up To 30 M lift up to 1.5 m. Excluding Mechanical Compaction but including manual compaction M & dressing upto proper completion of work. | 34.43 | M³ | 84.9 ₹2,923.11 | 87 ₹2,995.41 | 50 ₹1,721.5 Lowest |
| 3.00 | Laying 10 cm thick CC in 1:3:6 cement concrete base in cement coarse sand and 10-20 mm stone grit including cost of all materials, labour and Tip etc M upto proper completion of work | 2.3 | M2 | 6,435.1 ₹14,800.73 | 5,711 ₹13,135.3 Lowest | 6,000 ₹13,800 |
| 4.00 | First class brick work in 1:4 cement coarse sand mortar including cost of all material, labour and T&P etc upto proper completion of work.. | 61.94 | M³ | 5,281.55 ₹3,27,139.21 | 4,987.81 ₹3,08,944.95 Lowest | 6,300 ₹3,90,222 |
| 5.00 | 25 mm thick DPC With CC1:2:4 With Graded Stone Grit 10 mm Size including cost of all materials labour and T&p etc upto proper completion of work. | 23.44 | M2 | 96.75 ₹2,267.82 | 92.88 ₹2,177.11 | 75 ₹1,758 Lowest |
| 6.00 | Earth work in filling arround barrels and stores including proper manual compaction & proper dressing to maintain stability of the structure and of all lead and lift and of all labour and T&P up to proper completion of work | 78.28 | M³ | 361.15 ₹28,270.82 | 336 ₹26,302.08 | 250 ₹19,570 Lowest |
| 7.00 | Laying of 40mm thick in 1:2:4 CC flooring over 40mm thick in 1:4:8 cement concrete base in cement, coarse sand and 10-20 mm stone grit including cost of ali materials, labour and 7&p etc upto proper completion of work | 74.4 | M2 | 805.85 ₹59,955.24 | 752.97 ₹56,020.97 Lowest | 780 ₹58,032 |
| 8.00 | Centering and shuttering for R.C.C. work including rent of shuttering Material, Labour and T&P required for proper completion of work | 24.24 | M2 | 765.15 ₹18,547.24 | 695.6 ₹16,861.34 Lowest | 780 ₹18,907.2 |
| 9.00 | Laying of R.C.C. 1:15:3 In Slab with kabrai grit 20-20 mm size and coarse sand including cost of all materials, labour T&p etc upto proper completion of Material, Labour and T&P required for proper completion of work. | 4.04 | M³ | 6,777.25 ₹27,380.09 | 6,161.18 ₹24,891.17 Lowest | 6,500 ₹26,260 |
| 10.00 | Providing cutting, bending binding & placing in position for steel reinforcement in R.C.C. work including cost of all Material, Labour and T&P required for proper completion of work | 0.21 | MT. | 66,269 ₹13,916.49 | 66,225 ₹13,907.25 Lowest | 75,000 ₹15,750 |
Tender Value
₹9.1 L
EMD Value
₹18,264
Closing Date
27 Feb 2026, 11:00 amClosed
EXECUTIVE ENGINEER
OFFICE OF EXECUTIVE ENGINEER L.D-2,.S.C
Rejuvenation work of Barrel No 23 at km 0.050 and Barrel No 13 at km 0.875 of Right Gomti Bund
2026_UPIDC_1118621_1
07/EE/2025-26
Open Tender
Civil Works - Buildings
Item Rate
90 days
Lucknow
Refer tender Doc
3 documents required · 3 mandatory
₹854
₹18,264
Yes
13 Mar 2026
21 Feb 2026
27 Feb 2026
21 Feb 2026
27 Feb 2026
21 Feb 2026
Dismentling of brick work manually/by mechanical means including stacking of all servicable material and disposal of unservicable material within 50 meters lead as per directions of Engineer in charge i/c all labour and T&P etc upte proper completion of wark
Earth work in excavation for boundary wall including lead up To 30 M lift up to 1.5 m. Excluding Mechanical Compaction but including manual compaction M & dressing upto proper completion of work.
Laying 10 cm thick CC in 1:3:6 cement concrete base in cement coarse sand and 10-20 mm stone grit including cost of all materials, labour and Tip etc M upto proper completion of work
First class brick work in 1:4 cement coarse sand mortar including cost of all material, labour and T&P etc upto proper completion of work..
25 mm thick DPC With CC1:2:4 With Graded Stone Grit 10 mm Size including cost of all materials labour and T&p etc upto proper completion of work.
Earth work in filling arround barrels and stores including proper manual compaction & proper dressing to maintain stability of the structure and of all lead and lift and of all labour and T&P up to proper completion of work
Laying of 40mm thick in 1:2:4 CC flooring over 40mm thick in 1:4:8 cement concrete base in cement, coarse sand and 10-20 mm stone grit including cost of ali materials, labour and 7&p etc upto proper completion of work
Centering and shuttering for R.C.C. work including rent of shuttering Material, Labour and T&P required for proper completion of work
Laying of R.C.C. 1:15:3 In Slab with kabrai grit 20-20 mm size and coarse sand including cost of all materials, labour T&p etc upto proper completion of Material, Labour and T&P required for proper completion of work.
Providing cutting, bending binding & placing in position for steel reinforcement in R.C.C. work including cost of all Material, Labour and T&P required for proper completion of work
Cement plaster in 1:4 cement mortar cement coarse sand including cost of all material labour and t&p etc upto proper completion of work.
Painting One priming coat and two coat oil distemper on new work including cost of all material, labour and T&P etc upto proper completion of work.
Providing and fixing Structural steel work in single section fixed with or without connection plate including cutting hoisting, fixing in position and applying a priming coat of approved steel primer all complete as per site Kg. conditions & directions of Engineer in charge including cost of all material labour and T&P etc upto proper completion of work
Providing and fixing welded mesh wire at barrel as per site conditions & directions of Engineer in charge including cost of all material, labour and T&P M² etc upto proper completion of work
Providing, Installation, Testing and Commissioning of ongrid Solar Photovoltaic Power Plant conforming to MNRE specifications as amended, consisting of Mono/Poly Crystalline silicon solar cells, net metering facility, necessary protections, earthing, mounted on Aluminium/Gl structure of suitable strength with following Kwp components complete as per directions of Engineer in charge of all material, labour and T&P etc upto proper completion of work.
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.96 MB
Tendernotice_2.pdf
PDF • 1.35 MB
BOQ_2079297.xls
BOQ • 0.23 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].